Forwards IE Insp Rept 50-374/80-23 on 800826-27.No Noncompliance Noted
ML19347B974
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 09/10/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19347B975 List:
References
NUDOCS 8010160330
Download: ML19347B974 (2)


See also: IR 05000374/1980023

Text

-_

__

p ssc

/p

oq'o

UNITED STATES

'

E"

NUCLEAR REGULATORY COMMISSION

7

'

o

$.

A y [E

REGION 111

799 ROOSEVELT ROAD

,

o,

[

GLEN ELLYN, ILLINOIS 60137

'

SEP 1 0 080

'

I

k

Docket No. 50-374

Commonwealth Edison Company

'

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

ihis refers to the routine inspection conducted by K. D. Ward of this

office on August 26-27, 1980, of activities at LaSalle County Station,

Unit 2, author 2 zed by NRC Construction Permit No. CPPR-100 and to the

i

discussion of our findings with Mr. L. Burke and others of your staff

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

,

the course of this inspection.

,

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

.

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

j

Room, except as follows.

If this report contains information that you

!

or your contractors believe to be proprietary, you must apply in writing

'

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an enclosure

to the application.

3o201e0 @

-

.

. .

.

.

.

.-.

.-

.

-

.

-

I

1

i

!

SEP 1 0 DA0

Commonwealth Edison Company

- 2-

i

1

!

i

We will gladly discuss any questions you have concerning this,

inspection.

Sincerely,

.

i

!

.

I

G.

1orelli, Chief

Reactor Construction and

Engineering Support Branch

i

Enclosure:

IE Inspection

i

Report No. 50-374/80-23

cc w/ enc 1:

Mr. J. S. Abel, Director

of Nuclear Licensing

'

j

Mr. L. J. Burke, Site

l

Construction Superintendent

j

Mr. T. E. Quaka, Quality

Assurance Supervisor

j

Mr. R. H. Holyoak, Station

Superintendent

Mr. B. B. Stephenson,

}

Project Manager

1

Central Files

j

Reproduction Unit NRC 20b

AEOD

j

Resident Inspector, RIII

PDR

j

Local PDR

i

NSIC

J

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

4

!

j

2

-I

i

,

a

l

i

t

i

4

i

i

!

.

E

s

m---- - . - . - , - _ .

-

..

,-

,

.

.y-

, , . - ,

-.-m

- r -- --

-v-

--,- - - - - - - ,

--~a-------v-

---

-'m----

e