ML19347B432

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-312/80-21 on 800707-11 & Notice of Deviation
ML19347B432
Person / Time
Site: Rancho Seco
Issue date: 08/14/1980
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML19347B424 List:
References
NUDOCS 8010150070
Download: ML19347B432 (2)


See also: IR 05000312/1980021

Text

,

"

PPR

-

.

y1pa arcg(of

UNITED STATES

g

g

NUCLEAR REGULATORY COMMISSION

1: E

REGION V

,#[

0,

1990 N. CALIFORNIA BOULEVARD

%,

$UlTE 202, WALNUT CREEK PLAZA

  • e,,*

WALNUT CR E E K, CALIFORNI A 94596

E 1 4 .1980

Docket No. 50-312

Sacramento Municipal Utility District

P. O. Cox 15830

Sacramento, California 95813

Attention: Mr. John J. Mattimoe

Assistant General Manager and Chief Engineer

'

Gentlemen:

Subject: NRC Inspection

This refers to the inspection conducted by Mr. G. B. Zwetzig of this office

on July 7 to 11, 1980 of activities authorized by NRC License No. DPR-54,

and to the discussion of our findings held by Mr. Zwetzig with Mr. R. J.

Rodriguez and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and obser-

vations by-the inspector.

l

Basec on the results of this inspection, it appears that one of your activities

l

deviated from a commitment expressed in the Rancho Seco Final Safety Analysis

l

Report, as set forth in the Notice of Deviation, enclosed herewith as Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201, of

i

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

i

,

l

We request that you submit to this office, within twenty (20) days of your

receipt of this notice, a written statement or explanation in reply including

4

(1) corrective steps which have been taken by you and the results achieved;

(2) corrective steps which will be taken to avoid further deviations; and

(3) the cate when full compliance will be achieve!.

s

1

SS101500N

l

l

'

,

Sacramento !!unicipal Utility District

-2-

I a 1980

In accordance with Section 2.790 of the t'RC's " Rules of Practice," Part 2,

'

Title 10, Code of Federal Regulaticas,'a copy of this letter and the enclosed

inspection report will be placed in the flRC's Public Document Room.

If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20

days of the date of this letter, reouesting that such information be withheld

from public disclosure. The application must include a full statement of

the reasons why it is claimed that the information is proprietary. The appli-

cation should be prepared so that any proprietary information identified

is contained in an enclosure to the application, since the application without

the enclosure will also be placed in the Public Document Room.

If we do not

hear from you in this regard within the specified period, the report will be

placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Since, rely,

,

k

flhW

[,J.[LtCrews, Chief

Reactos Operations and fluclear

,

v

Support Branch

.

Enclosures:

A.

flotice of Deviation

B.

IE Inspection Report

ilo. 50-312/80-21

cc w/o enclosure B:

R. J. Rodriguez, SMUD

L. G. Schwieger, SMUD

i