Text
__
[b
nao
,
'
~
UNITED STATES
)
8'
- t,
NUCLEAR REGULATORY COMMISSION
3
REGION 11
Q
8
101 MARIETTA ST., N.W., SulTE 3100
%
ATLANTA, GEORGIA 30303
s
APR 101981
pM,9
Tennessee Valley Authority
8.
)
ATTN:
H. G. Parris
4
g,
g
'
Manager of Power
-
.
'
', u.g;6==
500A Chestnut Street Tower II
,
Chattanooga, TN 37401
c
f
Gentlemen:
A
e
Subject: Report NosMP,741-M1nd
1-lD
This refers to the routine-inspection conducted by L. D. Zajac of this office on
March 23-26, 1981, of activities authorized by NRC Operating License No. DPR-77
and Construction Permit No. CPPR-73 for the Sequoyah facility and to the discus-
sion of our findings held with G. G. Stack at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed eport.
One new unresolved itea resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Parc 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosea inspec-
tion report will be placed in the NRC's Public Document Room. If this report
contains ar,y inforcation that you (or your contractor) believe to be proprietary,
it is necessary that you make a written application within 20 days to this office
-
to withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you within the specified period, the report
will be placed in the Public Document Room.
r
'8105 2 jt oST(r
Q
_
,
j
i
,
1
1
.
~
APR 1.019Rf
'
L
--.
Tennessee Valley Authority
2
Should you have any questions concernii g this letter, we will be glad to di:,.:uss
them with you.
Sincerely,
$ [.
R. C.
wis, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report Nos. 50-327/81-13
and 50-328/81-10
j
cc w/ enc 1:
i
H. J. Green, Division Director
G. G. Stack, Project Manager
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. J. Burzynski, Project Engineer
-
H. N. Culver, Chief, Nuclear Safety
Raview Staff
-
.
l
.