ML19347C278

From kanterella
Jump to navigation Jump to search
Ack Receipt of 800919 Interim Deficiency Rept Re High Energy Line Break Analysis Restraint Design.Final Rept Will Be Reviewed Pending Receipt
ML19347C278
Person / Time
Site: Midland
Issue date: 09/30/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8010170195
Download: ML19347C278 (1)


Text

__

~

4 h

p as4 UNITED STATES

,[

9 NUCLEAR REGULATORY COMMISSION g

S REGION W f

2 799 ROO5cVELT ROAD i

g otru ettvu, attisOss sois7 SEP. 3 01nd i

Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:

Mr. James W. Cook 3

Vice President j

Midland Project l

1945 West Parnall Road j

Jackson, MI 49201 Gentlemen:

1 1

Thank you for your interim r2 port dated September 19, 1980, pursuant to 10 CFR 50.55(e) regarding HELBA Restraint Design. We will review your final report on this matter upon receipt.

Your cooperation with us is appreciated.

Sincerely,

[M[emc b

'G.

Fiorelli, Chief

/

Reactor Construction and Engineering Support Branch 3

j cc: Director, RCI/IE Directcc, AEOD Chief, OEB/MPA I

IE Files cc w/ltr dtd 9/19/80:

Central Files PDR Local PDR NSIC Tic Ronald Callen, Michigan Public Service Commission Myron M. Cherry, Chicago

' 801016 0/ff s

4 4

l,

(

CORSumBIS

POVlBf James W Cook Company

~ ~,a

. ~ w ~,~,

b

~

l l

General Of feces: 1945 West Parnell Road, Jack son, Michigan 49201 *(517) 788 0640 i

September 19, 1980 Mr J G Keppler, Regional Director j

Office of Inspection & Enforcement US Iiuclear Regulatory Co==ission l

Region III j

799 Roosevelt Road a

Glen Ellyn, IL 60137 1'IDLAI;D IiUCLEAR PLtd!T l

U';IT !!O 1, DOCKET I 0 50-329 I

UIIIT NO 2, DOCKrr I;0 50-330

)

l HELBA RESTRAII;T DESIG:

FILE:

0.L.9.L1 UFI:

73*10*01 SERIAL:

8830 i

l l

This letter confirms the 50.55(e) item concerning HELEA Restraint Design, i

reported by telephone call to R Knop, US:!RC Region III, Glen Ellyn, IL, on August 21, 1980.

The attachments to this letter describe the ecnditions and actions taken j

concerning this item.

l Another report, either interin or final, vill be sent on or before December 1, 1960.

1 1

i WRB/1r l

I l

Attachment:

1) Management Corrective Action Report (MCAR-1), Report tio h0, l

dated August 21, 1980 l

l l

2) MCAR h0, Interim Report 1, High Energy Line Break Analysis i

(HELEA), Pipe Whip Restraint Designs, dated September 11, 1980 l

CC: Director of Office of Inspection & Enforcement l

DUPLICATE DOCUMENT 1)

Entire document previously entered into system under:

Nk(c ANO N o. of pages:

b g 34 g'