Text
!
e
o rar
s
m'g
UNITED STATES
o8
t
NUCLEAR REGULATORY COMMISSION
'
y
ae
REGION 11
p'['
'
101 MARIETTA sT., N.W., sulTE 3100
g
ATLANTA, GEORGIA 3o303
AUG 2 519C-
In Reply Refer To:
VLB %
50-321/80-33
_0-3ff/8_0-33
50-424/80-11
50-425/80-11
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by V. L. Brownlee of this office on
July 30 and 31, and August 4,1980 of activities authorized by NRC Operating
License No. DPR-57, License No. NPF-5, and Construction Permit Nos. CPPR-108 and
CPPR-109 for the E. I. Hatch and A. T. Vogtle facilities, and to the discussion
of our findings held with Messrs. T. V. Greene on July 31, 1980 and C. W. Hayes
on August 4,1980 at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
1
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
/
/
._ _s 2fyq7g
.~ .
.- .
--
.
. . _.
--- ______
.
.
Georgia Power Company
-2-
4(JCp3
,
)
Should you have any questions concerning this letter, we will be glad to discuss
'
them with you.
Sincerely,
i
-
C. E . Mu rp
Chie
,
Reactor Construction and Engineering
i
Support Branch
i
!
Enclosure:
Inspection Report Nos. 50-321/80-33,
50-366/80-33, 50-424/80-11, and 50-425/80-11
cc w/ enc 1:
M. Manry, Plant Manager
,
C. E. Belflower, Site QA Supervisor
<
W. A. Widner, Vice Prcsident and
General Manager-Nuclear Generation
-
K. M. Gillespie, Construction
f
Project Manager
E. D. Groover, QA Site Supervisor
- i
D. E. Dutton, Project General Manager