Text
<?
'o
UNITED STATES
[
7,
g
NUCLEAR REGULATORY COMMISSION
*-
- y
t
REGION 111
[
799 ROOSEVELT ROAD
o
,
%
e
GLEN ELLYN. ILLINol5 60137
- '
NOV 031980
Docket No. 50-373
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special inspection conducted by Messrs. R. L. Spessard,
I. N. Jackiw and R. D. Walker of this office and Messrs. A. Bournia and
G. W. Rivenbark of the Office of Nuclear Reactor Regulation on September 8
through September 11, 1980 of activities at the LaSalle County Nuclear
Station, Unit 1, authorized by NRC Construction Permit No. CPPR-99 and to
the discussion of our findings with Mr. R. H. Holyoak at the conclusion of
the inspection.
This inspection involved an evaluation of the LaSalle County Station
organization and management capabil.ities in accordance with NUREG-0694,
"TMI - Related Requirements for New-Operating Licenses." The enclosed
copy of our inspection report identifies areas examined during the in-
spection which consisted of a selective examination of procedares and
representative records, observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection; however, numerous areas in which your
i
staffing and management controls need to be finalized and/or upgraded
to meet current NRC requirements and guidelines are discussed in the
attached report, and these areas will be reexamined prior to issuance
,
of an Operating License,
t
I
Additionally, two items of safety concern were identified during the
t
inspection, and these items will receive further review by the NRC prior
to the issuance of an Operating License. One item relates to the com-
position of the shift crews, where the members of the crew are not a
permanent group, and the other relates to the boundary of the control
room, where the Shift Supervisor's office which does not have visible
l
access to the control room is considered as part of the control room.
!
These items are discussed in sections 7 and 10 of this enclosed report.
I
l
0qQ
3
l
.
.
-
.
.
-
.
Commonwealth Edison Company
-2-
NOV 031560
.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as'follows.
If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure.
The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an enclosure
to the application.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
N
-
James G. Keppler
Director
Enclosure:
IE Inspection
Report No. 50-373/o0-41
cc w/ encl:
Mr. J. S. Abel, Director
of Nuclear Licensing
Mr. L. J. Burke, Site
Construction fuperintendent
Mr. T. E. Quaka, Quality
Assurance Supervisor
Mr. R. H. Holyoak, Station
Superintendent
Mr. B. B. Stephenson
Project Manager
Central Files
Reproduction Unit NRC 20b
I
!
Resident Inspector, RIII
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
1
i