ML19347C459

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-029/76-01 on 760105-08. No Noncompliance Noted
ML19347C459
Person / Time
Site: Yankee Rowe
Issue date: 02/10/1976
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML19347C460 List:
References
NUDOCS 8011190492
Download: ML19347C459 (2)


See also: IR 05000029/1976001

Text

'

.

-

.,

/,

'

,

Uf41TED STATES

' %MM - p

'

'

NUCLEAR REGULATORY COMMISSION

/ ' W"I b

.

REGlord I

.

634 PARK AVENUE

KING oF PRUSSI A. PENM5Yt.V ANI A 19406

.

FE3 10137s

Yankee Atomic Electric Company

License No. DPR-3

Attention:

Mr. Robert H. Groce

Inspection No. 76-01

Licensing Engineer

Docket No. 50-29

20 Turnpike Road

Uestborough, Messachusetts

015R1

.

Gentlemen:

,

.This refers to the inspection conducted by Mr. R. Paolino of this office

on January 5-3, 1976 at Rowe, Massachusetts of activities authorized by

NRC License No. DPR-3 and to the discussions of our findings held by

Mr. Paolino with Mr. d. Autio of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

-

letter. Within these arcas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no ite=s of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

7.f this report contains any infor=ation that you

(or your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

l

such information from public disclosure. Any such application must

!

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contnined

in a separate part of the document.

If we do not hear from you in this

.

regard- within the specified period, the report will be placed in the

I

Public Document Room.

!

l

t

i

1

i

!

$otuTroy%

. ..

..

'

m

.

$O!Yh

Wsf

4

-

0 3,3 90 /$

l

.

t

'

,

.

.

.

2

.

.

.

No reply to this letter is required; however, should you have any

questions concerning this inspection, we vill' be pleased to discuss

them with you.

Sincerely,

- - - =~

n

,

-

p Robert T. Carls M Chief

Reactor Construction and Engineering

i

Support Bran:h

Enclosure:

IE:I Inspection Report No. 50-29/76-01

cc:

H. Autio, Plant Superintendent

Donald G. Allen, President

bec:

IE Mail & Files (For Appropriate Distribution)

PDR

Local PDR

NSIC

TIC

'

REG:I Reading Room

Region Directors (II, III, IV) (Report Only)

State of Massachusetts

'

i

!

.

I

.

l

_

. . .

- .

I

l

6

,

. . . - . . . , . . . . , -

,,

..74

. wy

w

..%r

. , , _ , .

.

-

-

,