Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-416/80-29
ML19347E129
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/13/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19347E130 List:
References
NUDOCS 8104240071
Download: ML19347E129 (1)


See also: IR 05000416/1980029

Text

.

,

,

[/b

+** %,'1'

"'

-

UNITED STATES

d

NUCLEAR REGULATORY COMMISSION

o

REGION 11

O

f

101 MARIETTA ST., N.W., SUITE 3100

D

af

%,*****#

APR 131981

ATLANTA, GEORGIA 30303

'

Mississippi Power and Light Company

p

AT1N:

N. L. Stampley

sr

Vice President of Production

E

,

P. O. Box 1640

-

.S

j6

Jackson, MS 39205

/gg

73

Gentlemen:

%

Subject: Report No

6/80-h9)

Y'

/g

This refers to your letter of March 30, 1981, responding to the Notice of

Violation sent to you in our letter dated March 6,1981. A telephone discussion

was held on April 9,1981 with J. W. Yelverton of your staff and F. S. Cantrell

of this office. It is our understanding as a result of this discussion that you

will provide a supplemental response concerning the violation by April 20, 1981.

We appreciate your cooperation with us.

Sincerely,

E.c.

'

-

R. C.

ewis, Acting Director

Division of Resident and

Reactor Project Inspection

cc w/ encl:

C. K. McCoy, Plant Manager

8104240 0 1 \\

__ .

.

.

,

.

,

.'

.

.

~

MISSISSIPPI POWER & LIGHT COMPANY

Helping Build Mississippi

P. O. B OX 1640, J ACKS O N, MISSISSIP PI 39205

.I; n i

P 1

5"

JAMES P. McGAUGHY. JR.

~

~~~

March 30,1981

Office of Inspection & Enforcement

U. S. Nuclear Regulatory Commission

Region II

101 Marietta Street, N.W.

Suite 3100

Atlanta, Georgia 30303

Attention:

Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT: Grand Gulf Nuclear Station

Units 1 and 2

Docket Nos. 50-416/417

File 0260/15525/15526

RII:WHM 50-416/80-29; IE

Inspection Report of December 1-

31, 1980

AECM-81/128

In response to your letter dated March 6, 1981, which transmitted the

subject inspection report, we submit our response to the NRC Severity Level V

Violation identified in Appendix "A" of your letter.

In response to Violation

Item Number 416/80-29-01, " Control of Temporary Alterations", our response is

provided in Attachment A.

We find no proprietary data contained in the inspection report.

st l

Yog&dy

fJ. P. McGaughy, Jr.

e

EWC:mt

Attachment

ec:

Mr. N. L. Stampley

Mr. G. B. Taylor

Mr. R. B. McGehee

South Miss. Electric Power

Mr. T. B. Conner

Association

P. O. Box 1589

Mr. Victor Stello, Director

Hattiesburg, MS 39401

Office of Insp. & Enforcement

U. S. Nuclear Reg. Comm.

Washington, D.C. 20555

hOYO$7hbS} h

Member Middle South Utilities System

. .

.

.

.

'

,

.

.

MC~ISSIPPI POWER O L12HT C*JMPANY

.

Director of Office of Inspection & Enforcement

AECM-81/128

Page Two

i

1

STATE OF MISSISSIPPI

COUNTY OF HINDS

Personally appeared before me, the undersigned authority in and for

the jurisdiction aforesaid, J. P. McGaughy, Jr., who being by me first duly

,

/

sworn, stated on oath that he signed the above and foregoing on the day and

year therein mentioned, and that the information contained therein is true and

correct to the best of his knowledge and belief.

\\ k

aA

1

j~

Y

V

SWORN TO AND SUBSCRIBED beforA me, this the 30th day of March, 1981.

(

_=_M

f ^fi

,

My Commission Expires February 13.195.

,

_ _-

_

_ - . _ _ _ __

_

..

. _ -

_

_ _ . .

_.

-

,

,

.

.

,

4

.

.

.

Attachment A to AECM-81/128

Page 1 of 1

RESPONSE TO VIOLATION NUMBER 416/80-29-01

" CONTROL OF TEMPORARY ALTERATIONS"

1.

Admission Or Denial Of The Alleged Violation

Mississippi Power & Light admits that the report of the violation was

correct as stated.

2.

The Reason For The Violation

The responsible Checkout and Turnover Organization (CTO) Engineer

misinterpreted the CTO Manual requirements and failed to tag or log the

temporary modification after completing the system flush procedure.

Bechtel CTO Manual, Chapter 4, Section 11, para 4.2.1, states temporary

modification tagging is not required if modification is perforaed as part

of a flushing procedure.

CTOM, Chapter 5, Section 9, para 8.1, states

system to be restored after flush to the condition required by current

operating conditions. A differential pressure gauge was installed across

temporary suction strainer per requirements of flush procedure and was

left installed in the system at the request of Start-up Test Supervisor to

be used in subsequent test. At this point, the CTO Engineer

misinterpreted the CTO Manual requirements and failed to tag or log the

temporary modification af ter completing the system flush procedure.

3.

Corrective Steps Taken And Results Achieved

No other temporary tag log errors were noted on this system and the

subject modification has been corrected.

4.

Corrective Steps Taken To Avoid Further Noncompliance

The responsible Engineer has been instructed on the correct interpretation

of the CTO Manual.

5.

Date To Achieve Full Compliance

Full compliance was achieved by February 12, 1981.