ML19347D082
| ML19347D082 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 02/13/1981 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Draper E GULF STATES UTILITIES CO. |
| References | |
| NUDOCS 8103100728 | |
| Download: ML19347D082 (1) | |
Text
710
- "7'%
UNITED STATES
- +
i' NUCt. EAR REGULATORY COMMISSION k-b[
REGION IV S
611 RYAN PLAZA DRIVE, SUITE 1000 ARLINGTON. TEXAS 76011 February 13, 1981 In Reply Refer To:
RIV Docket flos. 50-458/IE Bulletin No. 80-17, Supplement 5 50-459/IE Bulletin No. 80-17, Supplement 5 f@' 'A b
fb
[-9 80 Gulf States Utilities
[.
fg8/A Attn:
Dr. E. Linn Draper, Jr.
Vice President-Technology O
P., O. Box 2951 Beaumont, Texas 77704
+
s n
Gentlemen:
Enclosed is IE Bulletin No. 80-17, Supplement 5, which is transmitted for information with regard to your nuclear power facilities.
Should you have any questions regarding this bulletin supplement, please contact this office.
Sincerely, l;j@'].l,
-s
. j' Karl V. Seyfrit i Director
Enclosures:
1.
IE Bulletin No. 80-17, Supplement-5
'2.
List of Recently Issued
-IE Bulletins 01031oo pfr
.Q
SSINS No.:
6820 Accession No.:
801104259 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 IE Bulletin No. 80-17, Supplement 5 February 13, 1981 Page 1 of 1 FAILURE OF CONTROL R005 TO INSERT DURING A SCRAM AT A BWR Description of Circumstances:
On July 3, 1980, the NRC issued IE Bulletin No. 80-17, that required actions to be taken by licensees of all operating GE BWRs.
Among the actions required, Item 6(a) required a prompt notification report by telephone to the appropriate Regional Office followed by a telecopy or other written submittal.
These reports were required in the event that any of the systems (HPCI, RCIC, SLCS, RPT, RHR/ pool cooling, and main steam bypass) were found to be less than fully operable.
These reports have served the purpose of notifying NRC of cases of potential reduction in operability of systems important to the mitigation of consequences of an anticipated transient without scram (ATWS) event.
These reports are no longer necessary since improvements have been accomplished to increase the reliability of control rod scram.
Actions No longer Necessary by Licensees:
Further reporting is not required in response to Item 6(a) of IE Bulletin No. 80-17.
This does not change the reporting requirements set forth in your license Technical Specifications.
No written response to IE Bulletin 80-17, Supplement 5, is required.
If you have any questions regarding this matter, please contact the appropriate NRC Regional Office.
IE Bulletin No. 81-17, Supp. 5 February 13, 1981 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.
Sup. 3 Environmental Qualifica-10/24/80 All power reactor to 79-01B tion of Class IE facilities with an Equipment Operating License (0L) or Construction Permit (CP) 80-21 Valve Yokes Supplied by 11/6/80 All light watar Malcolm Foundry Company, Inc.
reactor facilities holding Operating Licenses (OLs) or Construction Permits (cps) 80-22 Automation Industries, 9/11/80 All radiography licensees Model 200-520-008 Sealed-Source Connectors 80-23 Failures of Solenoid 11/14/80 All power reactor facil' ties Valves Manufactured by with Operating License (bt)
Valcor Engineering or Construction Permit (CP)
Corporation 80-24 Prevention of Damage 11/21/80 All power reactor facilities Oue to Water Leakage with Operating License (OL)
Inside Containment or Construction Permit (CP)
(October 17, 1980 Indian Point 2 Event)
Sup. 4 Failure of Control Rods-12/18/80 To specified BWRs with Bulletin to Insert During A Scram an Operating License (0L) 80 at a BWR and All BWRs with a Construction Permit (CP) 80-25
' Operating Problems with-12/19/80 All BWR facilities with Target Rock Safety-Relief Operating License (OL)
Valves at BWRs and specified near term Operating License (0L)
BWR facilities and all BWRs with-a Construction Permit (CP) 81-01 Surveillance of 1/27/81 All power reactor Mechanical Snubbers facilities with an Operating License (0L) and to specified facilities with Construction Permit (CP)
Enclosure