Forwards IE Insp Rept 50-029/76-09 on 760323-26. No Noncompliance Noted
ML19347C465
Person / Time
Site: Yankee Rowe
Issue date: 04/07/1976
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML19347C466 List:
References
NUDOCS 8011190514
Download: ML19347C465 (1)


See also: IR 05000029/1976009

Text

r

a

C

.-

l

_[

' " >

/

,

,

,

,

'

UNITED STATES

,

,

.

NUCLEAR REGULATORY COMMISSION

.

REGloN 1

.

431 PAftK AVENUE

,

,

_

KING oF PetuSSIA PENNSYL.VANI A 19404

APR 7

1976

.

Tankee Atomic Electric Company

License No. DPR-3

Attention: Mr. Robert H. Groce

Inspection No. 76-09

Licensing Engineer

Docket No. 50-29

20 Turnpike Road

Westborough, Massachusetts 01581

Gentlemen:

This refers to the inspection conducted by Mr. W. Lazarus of this office

on March 23-26, 1976 at Yankee Rowe Nuclear Power Station, Rowe, Massachusetts,

of activities authorized by NRC License No. DPR-3 and to the discussions

of'our findings held by Mr. Lazarus with Mr. H. Autio of your staff at

the conclusion of the inspection.

.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which la enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or ycur contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such infor=ation

from public disclosure. An'y such application must include a full state =ent

.

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary infortation

identifLed in the application is con'tained in a separate part of the

document. If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

.

.

.

'

gu

e

8 e

e e-

g

i e =a

5

2

r

J

-

-

.

.

wE.#

8011190 Q

- --

'

.

.

..

.

.

.

.

2--

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

0

J.)O

_

_ J

unner, Chief

o

Re

or Operations and Nuclear

Su port Branch

Enclosure:

IE Inspection Report No. 50-29/76-09

cc:

H. Autio, Plant Superintendent

Donald G. Allen, President

. . . . . - -

.

.-.

-

..n.

. . . .

bec:

IE Mail & Files (For Appropriate Distribution)

PDR

Local PDR

NSIC*

TIC

REG:I Reading Roon

Region Directors (II, III, IV) (Report Only)

State of Massachusetts

,

,

t

i

e

!

,

l

'

. .

__ .

I

I

l

I

l

.

. . . . . _ ,

. . . _ . . . . . . .

. .