Discusses Status of Acceptance Review of Facility Application for Ol.Requests That Primary Coordinating Branches Submit Results of Acceptance Reviews by 810422
ML19347E155
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/21/1981
From: Calkins G
Office of Nuclear Reactor Regulation
To: Tedesco R
Office of Nuclear Reactor Regulation
References
NUDOCS 8104240135
Download: ML19347E155 (2)


Text

.

d T

U 7

s' 77 47 April 21, 1981 m

4

,N L

t MEMORAtiDUM FOR: Robert L. Tedesco, Assistant Director 2

APR 2 3198W for Liceising, DL 4

m ]

co moa THRU:

A. Schwencer, Chiaf Licensing Branch #2, DL

% g ad

  • FROM:

G. D. Calkins, Project Manager Licensing Branch #2, DL

SUBJECT:

STATUS OF ACCEPTANCE REVIEW OF LIMERICK APPLICATION FOR OPERATItiG LICENSE Philadelphia Electric Company tendered its application for an operating lieense for the Limerick Generating Station, Unit Nos.1 & 2, on March 17, 1981.

It consists of Final Safety Analysis Report (FSAR)

Environmental Report (ER),

Emergency Plan (EP), Fire Protection Report (FPR) and Probabilistic Risk Assessment (PRA).

The primary or coordination responsibilities for the acceptance review are as follows:

FSAR EG&G Idaho (except for FPR portion)

ER Siting Analysis Branch (with inputs from AEB, HGEB) l EP Emergency Preparedness Licensing Branch FPR Olemical Engineering Branch PRA Reliability & Risk Assessment Branch l

Initially we were planning to complete the acceptance review in 30 days, by April 16,1981. However, this will not be possible. As a result of illness of the key person at EG&G Idaho they will not mail their results to us until April 17, 1981.

(Aaril 10,1981, was previously promised.)

Two problems have developed in the acceptance review of the ER.

First HGEB had indicated they are not scheduling completion of the hydrology review until l

May 15,1981, because of lack of sufficient resources. Second, AEB did not l

consider the PRA to be part of the application. The items they found missing I

from the ER appears to be in the PRA. AEB recently has requested a memorandum l

stating that the PRA is part of the application tendered for staff acceptance l

and is to be considered by AEB in their review.

1 l

1

m:rp W
J 's A v t }

j

4.g ).

\\ -

o ; 7 :.i m : m ucu n ;

C F.:iC LE R E C O R C C 2.:' '

~

~"c

-4

,,g ar Robert L. Tedesco p-

.- 4,.

By copy of this memorandum, the pri to submit the results of their ac ceptance reviews to me by April 22 m supporting branches are requested to c this schedule.

Also by copy of this memorandum AEB i es ted omplete their reviews in time to meet the PRA in their review

, 1981 All 1981, that this is an ac. HGER is reminded, per my telephon s requested to consider the PM no la ceptance review which must be completede call of Ap of resoucces.ter than April 22, 1981, and should require onl with inputs to y a small expenditure Licensing'8 ranch #2G. D. Calkins, Projec Division of Licensing DISlRIBUTION

~

D. 4 Files (50-352/353)

NRC PDR cer GDCalkins MService TERA NSIC GLear HGES V8enar,o WRegan,ya,CEB SA8 WHouston,AEB FPagano,EPLB,I&E 3

ATh adani,RRAB OELD ACR5(16) 1 i

OI&E(3)

^

L : LB =2..

DL -

O2 alkyds:lb ASchkncer...0L![

.RLTeddco.

/ r/81 4/p(/81 4W

'