Responds to Re Noncompliance Noted in IE Insp Repts 50-454/80-12 & 50-455/80-11 on 800617-19.NRC Position Unchanged.Response Re Present & Future Corrective Steps & Date of Full Compliance,Must Be Submitted within 30 Days
ML19347A780
Person / Time
Site: Byron  Constellation icon.png
Issue date: 09/16/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8009300215
Download: ML19347A780 (2)


See also: IR 05000454/1980012

Text

(pt ""C:y[

h

UNITED STATES

s

+,

NUCLEAR REGULATORY COMMISSION

f

o

REGloN 111

,

O

if

799 ROOSEVELT ROAo

/

GLEN ELLYN, ILUNOIS 60137

  • ..+

SE.P 15 #

.-

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This is in response to Mr. Abel's letter of August 12, 1980, concerning

an item of noncompliance identified at the Byron Station and brought to

your attention by our letter dated July 10, 1980. We have reviewed your

response and our position on this matter remains unchanged.

We acknowledge that our finding of a " common header" was a mischaracteri-

zation; however, our finding that a nonconforming condition exists remains

,

unchanged.

Cooling system lines essential to operation of the redundant

j

cmergency diesel generators, do not meet the single (common mode) failure

criteria.

Lines serving both generators are located, in part, in a

common room housing one of the emergency diesel generators such that a

single postulated accident could lead to failure of both cooling lines

and thus failure or degradation of both generators.

The following clarification is provided concerning the statement in the

last paragraph of your response relative to respective NRC responsibilities.

The inspection and administrative practices of the Nuclear Regulatory

Commission routinely include verification of the licensee's adherence

to design commitments, which in turn relate to the design criteria.

Failure to meet these commitments does constitute an item of noncompliance.

8009800275

.

_.

.

.

. ___

__

i

6-

,-

Commonwealth Edison Company

-2-

yg g

To reiterate, your response must include:

(1) The corrective steps which

have been taken by you and the results achieved, (2) the corrective steps

which will be taken to avoid further noncompliance, and (3) the date when

full compliance will be achieved. Section 2.201 of 10 CFR Part 2 requires

that you respond within thirty. days of your receipt of this letter.

,

if you have further questions'regarding this matter please contact this

1

office.

4

Sincerely,

.

b

pJamesG.Keppe

Director

{

l

cc:

Mr. J. S. Abel, Director

a

of Nuclear Licensing

j

Mr. Gunner Sorensen, Site

'

Project Superintendent

Central Files

.

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney veneral

Myron M. Cherry, Chicago

i

,

.

1

J

%

A

4

-

_

. _ .

_ . _ _ . . _ _ . _ .

. _ _

, _.

_

_ - . _ _ _