CO M PO R A T to 4 Septenber 22, 1980 File:
3-0-3-a-4 Mr. J. P. O'Reilly Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Suite 3100 101 Marietta Street N. W.
Atlanta, GA 30303
Subject:
Crystal River.Eni Docket No<5D-30J)t 3 Operating Licsnse NO. DPR-72 1.E.Bulletin 80-18; MAINTENANCE OF ADEQUATE MINIMUM i
FLOW THROUGH CENTRIFUGAL CHARGING PUMPS F0LLOWING i
SECONDARY SIDE HIGH ENERGY LINE RUPTURE
Dear Mr. O'Reilly:
On July 28, 1980, Florida Power Corporation received the subject IE Bulletin 80-18, datea July 24, 1980.
Since receipt of this Bulletin, FPC has been working with Gilbert Associates, Inc., to evaluate the concerns identified in the Bulletin.
To continue our evaluation, it has been determined that pump-specific data is required for pump curves.
Gathering this data through surveil-lance procedure and reanalysis of the concerns of the Bulletin would require until October 10, 1980.
At that time, if availability of mini-mum cooling flow for the centrifugal charging pumps is not assured,,:n 4
will notify you immediately and provide an interim procedure and/or modification to continue operation of the plant.
Our response to the Bulletin with schedule for modifications, if re-quired, will be submitted to you on or before October 24, 1980.
i y.
8010160 6Q
.*iaceeq(
General Office 3201 inarty fourm street soum. P O Bot 14042, St Petersburg, Flonda 33733 e 813-866-5151
. _ _ =.
f,
.; it i'r. J. P. O'Reilly Page Two September 22, 1980 l
This schedule. has been discussed with CR-3 Resident Inspector, Mr. Tom Stetka.
Please contact this office if you have any questions concerning this j
matter.
i Very truly yours,
{
FLORIDA POWER CORPORATION
.i l
Ronald M. Bright i
Acting Manager Nuc har Support Services Lobo (PABekcM02)D-8-3 e