k-L.
091'c"<n08 PUBLIC SERVICE INDIANA S. W. Shields Vice Presdent - Electric System September 11, 1980 Mr. James G. Keppler, Director Docket Nos.: STN 50-546 U. S. Nuclear Regulatory Commission STN 50-547 l
Region III Construction Permit Nos.:
799 Roosevelt Road CPPR - 170 Glen Ellyn, Illinois 60137 CPPR - 171 Marble Hill Nuclear Generating Station - Units 1 and 2
Dear Mr. Keppler:
On August 13, 1980, Mr. T. D. Geib of Public Service Company of Indiana, Inc., (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). During a receipt inspection reverification of auxiliary steel performed by the Cherne Contracting Corporation (CCC) several deficiencies were identified. A number of pieces of auxiliary steel, steel used to support pipe hangers had undercut welds, undersize fillet welds and incorrect veld contour, pinholes or drawing non-compliances.
PSI is presently evaluating these deficiencies to determine their effect on safe operation of the plant. PSI anticipates completion of this evaluation, determination of any necessary corrective action and submittal of a final report on or before December 15, 1980. This letter is intended to fulfill the requirements of an interim report as i
defined in 10 CFR 50.55(e).
If you have any questions please feel free to contact me.
Sincerely, j
/
S. W. Shields TDG/cg cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 l
E. R. Schweibinz, P. E.
J. J. Harrison 93A03 015009 C i