ML19347C031

From kanterella
Jump to navigation Jump to search
Forwards LER 80-110/03L-0
Date released: 12/27/2019 Download: ML19347C031


LER 80-110/03L-0:on 800919,HPCI Min Flow valve,1E41-F012 Failed to Close on Signal.Caused by Mechanical Interlock on Opening Contractor Binding Which Would Not Allow Closing Contractor to Pickup.Contractor Repaired & Returned to Svc
ML19347C033
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/09/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19347C033 (2)
Forwards LER 80-110/03L-0
ML19347C030
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/09/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19347C030 (1)