Text
. _ _ _.
e j
.s j
j Energy Technology Engineermg Center Energy Systems Group
(
P o. Box 1449 l
Canoga Park.CA 91304 (213)34
Rockwell Operated for U S. Department of Energy InteinatiOnal j
i October 6,1980 SOETEC-DRF-4263 f
l 4
Mr. R. J. Bosnak, Chief j
Mechanical Engineering Branch j
Division of Engineering U. S. Nuclear Regulatory Commission Washington, D. C.
20555 j
Subject:
LWR Licensing Support - MEB Case Reviews (III):
Identification i
of Tasks Required to Complete Case Reviews Assigned to ETEC.
j
Dear Mr. Bosnak:
I Enclosed for record purposes is a table which identifies the tasks required j
to complete the subject reviews.
These tasks were identified in an ETEC/NRC meeting at ETEC on September 26, 1980.
4 Attendees at the meeting were:
A. J. Cappucci Jr.
NRC l
L. J. Auge ETEC (Part Time) l W. P. Chen ETEC J. M. Brammer ETEC (Part Time)
H. R. Fleck ETEC (Part Time)
]
J. R. Prevost ETEC (Part Time)
Relative to the confirmatory analyses NRC was informed that:
- 1) A SAP 1 post processor to investigate Code compliance with the requirements of the ASME B&PVC for various piping prod-ucts is being implemented.
- 2) Code compliance procedures involving dynamic seismic analyses is under investigation.
- 3) NRC guidance for loads associated with LOCA loads is required.
ETEC plans to issue an interim confirmatory analysis for the Bellefonte 1 & 2
{
plant and will address the above 3 items before completion of the confirmatory analyses for all 5 currently assigned plants.
j Sincerely yours,
~
Ad __ -
J. O. Bates, Program Manager g
Energy Programs Office c
l 8010160532 Energy Technology Engineering Center Enclosure As Noted
~:
H. L. Bram er, MRC -
A. J. Caroxci, PIRL' 1
- 1
e i
T ASKS TO F.E I EM ORME D By LILC 10 t (r:Pt i ll fM f1t B Gsl F[ VIEW 5 111
- t Afai TASK r!ORlTf P1 AtaT PRIOR!TY IASK PIMAKAs SIAIUS 1
Ran Onofre 2&3 1
Confirnatory Analysis lit C will identity additional data required to n.mplete this task.
l 2
SER Open items:
- Seismic Margin Problem A conference call and a riceting with the appli-u nt are to be st.heduled by f4RC.
- Load Combinations keview (u ments on Anendw nt 19 of the F5AR aie 4
to be sut,mitted by il[C
- Reactor Internals IJHL evaluatiun of tLI4FD-42 and the AT30-2 test
~
i Jeta are to be sent to LILC for aeview.
- CLOM Snubbers lekC evaluation of snubber data is to be sent to llLC for seview.
2 Midland 1&2 1
Soil Settlement Problem 11EC will transiiiit qut stions within the next 60 days to support fiRC hemiIng position during Dis-(overy Pe riod.
2 Broken Anchor Studs Proble.n fill will review Consomrs Fower bo. July 1%0 report by Nv. 31, 1900.
3 Confirciatory Analvsis tifC will identify additional data required to Q
wnplete this tasL.
I h
4 SIR Update Updates are to t;e provided by El[C on a continu-ing basis.
[
[
e 3
Conmoc he l'ed I
$ER tipdate An up ta t e is to be provided by ETLC f or Anwndnent It of the itAR by (kt_l7 l980. Additional up-j u
.:a tes art to t.e p, ov iacd by LT[C on a continuing g
t.a s t s.
m Q
-1 i
2 Confirmatory Analysis Addit ional data vt.suested fium lemas Utilities y
has riot t.ern rete ned.
g i
27
%O M
-- O U===
s J
_________.___m m.__
.._.m_
_.___m________
i I
f i
4
- a r5 TO BE PitFOL!tlD la t Ilf 10 ( u Pi t it tid t'I b C A'.l I f v l f W'.111 11 At41 lASK 10R11Y Pt A:il' PR10s<l i Y TAM Et !!',L LS SIATUS f
4 Celiefunte 182 1
SER loput The *.lR Input for Section 3.1.3 of Au ndnant 15 of the ISAR will t>e sutm.itted by EIEC try O( t. 31, lNO.
2 LER Update L itC will submit an estinate to prepare an fstimated to t,e complete by fluv.
up.t.ite t o ti.e SL R Input based on Auendaent 19 30, 1980 (EltC/r4RC Telecon 10/6/
i
..t the ISAR by 04.t.
3, 1980. Additional up.
80).
da tes as e to t.e provided oil o (untinuing leasis.
{
3 Confio:utory Analysis i n t e r ina s epne t wi l l 1,e issued shortly.
I 5
WiP.2 1
SI R Ir.put t it C will sulm.it an estii.6ste to prepare the 5[R Estin.4ted to be complete by t4ov.
Input t>ased on Ai.cnduent 10 of the FLAR by Oct.
15, 1980 (EIEC/tekC Telecon 10/6/80) 3e!T$-
i 2
Confirmatory Analysis f4o data have been ret elved trone WFPS. fir.C is i
+
tu (ont ac t Wl'PS.