ML19346B574

From kanterella
Jump to navigation Jump to search
Forwards Oyster Creek Security Plan,Rev 31 W/Changes in Accordance w/10CFR50.54(p).Plan Withheld
ML19346B574
Person / Time
Site: Oyster Creek
Issue date: 06/14/1993
From: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C321-91-2183, NUDOCS 9306210152
Download: ML19346B574 (2)


Text

-

SAFEGUARDS INFORMATION 2

GPU Nuclear Corporation d?U MUClear Ei3%F **

Forked River, New Jersey 08731-038B 609 971-4000 Wr:ter's D rect D.a! Number.

June 14,1993 C321-93-2183 U. S. Nuclear Regulatory Commission

Attn: Document Control Desk Washington, DC 20555 -

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station .

Docket No. 50-219 Security Plan Revision 31 -

Enclosed is a copy of the Oyster Creek Security Plan, Revision 31, and a summary of changes. This plan change was made in accordance with 10 CFR 50.54(p). .

The enclosed Security Plan contains safeguards information and must be withheld .

form public disclosure in accordance with 10 CFR 73.21.

If any additional information or assistance is required, please contact Mr. John Rogers ,

of my staff at 609.971.4893.

o \ .  !

I L g John J. Barton Vice President and Director Oyster Creek u Enclosure i

! I JJB/JJR cc: Administrator, Region I i L Senior Resident Inspector Oyster Creek NRC Project Manager SAFEGUARDS INFORMATION ATTACHED.

  • UNAUTHOR: ZED DISCLOSURE IS SUBJECT TO CML AND CR:M:NAL SANCTIONS.

WHEN SEPARATED FROM ENCLOSURES, fO HANDLE TH!S DOCUMENT AS l DECONTROLLED. ,

l- 9306210152 930614 J' l 2 PDR F

ADOCK 05300219 SAFEGUARDS INFORMATION 4 t

CF t c A u V 2. U GPU Naciear Co'poraton is a subsdary o' General Pubhc Utit es Corporat*on

C SAFEGUARDS INFORMATION y

d. .j e

i Oyster Creek Security Plan. Revision 31 i

Summary of Changes  ;

l

1. Section 1.1 and Enclosure 1.1 are being revised to reflect the corporate reorgag,ization and subsequent title change for the division vice president. ,

i

2. Enclosure 1.3, Employment Application, has been revised to reflect the i employment application that is currently being used by the Oyster Creek Human Resources Department. .!
3. Enclosure 2.2 has been revised to reflect the addition of a Protected Area
  • Fence Gate located north of the Intake Structure. This gate meets the  ;

barrier specifications listed in 10 CFR 73.2, and does not decrease the .i effectiveness of the pre-existent barrier.  ;

4. Enclosure 3.4 has been revised to reflect the existing search equipment  ;;

configuration and storage rooms that are loets i the Main Gate l Processing Center. The search equipment was Sgured to enhance the  :

detection capability of the equipment. The equipi...:nt does not degrade the.

effectiveness of the Main Gate Processing Center.  ;

w-9 I

SAFEGUARDS.lNFORMATION ATTACHED. i UNAUTHORIZED DISCLOSURE IS SUBJECT -

TO CML AND CRIM NAL GANcTIONS. t WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS  ;

DECONTROLLED.  ;

SAFEGUARDS INFORMATION y i

.~ . . . - . .. . -.  ::