Forwards IE Insp Rept 50-373/80-41 on 800908-11.No Noncompliance Noted
ML19347C614
Person / Time
Site: LaSalle 
Issue date: 11/03/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19347C615 List:
References
NUDOCS 8012310464
Download: ML19347C614 (2)


See also: IR 05000373/1980041

Text

<?

'o

UNITED STATES

[

7,

g

NUCLEAR REGULATORY COMMISSION

*-

y

t

REGION 111

[

799 ROOSEVELT ROAD

o

,

%

e

GLEN ELLYN. ILLINol5 60137

        • '

NOV 031980

Docket No. 50-373

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special inspection conducted by Messrs. R. L. Spessard,

I. N. Jackiw and R. D. Walker of this office and Messrs. A. Bournia and

G. W. Rivenbark of the Office of Nuclear Reactor Regulation on September 8

through September 11, 1980 of activities at the LaSalle County Nuclear

Station, Unit 1, authorized by NRC Construction Permit No. CPPR-99 and to

the discussion of our findings with Mr. R. H. Holyoak at the conclusion of

the inspection.

This inspection involved an evaluation of the LaSalle County Station

organization and management capabil.ities in accordance with NUREG-0694,

"TMI - Related Requirements for New-Operating Licenses." The enclosed

copy of our inspection report identifies areas examined during the in-

spection which consisted of a selective examination of procedares and

representative records, observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection; however, numerous areas in which your

i

staffing and management controls need to be finalized and/or upgraded

to meet current NRC requirements and guidelines are discussed in the

attached report, and these areas will be reexamined prior to issuance

,

of an Operating License,

t

I

Additionally, two items of safety concern were identified during the

t

inspection, and these items will receive further review by the NRC prior

to the issuance of an Operating License. One item relates to the com-

position of the shift crews, where the members of the crew are not a

permanent group, and the other relates to the boundary of the control

room, where the Shift Supervisor's office which does not have visible

l

access to the control room is considered as part of the control room.

!

These items are discussed in sections 7 and 10 of this enclosed report.

I

l

0qQ

3

l

.

.

-

.

.

-

.

Commonwealth Edison Company

-2-

NOV 031560

.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as'follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure.

The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an enclosure

to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

N

-

James G. Keppler

Director

Enclosure:

IE Inspection

Report No. 50-373/o0-41

cc w/ encl:

Mr. J. S. Abel, Director

of Nuclear Licensing

Mr. L. J. Burke, Site

Construction fuperintendent

Mr. T. E. Quaka, Quality

Assurance Supervisor

Mr. R. H. Holyoak, Station

Superintendent

Mr. B. B. Stephenson

Project Manager

Central Files

Reproduction Unit NRC 20b

I

AEOD

!

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

1

i