MONTHYEARBSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 BSEP-98-0055, Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0038, Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0007, Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 2 BSEP-97-0528, Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0500, Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0456, Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant BSEP-97-0410, Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 2 BSEP-97-0373, Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0323, Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0266, Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-97-0219, Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0142, Monthly Operating Repts for March 1997 for Bsep,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Bsep,Units 1 & 2 BSEP-97-0105, Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 21997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 2 BSEP-97-0055, Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 21997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2 ML20138H7881996-12-31031 December 1996 Corrected Monthly Operating Rept for Dec 1996 for Brunswick Unit 1 BSEP-97-0015, Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0451, Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 2 ML20138H7821996-11-30030 November 1996 Corrected Monthly Operating Rept for Nov 1996 for Brunswick Unit 1 BSEP-96-0422, Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0375, Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 2 BSEP-96-0330, Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0295, Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0253, Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0236, Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0204, Monthly Operating Repts for April 1996 for BSEP1996-04-30030 April 1996 Monthly Operating Repts for April 1996 for BSEP BSEP-96-0146, Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0097, Monthly Operating Repts for Feb 1996 for BSEP1996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for BSEP BSEP-96-0053, Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 2 BSEP-96-0008, Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30
[Table view] |
Text
. .
OPERATING DATA REPORT DOCKET NO. 050-0325 h DATE 04/01/81 COMPLETED BY EULIS WILLIS TELEPHONE 919-457-9521 OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT 1 i 50TE5 ~ ~ ~ ~ ~ ~ ~ ~ ~ - ~ ~ ~ i
- 2. REPORTING PERIOD: MARCH 81 I I
- 3. ~ LICENSED THERMAL POWER (MWT): 2436 I I
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
- 7. MAX DEPENDABLE CAPACITY (NET 5'E): 790.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANT (NET 5'E): NONE
- 10. REASONS FOR RESTRICTION IF AST:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 2160.0 35401.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 693.9 1913.1 25715.2
- 13. P.EACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1
- 14. HOURS GENERATOR ON LINE 693.9 1850.8 24232.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
~
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1349616.1 3520162.4 49504184.3
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 434690.0 1151275.0 16476869.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 419843.0 1109608.0 15C57042.0
- 19. UNIT SERVICE FACTOR 93.3 85.7 68.5
- 20. UNIT AVAILABILITY FACTOR 93.3 85.7 68.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 71.4 65.02 56.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 68.7 62.6 54.6
- 23. UNIT FORCED OUTAGE RATE 6.7 8.2 17.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Maintenance, 81/04/17, 1344 Hours
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 4/9/81
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY _____ _____
INITIAL ELECTRICITY _____ _____
COMMERICAL OPERATION _____ _____
1.16 - 9 8104270 3I7
{
il 1
- - i i
j' - APPENDIX B i AVERAGE DAILY' POWER LEVEL -
s l DOCKET NO. 050-0325
! UNIT BRUNSWICK UNI 7 1
[
DATE 04/01/91 ;
-COMPLETED BY EULI8 WILLIS '
l l TELEPHONE 919-457-9521 4
MARCH 81 p -
I ' DAY' AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL i I
i (MWE-NET) (MWE-NET) i f I .683. 17 -395.
r 2 6V2. - 18 594.-
l 3 703. 19 546.
~4- 704. 20 546. ;
] ;
j 5 l' 521. 21 405.
j ,
!. 6- .
365. 22 564.
f 7 580. 23 685. I 8 507. 24 641.
9 653. 25 579.
j' 10 ! 593. 26 709. 3
- 11 682. 2/ /10. r t
12 671. 28 689.
13 '
t 663. 29 643.
14 673. 30 -13.
15 674 31 -13.
16 460.
I i
1.16 - 8 Ilit194419f f f B f f 28 3 9 # 3iIIIE 5 t #IfI 8fIf f f a t f f a $ t fIf 93 9f 3 9 It il f 3 54 ilsfIi 4 9 9 tIf 3 3 3 9 33 9If fit j f 3 3 3i f 31if f f 3 3 3Ii 3 5 tf f 3iI 93 sl POR ORIGINAL
O h O '
UNIT SilUIDOWNS AND POWER REDUCTIONS DOCKET NO. nsn_nus ,
UNIT NAME R ru n cu f e t- m i DATE Anril 19R1 _ _
COMPLETED BY Frnnrou st' 'r.ison REPORT MON 111 March 1981 TELEPHONE as7-os*i j - E E
- , Ig 3 y .'E 5 Licensee ,Ew, geo Cause & Corrective No. Date i 3= $ .2 s 5 Event g3 gO 3 Action to H $ :,, 5 j ;f3 g Report # un U g Prevent Recurrence 6
j 009 81 0305 F 28.3 A 1 NA GENERA While reducing recirculating pump
, speed to remove MG set for brush j replacement, failure of the brush
. rigger occurred causing damage to .
j brush rigger holder.
The MG set collector rings was 4 .
machined. MG set brush rigger and
- - holder was repaired and reinstalled.'
. I 2 3 4
! F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A l'quipment Failure (Explain) l-Manual for Preparation of Data
) Eniey Sheets for Licensee
! B-minienance of Test 2 Manual Scram.
C. Refueling 3 Automatic Scram. Event Report (LER) Fde (NUREG.
D Regulatory Restrictiun 44her (Explain) 0161) i E-Operator Training 1 Ucense Examination F Administrative 5
) G-Operational Error (Explain) Exhibit I Same Source 19/77) Il-Other (Explain) l
h O UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0325 ,
UNIT N AME Brunswick No. I DATE April 1981
! COAIPLETED BY Frnncon Ilnrr knn a
REPGRT MONTH Harch 1981 TELEPilONE 197-os?i i
i
-, .$E 'hg Y Licensee E
% !8% Cause & Corrective No. Date g 3g ,g g 5 Event tt Y 3 Action to l
i
$E 5 j5g Repor
- E0 ju Prevent Recurrence 1 6 1 .
010 81 *0307 F 21.2 A 1 NA IIC llTEXCll 1A north waterbox had bad tube leak, i
Replug tubes that were leaking.
1 l .
1 i
i i
1 i
l t
i
! I 2 3 4 i
F: Forced Reason: Method: Exhibit G Instructions
- S
- Scheduled A lip.:pment Failure (Explain) I-Manual for Preparation of Daia
- U minienance aiTest 2 Manual Scram. Er*ry Sheets for Lie
- nsee
! C Refueling 3 Automatic Scram. Event ReporI (LE RI Fde INUREG.
D-Regulatory Restriction 4 Other(Explain) 0161)
E-Operator Training & Ucense Examination F Administrative 5 G Operational Error (Explain) Eshibit I Same Sour;c 19/77) Il-Other (E xplain)
e C *
~ C V e C
k g
2: L
, W C V,o
.:c cc m
d t-e -3 o
U 3
D z
e e m V c, U >
- y et 3 T. V u kJ o c t cr o G $ * -e *u CA~~
b i ' c:n ~ c i = mu =q8a 2 C ,c"u e o 3 s e u. s e o e .C s,tW Q-s N Cim 4 4 e w w Q c. W
<C .c u C o . w o - - .a g w w .cd-
-d.2 3= -
W c 4 c"W 7 W* >m Z m
-43 2
s 2*
ou o
mm oo
~2.5 z c. m.
>Z< c< W" 7 o G % os zu > 0.u 4u -
w H 3 4"2 --
m o o3 -mm -
aH - W w g<c
- =c wa s=
ow 32xc-
= c. -
2=
z a, aa w a o
> a- - u- n- e ,v e -
D
.e.H Q
-e w g u e aJ wcwwo- w i o w= cs w '
V o ?! 30 y e '
aw :c m a M N O C eo a=
ou u
Q .a.e . ;n *
-> % -J o= cc C/3 J 2*. C m
Z e O
C s . n~
d U w 53P03 w .EO$
m-a-
e e
tuauodtuo3 z C
2 mg g ,3 U M . . q ; @ *-. -
M 2335
- - C- ,3 g a W u e P390) m 533<3-u4e 0 g f. tuaisiS v 2.!- A M a.
C C z
A Z
. M m O u u z 2 3g-3: H C o
.-d ?a .o o-E C C
O a m <
H W z -
D
=
3 R
-J418.*CJM tlWM y $urtinys
^
g 7
.lo PtytoW c. 5 v
1
- m .
l w 53 W n
w t
.thl5EJM uO -M
"; w
' < E 29 3
-a, .H m 33 o C u ,M 'C'-
t u- =;a s
(unol{} c if OH -
=.;s; -=22S as9 5m m -
ungem0 - ==-
" .: E: 252E23 1 3 C 10 9 C ft 4 5= 1 C. 3 - - = =
-s L, M =o *ac%o<OO l l3dk -
. E d dCC-dio-l es l
m O
u m z o l
C w J
x .
,f vsJ o Ie C,.
Ce
4 . 6m c P%.
w :;-
O -
l I
l l
b i
DOCKEINO. 050-0325 ,
UNIT SliUTDOWNS AND POWER REDUC 110NS -Brunswick No. 1 UNIT NAM E DATE- April ingi COMPLETED BY Pr an~ c um vicon REPORT MONTil March 1981 TELEPHONE 457-9521 i
1 w
Q0 _
a l :, E_E 3 j Ei Licensee Evo ., Cause & Curreceive l*3 No. Date & 38 $ 2s5 Event (3 gO Action to
- $ ,, 5 j I?3 g Report # va O g Prevent Recurrence d
i .
012 81 0316 F 10.5 A 1 NA IIC llTEXCil 1A south waterbox had tube leaks.
1 Replugged tubes that were leaking.
1 .
i 1
4 i .
I i
i 4
I 2 3 4 Exlubit G Instruesions 5
F: Forced Reason: Method:
S: Scheduled A nluipment Failure (Explain) 1 Manual for Preparation of Data l' Entry Sheets for Licensec It Maintenance of Test 2. Manual Scram.
C. Refueling 3 Automatic Scram. Event Report (LER) Fde INUREG.
. D Regulatory Restriction 4 Other (Explain) 0161)
E Operator Training & Ucense Examination
), F Administrative 5 G-Operational Error (Explain) Exhibis I .Same Source l
j 19/77) Il Other (Explain)
I
'D D 050-0325 1
- DOCKET NO. .
UNIT SilUTDOWNS AND POWER REDUCTIONS B rim <:u l c k Nn. 1 UNIT NAME DALE April i oni COMPLETED BY Frnnres Harrison REPORT MONTil March 1981 457-9s?1 TELEPif0NE t
- - E E
.$g 3 $D Licensee ,E g je. Cause & Correceive 5= 2s5 g3 Action so No. Date i i Event g~3 l
W d i:, 5 j;5g Repori# mu g* Prevent Recurrence i c5 i
013 81 0317 F 5.7 A 1 NA CA INSTRU The actuation screw for 1-B21-PS-N021D was out of adjustment causing the pressure switch to be out of calibra-tion.
l Switch actuation linkage was adjusted to provide normal operating band and switch was calibrated, declared operable, and returned to service.
1 I 2 3 4 F: Forced Reason: Method: f xhibit G . Instructions S: Scheduled A.I'quipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Seram. Entry Sheets for Licensee C Refueling 3 Automatic Scrain. Event Report (LERI File (NUREG.
D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F. Administrative 5 G-Operational Error (Explain) Eshibit 1.Same Source "
19/77) Il-Other (Explain)
b b b DOCKET NO. 050-0325 ,
UNIT SliUTDOWNS AND POWER REDUCTIONS Brunswick UNIT NAME DATE April 1981 COMPLETED BY F. IIn rri son REPORT MONT11 }1ARCil 1981 1ELEPHONE 457-9521 e.
, $3 3 Y Eicensee ,E **,, o k"y Cause & Corrective Action to No. Date i 5g i .s s 5 Event ??
nb U 8-
$E E j;gg Repott# Prevent Recurrence d
014 81Q320 F 30.8 A 1 N/A IIC llTEXCil Tubes leaking in A-South condenser waterbox.
llelium leak cliecked and plugged in tubes in A-South waterbox. .
l I
i l t 2 3 4 F: ForccJ Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data li Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee d
C Refueling 3 Autunutic Scram. Event ReporI(LERI File (NURLC.
D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F Administrailse 5 G. Operational Error (Explain) Exhibit I Same Source 08/77) Il-Other (Explain)
(
e C .
- O -
- r a i - =
" .L .
"
=
C m N -
L 7 A T Z
- :n N c%
%Z g :
- g
" 3 Z
M 3 o c a -
C : - c e g -
0-Dv i e - c e % y
x--6 3 C : u C N e n e u e ~[
r 3- aM3a mx 3
=
c c < 4 4 o
.c W
su -
- e sY w W
- C :n U y
C O u 5 *13d 2 % *'
I C*WW>W Ug 4 b o [ .*.*. 5*
O T ,J *$,
7<-o Z < P= CIR z
.- s
= =v o' 4" / uns&
2 % HI 022 4~.
t u
- i. 5- d =e-xg~ ,& Oi z .=
- W g<=u o= - o> d gz a .a =u n u u a-cauc>-oe a
xD sg y s
C au e
- u o 3 - :n wcwwo w a
.r.
o " k o E v u .= z .= o w w mu ec : u ea u . u :c C-u .J C u o auu u-z oz
- - o c. u -
ooc = oo x v :z: E. u u M .
Z =
0 < .c f 5 S*903 5 55.y" g guacoduro3 g g
[
n O .. M - $ w='
mS .y g t 72 5 -ee-3 53 5 5 p*P03 R
- b $ 5 k.= 6 3: tuatsig 2 - F. A r o
a.
C m z
==
z
. M m o
- a w .
o Z e
-Er o 3 W .C o e. --o >. c.
d .o < c w a x z o
.O a. =n 3 w =
M -
?
m a W
d iJOI.' u d ILW Q W Z Su!!!nys m e
D n
3
=
g JoPoyl3N .2 c,. 3 c.
m 53
-uosny <
uC 4 .=a
.~! ., r 6
se == :_
.=,
.a u C U .*i =
u; x :; .c .2
- a ; 7 c.
(smogg) . -c = =e e . a2- .2 : - ;; : w uottema o =~
. . =. ai .7 z, 'a: s -
u =
C =, . = % = y~M
- 7. y*4 u9 ra vC.
7- ;. = = q "< q o x < d G = w ti o=
adii 'e-ce
5]
& ~3
- ..C, C, .
c N e P.
-)* o . wm q
?
O g - - ~ - -
e- --- e-- - m.- , - - .r-, ,, - .- -- - - - . - - - - - - - , , - , - - - -
APPENDIX DOCKET NO: 050-325 UNIT: Brunswick No. 1 DATE: April 1981 COMPLETED BY: Frances Harrison OPERATIONS SLT'ARY BRUNSWICK UNIT NO. 1 Brunswick Unit No.1 operated at a 93.3% availability factor for the month of March with a 71.4% capacity factor. There were six power reductions this month, and one "off-line" outage, both are detailed in Appendix D, the unit shutdowns and power reductions log.
There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick Unit No. 1 fuel pool.
e #
. . e . .
yYwp..
b 4p7 Q m ;q . ,. p s.,...
. . ..e .j -
sp . .,s,-
. .. . -, %- w. .
r v .m. e
.p.te. .=. g , g l.l s 9. *. L.9
I.g gJ.
. =t . _ .se.'M. g1 p!+g....... . . = . -lg., f I. 6 .-
4 M& F.
- ' on
=
=. $ e.6h O.h.$,..f.*.
p m. g.n o m..
W
.a s m .- e
e 8.k$.
.U .
g e6
, - amo
.- .y.%. fsa 9 gu.p. . . .
q ,g. W e g *g..ge ..# .
, M. e*.I
. e gw.
W.A
,.,. ye p g .
go .e yg. e
.-1. w .*. , -- j _-
m99m e.
i ,qgp e gg, u v .4 J.
m g
. 3 1= g.ppgme m9ye,
,_..j, 4 .
2.,A %.
.$'P-W - g 1
6 . d .Sm.. 6a % .m II 6 e .
.t-/
g .- e.
- 4. A a -. o .
e =- g A or
-A. ,.=f4 ., . -f *
. esue . 44>
.,.e'
,.y",..S' e . Y. f e s . .. .g .
M . 4 e. e e'.--> . e
.g
= g .l.
, ." .- e6 em . . e h O
? * *tM "
a5 e".,
e.
%., g f 9 e. e. . S n
..f
m ge .t a sump
% *. .% I h'
. ee
, m e .a " e
.e.
.. J
} m #q e a.Tb.. M*.'S q q 4 .
y e .J7e
..yg
- 4. s e am a
1b
J e 'd m
'.# E
. ., , . +
eb
. -g> g .a,q:. e .,
- a. . s.
e p' %g .
ea 4g WP N. S .d.y * %. .
8 g- a m.
w J
e s a
.+.a
4 9 .5 P00RBRWNAL
OPERATING DATA REFORT DOCKET NO. 050-0324 DATE.04/08/81 COMPLETED BY EULIS WILLIS TELEPHONE 919-457-9521 OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
- 2. RE?ORTING PERIOD: MARCH 81 I I.
- 3. LICENSED THERMAL POWER (MWT): 2436 I I J.~NAME? LATE RATING (GROSS MWE): 867.0 I I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
- 6. MAX DEPENDABLE CAFACITY (GROSS MWE): 915.0 I I.
- 7. MAX DE?ENDABLE CAPACITY (NET MWE): 790.0- -------------------------------
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST RE? ORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REFORTING PERIOD 744.0 2160.0 27425.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 101.9 1257.4- 30279.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
.14 HOURS GENERATOR ON LINE 101.9 1176.7 28140.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 178109.2 1944271.0 51555651.8
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 60459.0 -670824.0 17235270.0
- 18. NET ELECTRICIAL ENERGY GENERATED (MWH) 53081.0 640099.0 16545508.0
- 19. UNIT SERVICE FACTOR 13.7 54.5 59.3
- 20. UNIT AVAILABILITY FACTOR 13.7 54.5 59.3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 9.0 37.5 44.2
- 22. UNIT CAPACITY FACTOR (USING DER NET) 8.7 36.1 42.5
- 23. UNIT FORCED OUTAGE RATE 86.3 40.3 13.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE,-DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UF: J/ 9 /81
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------
INITIAL ELECTRICITY -------- --------
COMMERICIAL OPERATION -------- --------
1.16 - 9
O h O i
DOCKET NO. 050-0324 .
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick No. 2 DATE April 1981
} COMPLETED BY Frances llarr1 son REPORT MONTil March L98i TELEPHONE 457-9521 r
":. /
I E "E Eb Licensee Ee !% Cause & Corrective No. Date -h j$ $ 3j$ Event
{i hu Action to H
f5 5 j;gg Report # mO g Prevent Recurrence 6
010 810'105 F 642.1 A 2 NA Sil SUPORT The unit was separated from the grid for a snubber outage.
The outage will be detailed in a report submitted for the month the, unit returns to service.
e I 2 3 4 l F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A li mpment i Failure (Explain) 1 Manual for Preparation of Data B-mintenance of Test 2 Manual Scram. Entry Sheets for Licensee C.Hefueling 3. Automatic Scram. Event Reporn (LER) Fde (NUREG.
D Regulatory Restriction 4-Other (Explain) 0161)
E Operator Training & License Examination l F Administrative 5
! G Operational Error (Explain) Exhibis 1.Same Source l
19/77) II Other (Explain) l _ -
APPENDIX DOCKET NO: 050-324 UNIT: Brunswick No. 2 DATE: April 1981 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 operated at a 13.7% availability factor for the month of March with a 9.1% capacity factor. There was one "off-line" outage, it - is detailed in Appendix D, the unit shutdowns and power reductions log.
4 There are 264 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.