Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required
ML19347B957
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/30/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 8010160295
Download: ML19347B957 (1)


Text

4

%,f, J

UNITED STATES 8N' I

NUCLEAR REGULATORY COMMISSION

- oE REGION lil U

D[

799 ROOSEVELT ROAD S% 'O GLEN ELLYN, ILLINOIS 60137 o

SEP 3 01980 i

Docket No. 50-341

'Ihe Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant i

Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:

The enclosed IE Supplement No. 2 to Bulletin No.79-01B is forwarded to you for information. No written response is required.

If you desire j

additional information regarding this matter, please contact this office.

Sincerely, J

0-

/

James G. Keppler Director 4

Enclosure:

IE Supplement No. 2 to Bulletin No.79-01B 1

cc w/ enc 1:

Central Files Director, NRR/ DIM Director, NRR/ DOR AEOD 1

Resident Inspector, RIII PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,

Attorney d

a B020160 2 T

SSINS: 6820 Accession No.:

8008220241 IEB 79-01B, Supple. 2 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 September 30, 1980 1E Supplement No. 2 to Bulletin 79-01B: ENVIRONMENTAL QUALIFICATION OF CLASS 1E EQUIPMENT Enclosed are the generic questions and answers which resulted from NRC/ Licensee meetings in NRC Regional Offices during the week of July 14, 1980 regarding environmental qualification of Class 1E equipment in use at power reactor facilities.

These answers address specific questions asked during the meetings.

Due to the generic nature of some of these questions, the staff is issuing them as a bulletin supplement.

The regional meetings highlighted the fact that in some cases, the scope and depth of the 79-01B review was not clear to licensees.

Therefore, these answers may affect your 79-01B submittal.

These submittals are required by a separate order to be completed by November 1, 1980.

Some answers given in Supplement No. 1 to IEB-79-01B are superseded by these answers.

For example, in Bulletin Supplement No. 1, issued on February 29, 1980, the answer to question No. 5 specified that TMI lessons learned equipment was not included in the review.

However, due to the extension of the response date from April 14, 1980 to November 1, 1980, this equipment is now being addressed since its installation is either complete or required before the issuance of the February 1, 1981 SER.

(See Question No. 21 of this Supplement.)

No specific response is requested by this Supplement; however, all answers contained in the enclosure to this Supplement should be carefully reviewed and considered for applicability in your response to IEB 79-01B.

IE Bulletin No.79-01B was issued under a blanket GA0 clearance (B180225 (R0072); clearance expired July 31, 1980) specifically for identified generic problems.

Supplement No. 2 to Bulletin 79-018 is for information, hence no GA0 clearance is required.

Enclosures:

1.

Generic Questions and Answers to IEB-79-01B and Memorandum and Order (CLI-80-21) dated May 23, 1980 DUPLICATE DOCUMENT Entire document previously entered into system under: