Forwards IE Insp Rept 50-346/80-19 on 800616-20,23-27 & 30 & 0701-03 & 07-11 & Notice of Violation
ML19347A786
Person / Time
Site: Davis Besse 
Issue date: 08/12/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19347A787 List:
References
NUDOCS 8009300238
Download: ML19347A786 (2)


See also: IR 05000346/1980019

Text

'

ifi

~, - s

/

V

/)

[pn VE!

.,

'o,,

UNITED STATES

g(pp

8

NUCLEAR REGULATORY COMMISSION

[

,.,

g

,e

REGION 111

"

%, -

/[

799 ROOSEVELT ROAD

0,,

GLEN ELLYN,ILLINOls 60137

-

AUG t 2 9001

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. R. P. Crouse

Vice President

Nuclear

Edison Plaza 300

Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Mr. L. A. Reyes of this office

on June 16-20, 23-27, 30, July 1-3, 7-11, 1980 of activities at the

Davis-Besse Nuclear Power Station, Unit 1, authorized by NRC Operating

License No. NPF-3 and to the discussion of our findings with Mr. T. Murray

on June 30, 1980 and through the course of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed Appen-

dix A.

-

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires you to submit to this office within 20 days

of your receipt of this notice a written statement or explanation in

reply, including for each item of noncompliance: (1) corrective action

taken and the results achieved; (2) corrective action to be taken to

avoid further noncompliance; and (3) the date when full compliance will

be achieved. The inspection showed that action had been taken to correct

the noncompliance identified in Item 3 of the Notice of Violation. No reply

to the noncompliance is required.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

l

I

8009300238

.

.

-.

.

.

YELLOV! FILE C03Y

Toledo Edison Company

-2-

AUG 1 2 980'

.

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to with-

hold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in an enclosure to the

application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

.

R. F. Heishman, Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

~

No. 50-346/80-19

.

cc w/encls:

-

Mr. T. D. Murray, Plant

Superintendent

Resident Inspector

Central Files

Reproduction Unit NRC 20b

AE0D

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power

Siting Commission

Helen W. Evans, State

of Ohio

RIII

RIII

RIII

6

Yh

6

Reyes/cs

.

Warnick

ei haan

8/7/80g u]#gD

g(i $

--

-

-

-- -

-