ML19347D208

From kanterella
Jump to navigation Jump to search
Forwards LER 81-018/03L-0
Date released: 12/27/2019 Download: ML19347D208


LER 81-018/03L-0:on 810208,train Flow Path B Isolated from Refueling Chemical Addition Tank to Refueling Water Storage Tank.Caused by Maint on Drain Valve Leakage Due to Red Rubber Tail Hose Lodged Behind Valve Seat.Hose Removed
ML19347D210
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/05/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19347D210 (2)
Forwards LER 81-018/03L-0
ML19347D207
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/05/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19347D207 (1)