ML19347D930
| ML19347D930 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 04/07/1981 |
| From: | Peterson D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML18046A568 | List: |
| References | |
| NUDOCS 8104140493 | |
| Download: ML19347D930 (3) | |
Text
.
c AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-255 UNIT Palisades DATE h-7-81 DPeterson COMPLETED BY TELEPHONE (616) 76h-8913 MONTH Vn nh 7081 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(ywe. Net) 1 Th5 17 750 Ib6 751 2
jg 3
7s1 39 75h 4
Th8 750 20 g
Th9 Th9 21 750 22 Th9 6
f 751 7
755 23 Th7 s
751 24 9
750 25 vho Th8 Tho 10 26 T52 730 11 27 12 Th5 73h
,3 13 Tho 39 715 14 Th9 III 30 15 Th9 699 31 16 757 INSTRUCTIONS On this format. list the average daily unit power levelin MWe-Net for each day in clie reportmg month. Compute to the nearest uhole megawatt.
(9/77) 810.41.4 0Yib
e
SUMMARY
OF OPERATING EXPERIDICE FOR MARCH 1981 Plant ran at near full power for entire month of March.
a, OPERATING DATA REPORT DOCK ET NO.
50-255 DATE h-7-81 COMPLETED llY DPeterson TELEPHONE f616) 764-8913 OPERATING STATUS Palisades Notes
- 1. Unit Name:
- 2. ReportingPeriod:
810301-810331
- 3. Licensed Thermal Power (MWt):
99'n
- 4. Nameplate Rating (Gross NWe):
All 7 805
- 5. Design Electrical Rating (Net MWe):
- 675
- 6. Maximum Dependable Capacity (Gross MWe):
- 695
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since La>t Report.Gise Rea>ons:
- 9. Power Level To which Restricted,if Any (Net MWe):
- 10. Rea>ons For Restrictions. !f Any:
i i\\
This Month Yr..t o.Da t e Cumulative
- 11. Ilours In Reporting Period Thh 2160.0 81,375.0
- 12. Number Of Hours Reactor Was &.ical Thh 2190.h 45.661.8
- 13. Reactor Resen e Shu.Jown Hous
- 14. hours Generator On,l,in.-
7h4 2191.4 h1.125.h
- 15. Unit Reserve Shatd'mn llours
- 16. Gross Thermal Ener;hGenerated (MWHJ 1,M7 nnA 5.390 y9A '
Aq,n39 A6h
- 17. Cross Electrical Ener;y Generated (MhH) 9R7-3nn 1 661 6?n 96_??6 nho 1S. Net Elenrical Energy Generated 1.MWH) 551.556 1.577.052 2h.627.356
- 19. Uni: Sen-ice Factor 100 08.0 sp_8
- 20. Unit Anilability Factor 100 08.0 99.8
- 21. Unit Capacity Faetor IUsing MDC Net) 117.2 115.0 47.7
- 22. Unit Capacity Factor IU>ing DER Net) 09.h 00.7 97.6
- 23. Unit Forced Outa.ge Rate n
1_q 12.8
- 24. Shutdowns Scheduled Over Ne.st 6 Months (Type. Date.and Duration of Fach n
- 25. If Shut Down At End Of Report Period, Estimated Date of St::rtup:
- 26. Units In Test Statns IPrior to Commercial Operation):
Forecast Achined
/
INITIA L CRITICALITY L
INITIAL ELECTRICITY
\\
COMM ERCI \\L OPER ATION
- Based on Condenser Back Pressure.
~ (b/77)
, -