ML19347C236

From kanterella
Jump to navigation Jump to search
Schedule & Outline for Discussion at 243rd ACRS Meeting on 800710-12 in Washington,Dc
ML19347C236
Person / Time
Issue date: 07/02/1980
From:
Advisory Committee on Reactor Safeguards
To:
Advisory Committee on Reactor Safeguards
References
ACRS-MS-0600, ACRS-MS-600, NUDOCS 8010170074
Download: ML19347C236 (4)


Text

Cm 405.eroq%g 3'

'[

4085-UNITEC dTATES

[

'"pg[g NUCLEAR REGULATORY COMMISSION

i. b >'

s 9 :

ADVISORY COMMITTEE ON REACTOR SAFEGUARDS

/

wassiscion. o. c.2osss

%gE o.,

July 2,1980 SCHEDULE AND OUTLINE FOR DISCUSSION l

243RD ACRS MEETING JULY 10-12,1980

)

WASHINGTON, DC

}

~.a sday, July 10,1980, Room 1046,1717 H Street, NW, Washington, DC r

e s

1) 3:30 A.M. - 9:15 A.M.

OpeningSession(0 pen) 1.1) First " Tommy" Thompson Award i

presented to Dr. David Okrent 1.2) Proposed Items for meeting with NRC Commissioners l.2-1) Responsibility of state /

local governments re.

Emergency Planning 1.2-2) Standardization of Nu-clear Plants (NUREG-0642) 1.2-3) Role / responsibility of NRC Resident Inspectors i

2) 9:15 A.M. - 12:30 P.M.

ACRS Report to NRC on FY 1982 Safety Research Budget (0 pen) 2.1) Discuss proposed ACRS Report to NRC (CPS /TGM/DZ) 12:30 P.M. - 1:30 P.M.

LUNCH 3) 1:30 P.M. - 4:30 P.M.

ACRS Reports to NRC on FY 1982 Safety Research Budget (0 pen) 3.1) Discuss proposed ACRS report to NRC (CPS /TGM/DZ)

(Portions of sessions 2) and 3) above will be closed as nr. essary to protect Proprietary Information.)

8 019,gg 9

r u.

l Schedule July 1,1980 4) 4:30 P.M. - 6:30 P.M.

Recent Operating Experience (0 pen) 4.1) 4:30-5:00:

Hatch / Brunswick Nuclear Plants - potential loss of SDIV discharge volume i

4.2) 5:00-5:30: Browns Ferry Nu-clear Plant Unit 3 - 6/7/80

=j 4

failure of control rods to fully scram 4.3) 5:30-6:00:

St. Lucie Unit 1 -

response of primary coolant system to cooldown on natural circulation i

4.4) 6:00-6:30: TMI Venting of containment to release Kr-85 1

5) 6:30 P.M. - 7:30 P.M.

Proposed ACRS reolies to incuiries from NRC Chairman and Commissioner Gilinsky re: (0 pen) f 5.1) Delayed primary coolant pump j

trip during SBLOCAs and cri-teria for HPI termination (memo / letter from Chrmn John F. Ahearne dated 2/22/80 and 4/1/80) (MSP/ALB) 5.2) Use of in-core themocouples (letter from Comm. Victor Gilinsky dated 6/4/80) (00/PB)

Friday, Ju'y 11, '.980, Room 1046,1717 H Street, NW, Washington, DC 6) 8:30 A.M. - 12:30 P.M.

Sequoyah Nuclear Power Plant Unit 1 (0 pen) 6.1) 8:30-9:00: Report of ACRS Subcommittee (JCM/RS) 6.2) 9:00-12:30: Discussion with NRC Staff and applicant (Portions of this session will be closed as required to discuss Pro-prietary Information relating to this matter.)

4.+

Schedule July 1,1980 12:30 P.M. - 1:30 P.M.

LUNCH 7) 1:30 P.M. - 2:30 P.M.

Meeting with Chairman J. F. Ahearne and other NRC Commissioners (0 pen) 8)

2:30 P.M. - 7:00 P.M.

Proposed ACRS Recorts to NRC (0 pen) 8.1) 2:30-4:30:

Discuss proposed ACRS Report on FY 1982 Safety Research Budget (CPS /et al.)

8.2) 4:30-5:30:

Discuss proposed ACRS comments re. proposed NP.C rule on fire protection (MB/PST) 8.3) 5:30-6:30:

Discuss proposed ACRS letter on " cascade" fail-ures.i nuclear power p ants 4

(JCE/GRQ) 8.4) 6:30-7:00: Discuss proposed response to request from G. G. Sherwood, GE for clari-fication of ACRS report dated 4/16/80 on ATWS (WK/PAB)

Saturday, July 12,1980, Room 1046,1717 H Street, NW, Washington, DC 9) 8:30 A.M. - 4:00 P.M.

Concluding Session (0 pen) 9.1) 8:30-10:30:

Proposed ACRS Re-port on FY 1982 Safety Research Budget (CPS, et al.)

9.2) 10:30-11:30:

Complete proposed ACRS reports to NRC on the Sequoyah Nuclear Power Plant Unit 1 9.3) 11:30-12:15: Discuss proposed candidates for ACRS membership (DWM/MCG) and activities of ACRS merhers (WK/RFF)

O b tions of this session will be closed as necessary to protect in-formation the release of which would represent an unwarranted invasion of personal privacy.)

J

J Schedule July 1, 1980 12:15-1:15 P.M. - LUNCH 9.4) l_:15-2:00:

Complete proposed ACRd reports / comments on:

9.4-1) Cse of in-core thermo-coupl es 9.4-2) Delayed pump trip and tennination of HPI 9.4-3) NRC Rule on fire protec-tion 9.4-4)

" Cascade" failures in nuclear plants 9.5) 2:00-3:15: Reports of ACRS Sub-committees on:

9.5-1) 2:00-2:45:

Class 9 Ac-cidents (WK/GRQ) 9.5-2) 2:45-3:15: Quantita-tive Risk Criteria (D0/GRQ) 9.6)3:15-4:00: Future Schedule Items 9.6-1) Anticipated full Comm.ttee Activity (MP/RFF) 9.6-2) Anticipated Subcommittee Activity (MWL/et al)

>