VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 80-u9 FOR THE M0iTIH OF SEPTEMBER,1980 I

80101503o5

OPERATING DATA REPORT DOCKET NO, 50-271 DATE 801007 COMPLETED 3Y F. C. Seers TELEPHONE 617-36b-8811, X2215 OPERATING STATUS

1. Unit Name:

Vermont Yankee

2. Reporting Perio? :

September

3. Licensed Thermal Power (Mut):

1593

4. Nameplate Rating (Gross MWe):

540

5. Design Electrical Rating (Net MWe): 514 (Onen) a04 (Close d)
6. Maxi =um Dependable Capacity (Gross MWe):

535

7. Maxi =um Dependable Capacity (Net MWe):

504

8. If Changes Occur in Capacity Ratings (Items Nu=ber 3 Through 7)Since Last Report, Give Reasons:

Fower output limited due to end of cycle

9. Power Level to Which Restricted,If Any(Net MWe):

coastdown

10. Reasons For Restrictions, If Any:

This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720 6575
12. Nu ber Of Hours Reactor Was Critical 624.43 6266.30 57425.28
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator on-Line 623.50 6200.10 55527.88
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MhE) 869444.00 9347971.00 78572584.00
17. Gross Electrical Energy Generated (MWH) 296041.00 3136006.00 26105676.00
13. Net Electrical Energy Generated (MWH) 266815.00 2972808.00 24741173.00
19. Unit Service Factor 86.60 94.30 78.91
20. Unit Availability Factor 86.60 94.30 78.91
21. Unit Capacity Factor (Using MDC Net) 73.53 89.71 69.76
22. Unit Capacity Factor (Using DER Net) 72.10 87.96 68.40
23. Unit Forced Cutage Rate 0.0 1.85 6.40 24 Shutdevns Scheduled Over Next 6 lbnths(Type, Date, and Duration of Each):

Annual refueline outa2e becan September 26, 1980 and will continue for anornximatelv eight weeks.

25. It Shut Ocwn At End Of Report Period, Estimated Date of Startup.
26. Units In Test Status (Prior to Ccemercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CCMMERCIAL OPERATION

AVERAGE DAILY UNIT PO'4ER LEVEL AC'ET No. 50-271 UNIT Vermont Yankee DATE 801007 CCMPLETED BY F. J. Burger TELEPHONE 802-257-7711, X137 MONTH September DAY AVERAGE DAILY P0'4ER LEVEL DAY AVERAGE DAILY PC'.ER LEVEL (L'e-N e t)

($'e-Ne t) 1.

433 17.

428 2.

432 18.

426 3.

438 19.

428 4

437

20. _ _

424 5.

432 21._

419 6.

432 22.

415 7.

436 23.

417 S.

437 24.

424 9.

436 25.

424 10.

434 26.

379 11.

434 27.

0 12.

433 28.

0 13.

431 29.

0 14.

426 30.

0 1

15.

429 31.

16.

432 INSIRUCTICNS:

On this f o r=at, list the average daily unit power level in 5'a-Net for each day in the reporting scnth. Cc=pute to the nearest whole negawatt.

P

F UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-271 UNIT NAME Wrmont Yankee DATE 801007 REPORT MONTil SCPtC13hCI-r COMPLETED BY F. J. Burger TELEP110NE 802-257-7711,_X137 l

n i

f No.

Date ts u

License FM v.

NO E

3UN Event 8$

S-3 A"

I""

N

$6 0

$.E $

Report #

EO

$0 enn Recunence 4

A N

9m m

o A

g u

a 80-21 800926 S

96.5 C

1 N/A Id FUELXX Shutdown for Annual Refueling 4

5 1

3 4

F: Forced

' Reason:

Method:

Exhibit G-Instrinctions S: Scheduled A-Equipment Failure (Explain) 1- !!anual for Preparation of Data B-flaintenance or Test 2-Manual Scram Entry Sheets for Licennee C-Refueling 3-Automatic Scram Event Report (LER) Flie D-Regislatory Restriction 4-Other;(Explain)

(NUREG 0161)

E-Operator Traf ning & License Examination 5

F-Adminis t ra tive Extilbit I - Same Source G-Operational I rror (Explain) i II-Other (Explain) 7/80 s

, ~,_

--_.,-_..---------.,,,----,,-,.-------,-m,-,w..

.-y


s-----..--,..-.ec.

-r--,.

- _ -. + -

DOCKET No.

50-271 UNIT Vermont Yankee i

DATE 801007 i

COMPLETED BY F. J. Burger I

TELEPIIONE 802-2 R-7711. X137 SAFETY RELATED ttAINTENANCE j

t:ATURE OF LEP OR OUTAGE MALFUNCTI0tl i

EQUIPf1ENT MAINTENANCE HL'tBER CAUSE RESULT

. _ CORRECTIVE ACTION j

I SLC Continuity Alarm Corrective N/A Faulty Indicator Constant Alarm Changed Bulb MR 60-863 Bulb RitR Service Water Pump Corrective RO 80-27/3L Worn Parts Valve Not Replaced Parts as Discharge Check Valve MR 80-888 Seating Necessary V70-48D incal Power Range Corrective N/A Loose Power Instrument Fall-Resented Power Supply Monitor 08-33A MR 80-945 Supply Module ed Doe,,1c Module MSIV 86-B Corrective N/A Worn Packing Leakage Repacked Valve MR 80-962 i

i i

4 4

,,e a

v

---w-

-m-

-m m-- - - -.-,--

,~---

_.-a.

. ~

]

DCCKET NO. 50-271 UNIT Vermont Yankee DATE 801007 COMPLETED BY F J. Burger TELEPHOME 802-257-7711, X137 REPORT MONTH September St"t%RY OF OPERATING EXPERIE' ICES High11ehts Ver:ent Yankee operated at 75.8% of rated ther=al power for the =onth.

Gross electrical generation was 286,043 MWH, or 73.57%of design electrical capacity.

Operatine Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:

9/1/80 At the beginning sr the reporting period the plant was operating at 89.5% of rated thermal power and in the process of coast down for the refueling outage.

9/26/80 At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />, a plant shutdown was initiated in preparation for the annual refueling outage.

9/26/30 At 2334 hours0.027 days <br />0.648 hours <br />0.00386 weeks <br />8.88087e-4 months <br />, the turbine generator was taken off the grid.

9/30/80 At the end of the reporting period, the plant was shut down.