ML19347B974
| ML19347B974 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 09/10/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19347B975 | List: |
| References | |
| NUDOCS 8010160330 | |
| Download: ML19347B974 (2) | |
See also: IR 05000374/1980023
Text
-_
__
p ssc
/p
oq'o
UNITED STATES
'
E"
NUCLEAR REGULATORY COMMISSION
7
'
o
$.
A y [E
REGION 111
799 ROOSEVELT ROAD
,
o,
[
GLEN ELLYN, ILLINOIS 60137
'
SEP 1 0 080
'
I
k
Docket No. 50-374
Commonwealth Edison Company
'
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
ihis refers to the routine inspection conducted by K. D. Ward of this
office on August 26-27, 1980, of activities at LaSalle County Station,
Unit 2, author 2 zed by NRC Construction Permit No. CPPR-100 and to the
i
discussion of our findings with Mr. L. Burke and others of your staff
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
,
the course of this inspection.
,
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
.
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
j
Room, except as follows.
If this report contains information that you
!
or your contractors believe to be proprietary, you must apply in writing
'
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an enclosure
to the application.
3o201e0 @
-
.
. .
.
.
.
.-.
.-
.
-
.
-
I
1
i
!
SEP 1 0 DA0
Commonwealth Edison Company
- 2-
i
1
!
i
We will gladly discuss any questions you have concerning this,
inspection.
Sincerely,
.
i
!
.
I
G.
1orelli, Chief
Reactor Construction and
Engineering Support Branch
i
Enclosure:
IE Inspection
i
Report No. 50-374/80-23
cc w/ enc 1:
Mr. J. S. Abel, Director
of Nuclear Licensing
'
j
Mr. L. J. Burke, Site
l
Construction Superintendent
j
Mr. T. E. Quaka, Quality
Assurance Supervisor
j
Mr. R. H. Holyoak, Station
Superintendent
Mr. B. B. Stephenson,
}
Project Manager
1
Central Files
j
Reproduction Unit NRC 20b
j
Resident Inspector, RIII
j
Local PDR
i
J
Mr. Dean Hansell, Office of
Assistant Attorney General