QA Program Insp Rept 99900266/80-02 on 801208-11. Noncompliance Noted:Two Welders Welding W/O Valid Qualifications
ML19347D094
Person / Time
Issue date: 12/29/1980
From: Hunter V, Whitesell D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19347D092 List:
References
REF-QA-99900266 NUDOCS 8103110008
Download: ML19347D094 (6)


Text

.

O U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No.

99900266/80-02 Program No. 51300 Company:

Rockwell International Inc.

Energy Systems Group 8900 De Soto Street Canoga Park, CA 91304 Inspection Conducted:

December 8-11, 1980 Inspectors:

,////

4

/h/

V. If.' Huntag, Contractor Inspector Da)6 /

ComponentsfSection I, Vendor Intpection Branch k/

/ 3' E

Approved by:

/

/7.~EMhitese

, Chief D&ty '

/CompenentsS,ctionI, Vendor Inspe tion Branch Summary e

Inspection on December 8-11, 1980 (99900266/80-02)

Areas Inspected:

Implementation of Appendix B, to 10 CFR 50 and applicable codes and standards, including training,. audits, manufacturing processes and Authorized Nuclear Inspection interface. The inspection involved twenty-eight (28) inspector hours on site.

Resul ts":

In the four (4) areas inspected, there were no apparent deviations in three (3) areas. The following deviation was identified in the remaining area:

Deviation: Contrary to Criterion V of Appendix B to 10 CFR 50 and the ASME accepted QA Manual, two (2) welders were performing welding operations with-out valid weld qualifications.

810333ngg

DETAILS SECTION A.

Principal Persons Contacted R. J. McDermott, Director, Quality Assurance G. Hallinan, Direcotr, Steam Generator Program C. C. Conners, Manager, Design Engineering W. H. Knight, Manager, QA Inspection ar.d Test F. A. Hunter, Manager, General Fabrication D. N. Glass, Manager, QA Audits and Controls R. J. Gallagher, Welding Engineer R. L. Jaseph, Quality Assurance Auditor All of the aobve persens attended the exit meeting.

B.

Vendor Activities - General The Energy Systems Group (ESG) is a division of the Rockwell International Inc. The primary product of ESG is hydrogen recombiners that remove the excess hydrogen and oxygen from containment structures of both boiling water and pressurized water cooled reactors.

ESG is a major suoplier of recombiners to the nuclear industry and consti-tutas approximately 65% of their current shop loading.

The ASG facility at Canoga Park, CA, holds ASME certificaticns N-2153 (N-Symbri) for construction of Section III, Divisicn I items and N-2154-1 (NA-Symbol) for Class 1, 2, and 3 and MC Ccmponent parts and appurtenances and component supports; Class 1, 2, and 3 piping subassemblies and Class CS Core support structures parts. These certificates axpire on June 16, 1981.

The ESG facility is canprised of approximately 540,000 square feet and staffed with 2,225 perscnnel. Other products and/or services provided to the nuclear industry'by ESG are:

1.

Inservice inspection systems for ASME Section XI preservice and inservice inspection of nuclear power plants.

2. -Remote handling equipment.

3.

Reactor pressure vessel materials surveillance services.

4.

Decontamination and deccmmissioning of nuclear facilities.

5. ' Equipment monitoring systems.

6.

Nuclear training program that includes specialized training for nuclear industry managers, engineers, technicians, and operators.

a

. C.

Training 1.

Insoection Objectives The objectives of this inspection were; a.

To ascertain that programs are established for indoctrination and training of personnel performing activities affecting quality.

b.

To ascertain that indoctrination and training measures are effective-ly implemented.

2.

Method of Accomplishment The preceding objectives were accomplished by review of the following documentation:

a.

N6.02 of the ASME accepted QA Manual.

b.

TI-001-10-002 titled, " Monthly Welding Procedure and Personnel Roster."

~

c.

TI-001-100-005 titled, " Stamp and Certification Roster."

d.

QAI N6.02A titled, " Qualification and Certification of NDE Personnel."

e.

QAOP N6-01 titled, " Qualification of Welding Procedures and Personnel."

3.

Inspection Findings a.

Deviation - See Notice of Deviation b.

Unresolved Items - None were identified.

l 0.

Audit Control 1.

Objectives l

.The objectives of this area of the inspection were to verify that programs were established for indoctrination and/or training of personnel performing activities affecting quality and that indoctrination and training measures were effectively implemented, i

2.

Method of Accomolishment:

i The preceding objectives were accomplished by:

a.

Review of Section 14.0 of the ASME accepted QA Manual to verify that:

(1)

Procedures and policy documents identify organizations responsible for audits and define their responsibilities and authorities.

. (.2). Measures have been established to assure that auditors are independent of any direct responsibility for perfomance of activities which they are auditing.

b.

Review of Procedure SPP-203 and perronnel qualifications to veri' that:

(1) Audit personnel are trained and qualified.

(2) Provisions exist for reporting on the effectiveness of QA Program to responsible management.

(3) Provisions have been made for re-audit of deficient areas.

(4) Audits are scheduled and perfomed in accordance with approved check list.

c.

Review of audit records. to verify that:

(1) Audits are perfomed in accordance with approved procedures and instructions by qualified personnel.

(2) Corrective actions are taken for deficiencies identified by audits.

3.

Insoection Results

-There were no deviations or unresolved items identified.

E.

Manufacturing Process Control 1.

Objectives, The objectives of this area of the inspection were to verify that the vendor's manufacturing processes were:

a.

Performed under a control system which meets the NRC rules and regulations, ASME Code requirements, the vendor's comitments in his ASME accepted Quality Assurance Program, and contract require-ments.

b.

Effective in assuring product quality.

2.

Method of Accomolishment The objectives of this area of the inspection were accomolished by:

a i

. 2 a.

Review of the ASME accepted Quality Assurance Manual, Section 9, revision 4, titled, " Control of Construction Process" to verify that procedures had been established which prescribes a control system of the manufacturing processes.

b.

Review of the projects inspection plan to verify that control check lists, are prepared which identifies the document numbers and revisions to which the process must conform. Also to verify that all processes and tests are to be performed by qualified personnel using qualified procedures.

c.

Review of the shop traveler, or process control check lists, to verify that spaces are provided for reporting the results of specific operations, or reference to other documents where the results are maintained. Also that it includes space for the signoff by the vendor, indicating the date on which the operation or tests was performed, and space for signoff and date, by the authorized nuclear inspector, to document his acceptance of activities that he has selected as mandatory hold points.

d. - Observed the following processes:

(1) Liquid penetrant test of mechanical top assembly welds 3, 4, and 11 in accordance with procedure No. N070 NDT-03, revision 0.

-(2) Radiographic set up per procedure N010 NDT-02 and technique sheet N1-0069-S.

(3)

In process welding of reactor chamber and coil assembly, welds 5-18-19 and 20, Part No. N139000224-901 in accordance with weld procedure WP-001-140-173.

to verify their compliance with the above referenced procedures, and the overall QA program documentation requirements, including the establishment of mandatory hold points by the authorized nuclear inspector.

e.

Interviews with personnel to verify they are knowledgeable in the procedures applicable to manufacturing process control.

3.

Findings 4

a.

The inspector verified that the vendor's manufacturing processes are performed under a controlled system which is consistent with the NRC rules and regulations, the Code requirements, the Quality Assurance Program commitments, and that the system is effective in achieving tne specified ' product quality.

. b.

Within this area of the inspection, no deviations or unresolved items were identified.

F.

Exit Interview The inspector met with management representatives (denoted in paragraph A) at the conclusion of the inspection on December 11, 1980. The manage-ment representatives acknowledged the statements by the inspector that no deviations or unresolved items were identified during this inspection.