Text
,
f/D Washington Public Power Supply System A JOINT OPERATING AGENCY
$h eo aos im swa.was moto m i
. o im>.u..us fiarch 25, 1981 G03-81-853 Docket flos. 50-508 50-509
/[ (
Mr. R. H. Engel ken t
Director, Region V
/g h
.j US fluclear Regulatory Commission gl Mg y 3 I981% d gpg Y 4
Walnut Creek Plaza, Suite 202 u
1990 fl. California Blvd.
O,,, %cQj'@'
MAR 301981 -'
Walnut Creek, California 94596 9
p ggy,
INSPECTION &
Dear Mr. Engelken:
Cu WomN g
f
Subject:
PROJECT fl0S. 3 AtlD 5 RESP 0flSE TO IE BULLETIfl 79-03A
Reference:
Letter, G03-80-1910, D. D. Renberger (WPPSS) to R. H. Engelken (flRC), Same Subject, dated 8/8/80 The Supply System has determined that no SA-312 or A-312, Type 300 series fusion welded pipe with design stresses in excess of 85% of allowable is being used at the WflP-3/5 projects. We expect that the above finding and this letter close out our actions on the subject bulletin.
Very truly yours, j
l Progran Director (Acting) WHP-3/5 I
cc:
D. Smithpeter, BPA WflP-3/5 Files, Richland H. D. Thornburg, Director l
W. Woods, fl0S j
fl. S. Reynolds, D & L Ebasco fly (Licensing)
P00R ORIGINAL 8104140gSQ El 'lO