Forwards IE Insp Rept 50-456/80-08 on 800724 & 0814 & Notice of Violation
ML19347B481
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 08/28/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19347B482 List:
References
NUDOCS 8010150146
Download: ML19347B481 (2)


See also: IR 05000456/1980008

Text

__

_

_

_

_

__

_

_

  1. f

io,

UNITED STATES

T@

i

%

NUCLEp.R REGULATORY COMMISSION

, , , 'E

REGION lli

$/

o, <

f

799 ROOSEVELT ROAD

=

' %#

g

GLEN ELLYN,lLLINOIS 60137

. . . . .

'

.

'

%UG 2 81980

Docket No. 50-456

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. E. K. Lee of this office

on July 24, and August 14, 1980, of activities at Braidwood Station,

Unit 1, authorized by NRC Construction Permit No. CPPR-132 and to the

discussion of our findings with Mr. R. Cosare and others of your staff at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

-

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

.

c

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office

within thirty days of your receipt of this notice a written statement

er explanation in reply, including for each item of noncompliance:

(1) corrective action taken and the results achieved; (2) corrective

action to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

l

Part 2, Title 10, Code of Federal Regulations, a copy of this letter,

the enclosures, and your response to this letter will be placed la the

NRC's Public Document Room, except as follows.

If the enclosures contain

i

information that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from 1.ublic disclosure. The

application must include a full statement of the reasons for which the

information is considered proprietary, and should be prepared so that

proprietary information identified in the application is contained in

an enclosure to the application.

l

soloiso 1yg

>

I

Commonwealth Edison Company

-2-

SUG 2 8 tse(k

'

_

We will gladly discuss any questions you have concerning this

,

inspection.

Sincerely,

p2VO<. '

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-456/80-08

cc w/encls:

Mr. J. S. Abel, Director

of Nuclear Licensing

Mr. R. Cosaro, Project

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean llansel), Office of

Assistant Attorney General

,

l