ML19347D777

From kanterella
Jump to navigation Jump to search
Request for Production of 69 Documents on Behalf of Intervenors Congressmen Dellums,Burton & Burton
ML19347D777
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 03/16/1981
From: Halterman H
AFFILIATION NOT ASSIGNED
To:
GENERAL ELECTRIC CO.
References
INTV-810316, NUDOCS 8103270573
Download: ML19347D777 (6)


Text

3.16.1981 a

./

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION tented CORRESPONDENCE BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

, 1 1 H%,,

In the Matter of 8

"r DC(,h GENERAL ELECTRIC COMPANY

)\\ DOCKET No. 30-70 9

)

(Show Cause)

(Vallecitos Nuclear Center -

~

L MAR 2 01981 >

General Electric Test Reactor P

cmes et the Secteh9

-ft l

Operating License No. TR-1)

Dockstirs a senice s

YY &

l INTERVENORS' REQUEST FOR PRODUCTION OF DOCUMENTS NRC STAFF Pursuant to 10 C.F.R.12.741, Congressmen D tilums, Burton and Burton (Inter-venors) hereby request that th'e NRC Staff make the following documents available for inspection and copying:

1.

R.R. Fullwood, et al, Probabilistic Safety Analysis, EPRI NP-424, Final

,i Report, April 1977.

2.

W.H. Hubble and ^.H. Miller, Licensee Event Report Analysis for Selected Safety System Vaives, EG&G Idaho, Inc.,

July 24, 1979, (Draft).

3.

J.P. Polaski and W.H. Sullivan, Licensee Event Report Analysis of Diesel Generators, EG&G Idaho, Inc., August 23, 1979 (Draft).

4.' M.A. Taylor, et al, An Assessment of Auxiliary Feedwater Systems presented at the 1979 Winter Meeting of the American Nuclear %ciety, November 11-15, 1979, TANSA0 331-966 (1979).

5.

" Analysis of Public Consequences from Postulated Severe Accident Sequence' in Underground Nuclear Power Plants," R.A. Armistead, et al, December 1977.

6.~ W.H. SULLIVAN and J.P. Poloski, Data Summaries of Licensee Event Reports of Pumps at U.S. Comercial Nuclear Plants. EG&G Idaho, Inc., NUREG/

CR-1205, January 1980.

7.

Telecon, Dr. A. Swain, Sandia Laboratories, from P.R. Davis. Intermountain Technologies, Inc., December 20, 1979.

" Final Hazards Summry Report - Humboldt Bay Power Plant - Unit 3",

b acific Gas & Electric Co.

. Davis, A Synopsis of WASH-1400 Reviews arid Their Implications,

%g2

[

R-4, Intermountain Technologies, Inc. Prepared for the Japanese 2-8/

Z %,%

gg/ A ic Energy Research Institute, March 1978.

\\

.. Malinauskar, Quarterly Progress Report on Fission Froduct Behavior p, atienal Laboratory (November 1979).

LWRs for the Period April-June 1979, ORNL/NUREG/TM-348, Oak Ridge

/

t

t. 1 0 3 2 0 0 5--

USA S p,.

m

, 11.

J. A. Gieseke, et al, " Fission Product Transport Analysis," Battelle Columbus Laboratories, presented at the Seventh Water Reactor Safety Research Information Meeting (November 5-9,1979).

12.

L.B. Buxton, " Molten Core / Water Contact Analysis for Fuel Melt Accidents," NUREG/CR-0391, February 1979.

13.

Personal Comunication, W. Frick, Southern California Edison, with P.R. Davis and D.C. Slaughterbeck, Intemountain Technologies, Inc.,

l March 27, 1980.

14.

Plan for Research to Imorove the Safety of Light Water Nuclear Powq Plants, NUREG-0438, US. Nuclear Regulatory Comission (April 1978).

15. TMI-2 Lessons Learned Task Force Final Report, NUREG-0585 U.S.

Nuclear Regulatory Commission (October 1979).

16. Seimic Safety Margins Research Program (Phase 1), Quarterly Proaress Report No. 5, NUREG/CR-1120, October 15, 1979.
17. Telecon, James Richardson SSMRP Program Manager, NRC, from P.R. Davis.

ITI, April 24, 1980.

18.

"NRC Systematic Evaluation Program - Seismic Review," H. A. Levin, NRC, presented at the Topical meeting on Thermal Reactor Safety, Knoxville, Tenn., April 1980.

l 19., " Prediction of Earthquake Frequencies at the Site of Nuclear Power Plants," P.H. Raabe General Atomic Company, published in American Nuclear Society Topical Meeting, Probabilistic Analysis of Nuclear Reactor Safety, May 1978.

20. Probabilistic Safety Analysis V EPRI NP-1275, prepared by Science Applications, Inc. December 1979.
21. "The Prediction of Accident Sequence Probabilities in a Nuclear Powa Plant Due to Earthquake Events," J.M. Hudson and J.D. Collins, J.H. -

Wiggins Company, presented at the Topical Meeting on Thermal Reactor Safety, Xnoxville, Tenn., April 1980.

22. "An Eva11ation of the Incremental Seismic Risk' Due to the Presence of Nuclear.^ower Plants," Yum Tong Lee Etc. UCLA, published in American Nuclear Society Topical Meeting, Probabilistic Analysis of Nuclear Reactor Safety, May 1978.
23. Hseih, T., ei al. On the Average Probability Distribution of Peak Ground Acceleration in the U.S. Continent Due to Strong Earthquakes, March 1975 UCLA-ENG-751.

f

24. kNewmark, N.M., " Probability of dredicted Seismic Damage in Relation

, to Nqclear Reactor Facility De ign " Draft, September 1975.

Sale Probabilistic~ Aspects of the seismic

25. : Pseigh, T., and Ohrent, D., GrENG-76113, December 1976.

' Risk :of Nuclear Reactors, UC s.

1

26.

"Coments on 'The Risks of Nuclear Power Reactors - A Review of the NRC Reactor Safety Study WASH-1400 (NUREG-75/014)' by the Union of Concerned Scientists," prepared by the USNRC and transmitted by 1

letter, Saul Levine, Director, Office of Nuclear Regulatory Research to H.W. Lewis, Chairman, Risk Assessment Review Group, May 23, 1978.

27.

" Seismic and Geologic Siting Criteria for Nuclear Power Plants,"

Appendix K, 20 CFR part 100, November 1971.

28.

Regulatory Guide 1.60, " Design Responso Spectra for Seismic Design of Nuclear Power Plsnts," December 1973 (Revision I).

29.

Regulatory Guide 1.122, " Development of Floor Design Repponse Spectra for Seismic Design of Floor-Supported Equipment or Components,"

January 1978 (Revision 1).

30.

Regulatory Guidt 1.61, " Damping Values for Seismic Design of Nuclear Power Plants, " C tober 1973.

31.

Regulatory Guide 1.29. " Seismic Design Classification," February 1976.

32.

Regulatory Guide 1.92, " Combining Modal Responses and Spatial Components in Seismic Response Analysis," February 1976 (Revision 1).

33.

Regulatory Guide 1.100, " Seismic Qualification of Electric Equipment for Nuclear Power Plants," March 1976.

34.

" Probability of Predicted Seismic Damage in Relation to Nuclear Reactor Facility Design," Consulting Engineering Services, September 1975.

35.

D.A. Dahlgren, et.al., Sandia Labs., " Molten LWR Core Material Inter-actions with Water and with Concrete," CONF-770708, presented at the Topical Meeting on Thermal Reactor Safety, Sun Valley, Idaho (July 31-August 4, 1977).

36.

D.A. Powers, et.al., Exploratory Study of Molten Core Material / Concrete l

Interactions, SAND 77-2042, Sandia Labs (February 1978).

37.

T.Y.-Chu, Radiant Heat Evaluation of' Concrete ~

A' Study of the Erosion of Concrete c.a to Surface Heating, SAND 77--922, Sandia Labs (January 1978: '

t

38. Neal S. Nelson, " Review of the PEA Position on WASH-1400 - The Reactor l

Safety Study-Health effects Estimates", presented before the Meeting l

l of the Risk Assessment Review Group (August 25,1977).

j

39. Light-Water-Reactor Safety Research Program: 'Ouarterly Progress Report, l

Jan.-March 1978, NUREG/CR-0201, Argonne National Laboratory (July 1978).

l 40 W.J. Christian, Underwriters Laboratories Inc., " Development and Ve fication of Fire Tests for Cable Systens.and System Components",

at the Sixth Water Reactor Safety Infonnation Meeting (November 1978).

- j 41 H. Alsmeyer, Et.al., A Model Describing the Interaction of a Core Me'lt '

' with Concrete NUREG/TR-0039 (September 1978).

R. Benz, et.al... Theoretical $ Studies on Va >or Explosions r 2nd Technical i

42.

' Report on Research Project BMFT-RS 76, NUREG/TR-0015, Stuttgart University !

tiovember 1977).

l I

~

t 5

~

.. 43.

E.W. Hagen, "Comon Mode /Comon Cause Failure: A Review," Nuclear _

Safety Volume 21-2-(S r-April 1980).

44.

A.D. Swain, et.al. Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications, NUREG/CR-1278, Sandia Laboratories, Draft Report (April 1980).

45.

NRC Statement on Risk Assessment and the Reactor Safety Study Report in Light of the Risk Assessment Review Group Ground Report, panuary 18, 1979.)

46.

Report to U.S. NRC by N.M.'lewmark and A.H.S. Ang: "A Probabilistic Seismic Safety Assessment of the Diablo Canyon Nuclear Power Plant," (November 1977).

47.

N.M.Newmark, report to the NRC:

"A Rationale for Development of Design Spectra for Diablo Canyon Reactor Facility," September 3, 1976).

48.

L. Wight, Lawrence Livermore Lab Corporations, " Seismic Risk Analysis for GE Nuclearcenter, Pleasanton, CA," (July 31,1978).

49. N.M.Newmark and C.A. Cornell, invited paper, American' Nuclear Society, Topical meeting on Probabilistic Reactor Safety, Newport Beach, CA:

"On the Seismic Reliability of Nuclear Power Plants."

50. All writings produced for the U.S. Atomic Energy Comission or the U.S.

Nuclear Regulatory Commission by Don L. Bernreuter, since his employment by the US AEC in 1973.

51.

Lee, W.H.K., Eaton,'M.S., and Brabb, E.E.,1971, Earthquake Sequence near Danville, CA,1920. Seismol. Soc. Am. Bull., v.61, no.6, p.1771-

' 1794,10 figs., 2 tables.

(Professional Qualifications of Brabb, p.4)

52. The last four documents cited on Brabb, Bibliography. (p.41 and che two documents cited.on.Brabb, BibliograAy.(p.5) in Uodated:t!RC' Staff Responses to Interrogatories of Friends yf the Earth (Hereinaf ter, Updated Responses).
53. The last four documents listed on Ellsworth, Bibliography (p.4) of Updated Responses.

54.a..The first, second, fifth, sixth, seventh, ninth, tenth and eleventh documents listed on Herd, Selected Publications, the page beginning with document Herd. D.G.,1974, The Las Positas fault: etc., of Updated Respor. es;

b. The fi.*st, second, third, fourth, sixth, ninth and ter.th documents liste< en Herd, Selected Publications, the page beginning with doc-ument Herd, D.G.,1978, Map of Quaternary faulting etc, of Updated Responses; c, All documents. listed on Herd, Selected Publications, the pefgu beginning with Lee, W.H.K., Herd. D.G., Bagnetti, V., etc., of Updated Responses; 55.a. All documents, except-the first one listed, listed on Morris, Bibliography, page 8 Updated Responses;
b. All documents listed on Morris, Bibliogrpphy, page 9, Updated Responses;
c. All documents, except the last one listed, listed on Morris, Bibliography, page 10, Updated Responses;
d. All do'cuments listed on Morris, Bibliography, page 11, Updated Responses,

~

W

... =...

~.

5

56. All reports prepared by D. Burtons 1emmons in connection with his "Consultr tion with. Atomic Energy Commission and U.S. Nuclear Regulatory Commission on 3 nuclear reactor sites in California and with various orge tations for 7 nuclear and fossil fuel power generator plants in Ars ims, Nevada, New York, Texas and Washington." (Page 2, Professional Qut. Jfications of D. Burton Slenmons, Updated Responses.)

57

.anmons, D.B.,1977, Faults and earthquake magnitude: State-of-the-art for assessing earthquake hazards in the United States:

U.S. Army Engineering Waterways Experiment Station, Vicksburg, Misc. Paper 8-73-1, Report 6, 1660.

58. Slemmons', D.B., and McKinney, R.,1977, Definitions of the term " active l

faul t": U.S. Army Engineer Waterways Experiment Station, Vicksburg, ME, Misc. Paper S-77-8, 17 p.

59. All papers, reports or other writings done by Lawrence H. Wight in con-nection with any federally licensed nuclear facility, the geology of California and seismic safety of buildings generally.

l 60.

Documents numbered 35, 57, 58, 67 - 72, 84, 85, 87, 90, 94, 97, 99, 101,103 - 107,110,113 - 116,119 and 120, which are listed an pages 4 through 11 of Publications by William J. Hall of Updated Responses.

61.a. The first, second, fifth, sixth, seventh, eighth, ninth, tenth, eleventh twelfth, thirteenth, and fourteenth documents listed on Page 5, Resume of William E. Vesely, Updated Responses.

b. The first, second, third, fourth, seventh and eighth documents listed

'on Page 6, Resume of Dr. William E. Vesely, Updated Responses.

l l

c. Any additional documents, reports or writings relating to the licensing or operation of any federal licensed nuclear facility or probabilistic methodology.
62. The bibliographies of Don L. Bernreuter, Kenneth W. Campbell, Robert E.

Jackson, Jr., Ph.D., Philip Stanley Justus, Raman Pichumani, _Ph.D.,

Leon Reiter, Larence H. Wight, Joseph A. Martore, Christian C. Nelson, George F. Lanik', John F. Bourdoin, and Millard L. Wohl

63. The titles, subject matter, names of publication and dates of publication of the " Twenty-nine abstracts for various publications and societies from 1955 - present" of D. Burton Slennons.

l

64. Martore, J.A., et.al., "Equipnent Response at the El Centro Steam Plant l

During the October 15, 1979 Imperial Valley Earthquake," NUREG/CR-1665.

l 65.

NUR 5/CR-0093.

66. All notes of ~ phone conversations between the NRC Staff and the Licensee or the Licensee's consultants between September 6,1979 and May 23, 1980.
67. All notes analyzing the probabilistics study undertaken by the Licensee.

...?

i 68~. a. A list of all reports by N.M. Newmark re nuclear reactor design and for NRC proceedings.

b.

Copies of the documents listed in 68.a.

69. Minutes of the meeting of the ACRS re the GETR which was held in November 1979.

Respectfully submitted,

'E.-

' l ML

. Lee Halterman, Counsel for Intervenors Reps. Dellums, Burton &. Burton 16 March 1981 Oakland, CA 94617 i

l e

k l

I l

l l

r e

e 4

'3

\\

1 s.

..r.

- -.