Forwards IE Insp Repts 50-321/80-33,50-366/80-33, 50-424/80-11 & 50-425/80-11 on 800730-31 & 0804.No Noncompliance Noted
ML19347C304
Person / Time
Site: Hatch, Vogtle  Southern Nuclear icon.png
Issue date: 08/25/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19347C305 List:
References
NUDOCS 8010170271
Download: ML19347C304 (2)


See also: IR 05000321/1980033

Text

!

e

o rar

s

m'g

UNITED STATES

o8

t

NUCLEAR REGULATORY COMMISSION

'

y

ae

REGION 11

p'['

'

101 MARIETTA sT., N.W., sulTE 3100

g

ATLANTA, GEORGIA 3o303

AUG 2 519C-

In Reply Refer To:

VLB %

50-321/80-33

_0-3ff/8_0-33

50-424/80-11

50-425/80-11

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by V. L. Brownlee of this office on

July 30 and 31, and August 4,1980 of activities authorized by NRC Operating

License No. DPR-57, License No. NPF-5, and Construction Permit Nos. CPPR-108 and

CPPR-109 for the E. I. Hatch and A. T. Vogtle facilities, and to the discussion

of our findings held with Messrs. T. V. Greene on July 31, 1980 and C. W. Hayes

on August 4,1980 at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

1

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

/

/

._ _s 2fyq7g

.~ .

.- .

--

.

. . _.

--- ______

.

.

Georgia Power Company

-2-

4(JCp3

,

)

Should you have any questions concerning this letter, we will be glad to discuss

'

them with you.

Sincerely,

i

-

C. E . Mu rp

Chie

,

Reactor Construction and Engineering

i

Support Branch

i

!

Enclosure:

Inspection Report Nos. 50-321/80-33,

50-366/80-33, 50-424/80-11, and 50-425/80-11

cc w/ enc 1:

M. Manry, Plant Manager

,

C. E. Belflower, Site QA Supervisor

<

W. A. Widner, Vice Prcsident and

General Manager-Nuclear Generation

-

K. M. Gillespie, Construction

f

Project Manager

E. D. Groover, QA Site Supervisor

i

D. E. Dutton, Project General Manager