Forwards IE Insp Repts 50-327/81-13 & 50-328/81-10 on 810323-26.No Noncompliance Noted
ML19347E542
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/10/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19347E543 List:
References
NUDOCS 8105120586
Download: ML19347E542 (2)


See also: IR 05000327/1981013

Text

__

[b

nao

,

'

~

UNITED STATES

)

8'

  • t,

NUCLEAR REGULATORY COMMISSION

3

REGION 11

Q

8

101 MARIETTA ST., N.W., SulTE 3100

%

ATLANTA, GEORGIA 30303

s

APR 101981

pM,9

Tennessee Valley Authority

8.

)

ATTN:

H. G. Parris

4

g,

g

'

Manager of Power

-

.

'

', u.g;6==

500A Chestnut Street Tower II

,

Chattanooga, TN 37401

c

f

Gentlemen:

A

e

Subject: Report NosMP,741-M1nd

1-lD

This refers to the routine-inspection conducted by L. D. Zajac of this office on

March 23-26, 1981, of activities authorized by NRC Operating License No. DPR-77

and Construction Permit No. CPPR-73 for the Sequoyah facility and to the discus-

sion of our findings held with G. G. Stack at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed eport.

One new unresolved itea resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Parc 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosea inspec-

tion report will be placed in the NRC's Public Document Room. If this report

contains ar,y inforcation that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this office

-

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you within the specified period, the report

will be placed in the Public Document Room.

r

'8105 2 jt oST(r

Q

_

,

j

i

,

1

1

.

~

APR 1.019Rf

'

L

--.

Tennessee Valley Authority

2

Should you have any questions concernii g this letter, we will be glad to di:,.:uss

them with you.

Sincerely,

$ [.

R. C.

wis, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report Nos. 50-327/81-13

and 50-328/81-10

j

cc w/ enc 1:

i

H. J. Green, Division Director

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

-

H. N. Culver, Chief, Nuclear Safety

Raview Staff

-

.