ML19347B925

From kanterella
Jump to navigation Jump to search
Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required
ML19347B925
Person / Time
Site: Summer 
Issue date: 09/30/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
References
NUDOCS 8010160205
Download: ML19347B925 (1)


Text

_

l sanc 8[

o,,

UNITED STATES NUCLEAR REGULATORY COMMISSION

(

o l

a, I REGION 11 g*8 o,

101 MARIETTA ST.. N.W.. SUITE 3100

'\\/

ATLANTA. G EORGI A 30303 SEP 3 01980 In Reply Refer To:

RII:JP0 QlWD South Carolina Electric and Gas Company ATTN:

T. C. Nichols, Jr., Vice President Power Production and Systems Operations P. O. Box 764 i

Columbia, SC 29218 Gentlemen:

The enclosed IE Supplement No. 2 to Bulletin No.79-01B is forwarded to you l

for information. No written response is required. If you desire additional information regarding this matter, please contact this office.

Sincerely,

~ NNTILnn ---

  1. %.a James P. O'Reilly Director

Enclosures:

1.

IE Supplement No. 2 to Bulletin No.79-01B 2.

List of Recently Issued IE Bulletins cc w/ enc 1:

i A. A. Smith, Site QA Coordinator T. B. Conners, Jr.

O. S. Bradham, Manager Nuclear Operations i

l

SSINS:

6820 Accession No.:

8008220241 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMEh7 WASHINGTON, D.C.

20555 September 30, 1980.

IE Supplement No. 2 to Bulletin 79-01B: ENVIRONMENTAL QUALIFICATION CF CLASS 1E EQUIPMLNT Enclosed are the generic questions and answers which resulted from NRC/ Licensee meetings in NRC Regional Offices during the week of July 14, 1980 regarding environmental qualification of Class IE equipment in use at power reactor facilities.

These answers address specific questions asked during the meetings.

Due to the generic nature of some of these questions, the staff is issuing them as a bulletin supplement. The regional meetings highlighted the fact that in some cases, the scope and depth of the 79-01B review was not clear to licensees.

Therefore, these answers may affect your 79-01B submittal.

These submittals are required by a separate order to be completed by November 1, 1980.

Some answers given in Supplement No. I to IEB-79-01B are superseded by these For example, in Bulletin Supplement No. 1, issued on February 29, answers.

1980, the answer to question No. 5 specified that TMI lessons learned equipment was not included in the review.

However, due to the extension of the response date from April 14, 1980 to November 1, 1980, this equipment is now being addressed since its installation is either complete or cequired before the issuance of the February 1, 1981 SER.

(See Question No. 21 of this Supplement.)

No specific response is requested by this Supplement; however, all answers contained in the enclosure to this Supplement should be carefully reviewed and considered for applicability in your response to IEB 79-01B.

IE Bulletin No.79-01B was issued under a blanket GA0 clearance (B180225 (R0072); clearance expired July 31, 1980) specifically for identified generic problems. Supplement No. 2 to Bulletin 79-01B is for information, hence no GAO clearance is required.

Enclosures:

1.

Generic Questions and Answers to IEB-79-01B and Memorrndum and Order (CLI-80-21) dated May 23, 1980

~

DUPLICATE DCCUMENT Cntire document previcusly entered into system under:

l nuo 86d8229M/

N No. of pages:

l I

l l