ML19347D888

From kanterella
Jump to navigation Jump to search
Submits Method for Determining ECCS Outage Times Per .Method Responds to NUREG-0660/0737 Requirement II.K.3.17.Cumulative Times to Be Given for Each ECCS Subsys.Info to Be Provided by 810601
ML19347D888
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/09/1981
From: Hukill H
METROPOLITAN EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0660, RTR-NUREG-0737, RTR-NUREG-660, RTR-NUREG-737, TASK-2.K.3.17, TASK-TM L1L-087, L1L-87, NUDOCS 8104140401
Download: ML19347D888 (1)


Text

.

Metropolitan Edison Company Post Office Box 480 Middletown, Pennsylvania 17057 Writer's Direct Dial Number April 9, 1981 LlL 087 S

= ~ -.

g s',T U D. Q e.

r Office of Nuclear Reactor Regulation ce:7M gy,j,

O.Q,j'/ g y Attn:

D. G. Eisenhut, Director M

/

Division of Licensing

,37 y,,J,7

'7

/ p U. S. Nuclear Regulatory Commission T

u,'.

Washington, D.C.

20555 i~:

E/87A ~l-2!

\\.

t We, p/

Dear Sir:

,\\

~

,c +7 p p/

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 ECCS Outages (II.K.3.17)

As discussed in our letter of January 23, 1981 (TLL 680) and a previous phone conversation between C. W. Smyth (GPUN) and D. Dilanni (NRC) the following method was agreed upon to determine ECCS outage times and is responsive to NuReg 0660/0737 requirement II.K.3.17:

a.

Review LER's for last five years to get approximate outage times for ECCS systems for failures.

b.

Review Technical Specification Surveillance times for last five year to get approximate average outage times for ECCS systems.

Cumulative outage times will be given for each major subsystem of the ECCS.

These outage times will be considered quite conservatively and include events which made the ECCS partially or totally unavailable. The following systems are considered to be part of the ECCS system:

a.

Decay Heat Removal b.

Core Flood c.

Reactor Building Emergency Cooling d.

Makeup and Purification e.

Reactor Building Spray f.

Reactor Building Purge g.

Reactor Building Isolation i

h.

Emergency Diesel Generators The review of operation and maintenance records will include January 1,1976 to December 31, 1980. This information will be provided by June 1,1981.

810414 0 kD\\

f Si cere y, cc:

H. Silver h.

. ukill

'$l D. Dilanni Director, TMI-l l

Metrocoutan Edison Comcan/.s a Memter of the Gereral Puche Ut I,t<es System