F

TIC

.

[g nr. 'o,^

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

,

3

.E

REGION ll1

,

e

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

.....

!.'.*? I *? bcj

/Tx

c?d

\\y _L * Nf s5 y'

9 86lV lm) '\\'.)

4l124

t

e-

9

v{q ,, 0 m .

Docket No. 50-266

c

t~

'

%

A

dy %f Al$

Wisconsin Electric Power Company

$

ca#4:

.~ n~x, % [/

4

ATTN:

Mr. Sol Burstein

A

-

Executive Vice President

y.

s\\

Power Plants

N'. .

231 West Michigan

Milwaukee, WI 53201

Gentlemen:

This refers to the routine inspection conducted by Messrs. D. L. Robinson

and I. N. Jackiw of this office on February 24-25, 1981, of activities

at Point Beach Nuclear Power Station, Unit 1, authorized by NRC Operating

License No. DPR-24 and to the discussion of our findings with Mr. G. A. Reed

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will o~e placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty-five days of the date of this letter, to

withhold such information from public disclosure.

The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietenf

information identified in the application is contained in an enc;osure

to the application.

B 10A 24 0

1

.

Wisconsin Electric Power Company

-2-

VA0 ! " 1 c'.

5

We will gladly discuss any questions you have concerning this inspection.

'

Sincerely,

4."$. 7)e A -=-

_

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Report No. 50-266/81-04

cc w/ encl:

G. A. Reed, Manager

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

'

NSIC

TIC

,

John J. Duffy, Chief

Boiler Inspector

Peter Anderson, Wisconsin's

Environmental Decade

Mr. Stanley York, Chairman

Public Service Commission