w 22, m2
- Mr. Paul Wagner Institute of Nuclear Power Operations Suite 1500, 1100 Circle 75 Parkway At.lanta, Georgia 30339-3064
Dear'Mr. Wagner:
Enclosed for your information is our biweekly listing of generic communica-tions being considered or under development by the NRC staff. These include Bulletins (type coded BL on the list), Information Notices (IN) and Generic Letters (GL). Temporary Instructions, that cover the special l
NRC inspection effort resulting from certain generic communications, are listed with the type code TI. This listing includes all proposed generic communications that had been reported to us by May 18, 1992.
The dates given are the ending dates for the quarter during which we expect the listings to be issued.
Generic communications that have been issued or canceled are retained on the list for one biweekly cycle. Those issues to be dropped from the list are identified by a notation in brackets giving the status change.
NVINN1bdBy Crd H. Balinger Carl H. Berlinger, Chief Generic Communications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation
Enclosure:
As stated cc:
S. D. Richardson, Defense Programs (Savannah River), DOE R. W. Barber, Safety and Quality Assurance, DOE S. Scott, Office of Nuclear Safety, NS-10, DOE DISTRIBUTION w/ enclosure:
KEBrockman, OCM JScarborough, OCM KAConnaughton, OCM JGuttmann, OCM TPGwynn, OCM WHBateman, EDO All NRC Division Directors All fJRC Branch Chiefs WTRussell, NRR tRossi, NRR CHBerlinger, NRR DGCB Members KBaumann, NRR MBoyle, NRR O
hh,k ]M ft S o
RFraley, ACRS
'Ed JLieberman, OE PDR e,pg g. Central Files o o z,-., DOEA R/F 75 y OGCB R/F y
y--
R /j/y
'-.I)3 g of a JBirmingham R/F c; _ J rat o t.)
Document Name:
INP0 LIST.
i ouz a 0GCB:D0EA:NRR C/0GCB:D cA:fRR JLBirmingham CHBerlinger 1 d, /')C3 h()h 'j e
05/2.//92 jf 05/ /92
\\
Enclosure Page so, 1
05/18/92 PROPOSED GENERIC COMMUNICATIONS i
IN PREPARATION WITHIN THF NRC TP UURCE SUdJECT CONTACT "MN 6 EST QFTR l
GL NRR DET ISI OF MARK I & II STEEL Chen P. Tan (301) 06/30/92 I
ZSGB CONTAINMENTS, REFUEL CAVITIES, 504-3315
& DRAINAGE SYSTEMS GL NRR DST CONTROL ROOM HAT ITABILITY Janak Raval (301) 06/30/92 SPLB SYSTEMS 504-2302 TI NRR DET INSP OF GL 89-04: GUIDANCE ON Ted (301) 06/30/92 EMEB DEVELOPING ACCESTABLE IST PRGMs Sullivan 504-3270 GL NRR DOEA LINE ITEM TS IMPROVEMENT, Om Chopra (301) 06/30/92 l
OTSB ACCELERATED EDG TESTING T-Danning 504-3150
[
GL NRR DST INST OF MICP-TROCESSORS IN Garry (301) 06/30/92 i
SICB SA!E;i SYSTEMS VIA 10 CFR 50.59 Garten 504-2931 GL NRR DST GROUNDS IN DIRECT CURRENT F.
Burrows (301) 06/30/92 SELB DISTRIP.UTION SYSTT.MS 504-2901 IN Fb ION II PREMATURE TRIFPING & INADEQUATE Satish K.
(301) 06/30/92 Ris NRR TESTING OF THE INSTANTANEOUS Aggarwal 504-3829 TRIP FEATURE OF MCCBs i
4 IN NRR DREP
[IN 92-36, ISSUED 5/7/92]
John (301) 06/30;92 PRAB INTERSYSTEM LOCA OUTSIDE Schiffgens 504-1074 CONTAINMENT IN NRR DOEA SHORTING OF ROTOR POLE WINDINGS Andy Kugler (301) 06/30/92 OGCB IN PARSONS PEEBLES GENERATORS 504-2828 i
GL NRR DREP UTILITY IMPLEMENTATION OF Robert (301) 09/30/92 PRAB ACCIDENT MANAGEMENT PLANS Palla 504-t095 GL NRR DOEA MODIFICATION OF TS REQsIREMENTS Tom Dunning (301) 09/30/92 OTSB FOR EMERGFFCY & SECURITY PLANS 504-1189 GL NRR DOEA T3 IMPROVEMENT: REDUCED TESTING Tom Dunning (301) 09/30/92 OTSB DURING POWER OPERATION 504-1189 l
IN NRR 3RIS MODIFICATIOM OF CG ITEMS BASED Steve (301) 06/30/92 P;.B ON QUALIFICATION EXPERIENCE Alexander 504-2995 IN NRR DRIS UNDERAGTNG OF NRMLY ENERGIZED Steve (301) 06/30/92 RVIB SOL OP:JATED TEST SPECIMENS Alexander 504-2995 IN NRR DST DESIGN DEFICIENCY IN MEDIUM Faust Rosa (301) 06/30/92 SELB VOLTAGE DISTRIBUTION SYSTEM 504-2774 L
4 Page No.
2 05/18/92 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC i
Tc SOURCE SUBJECT CONTACT PHONE EST QRTR IN NRR DST REPLACEMENT OF PLANT COMPOTER Iqbal Ahmed (301) 06/30/92 (
SICB AT PCWER 504-3252 GL NRR DOEA MODIFICATION OF TS REQUIREMENTS Tom Dunning (301) 09/30/92 OTSB FOR MOVABLE CONTROL ASSEMBLIES 504-1189 GL NRR D'.1.A REMOVAL OF TECH SPEC TABLES FOR Tom Dunning (301)
_09/30/92 OTSB RESPONSE TIME LIMITS 504-1189 IN NMSS IMNS REi1EW OF MFR's INFO ON COMPU Lathy Haney (301) 06/30/92 IMOB TERIZED THERAPY PLANNING SYSs 504-2628 GL NRR DOEA INSERVICE LEAK AND HYDROSTATIC Carl S.
(301) 06/30/92 OTSB TESTING TS BACKFIT APPEAL Schulten 504-1192 I" NRR DOEA FAILURE OF CONTROL ROD SCRAM
'om Greene (3011 06/30/92 EAB ACCUMULATOR LEVEL SWITCH 504-1175 IN REGION II SLP TO IN 91-42. OPERATING P.ichard (404) 06/30/92 DRS OB EVENTS FROM VALVE Crlenjak 841-5S4; MISPOSITIONING DUR.d.J TESTS IN MRR DOEA SAFETY-RELATED DEFICIENCIES IN Vern 3cdc.e (301) 06/30/92-OGCB Ei.is 504-1861 GL NRR DREP PROTECTIVE ACTIONS RFCOMMENCED Falk Kantor (301) 09/30/92 PEPB FOR SEVERE ACCIDENTS 504-2907 IN REGION INADEQUATE TESTING OF EMERGENCY David S.
(708) 06/30/92 III BUS UV LOGIC CIRCUITRY Butler 790-5796 BL NRR DST SUP TO BL 90-01, LOSS OF Robert (301) 06/30/92 l SICB FILL-CIL IN TRAdSMITTERS Perch 504-2844 l
MAh"JFACTURED BY ROSEMOUNT IN AEOD DSP NOZZLE RING SETTINGS ON LOW S.
Israel (301) 06/30/92 ROAB PRESSURE REL.EF VALVES 492-4437 GL NRR DLPQ THERMO-LAG FIRE BARRIERS AND Loren (301) 06/30/92 LPEB COMPLIANCE WITH 10 CFR 50.48 Plisco 504-1013 BL NMSS IMNS SAFETY ISSUES RE LOSS OF MFRs Robert L.
(301) 06/30/92 i IMAB SUPPORT FOR TELETHERAPY UNITS Ayres 504-3423 TI NMSS IMNS TI FOR BL 91-01, REPORTING LOSS A.
T. Clark (301) 06/30/92 -
IMSB OF CRITICALITY SAFETY CONTROLS 504-3424 4
IN NRR DREP HIGH AIRBORNE LEVELS AT NUCLEAR Jack Bell (301) 06/30/92 )
PRPB POWER FLANTS 504-1083 i
~
I Page.No.
3 05/18f92 PROPOSED GENERIC COMMUNICATIONS i
IN PREPARATION WITHIN THE NRC TP SOURCE SUBJECT CONT 3.CT-PHONE EST QDTR GL AEOD DOA TESTING OF EMERGENCY RESPONSE John (301) 06/30/92 IRB DATA SYSTEMS Jolicoeur 492-4155 t
IN NRR DST BYPASSING OF PROTECTIVE TRIPS S.
N.
Saba (301) 06/30/92 SELB FOR EDGs DURING ACCIDENT 504-2781 CONDITIONS (SUP TO IN 91-34)
IN NRR DST CONTAINMENT ISOLATION John (301) 06/30/92 SPLB CAPABILITY FOR ECCS Kudrick 504-2871 IN NRR DOEA FAILURE OF 120V REi../S USED IN Nick Fields (301) 06/30/92 i
EAB SAFETY-RELATED APPLICATIONS 504-1173
[
IN AEOD DSP BYPASSING OF EMERGENCY CORE John (301) 06/30/92 ROAB COOLING SYSTF' Kauffman 492-4436 i
GL NRR DET NRC POSITION ON EPRI OBE Goutam (301) 06/30/92 ESGB CRITERIA & EPRI GUIDE FOR Bagchi 504-2733 RESPONSE TO AN EARTHQUAKE GL NRR-DOEA SUP TO GL 83-28, REQUIRED Peter Wen (301) 06/30/92 l
OGCB ACTIONS ON GENERIC IMPLICATIONS 504-2832 OF SALEM ATWS EVENTS l
IN REGION
[IN 92-39, ISSUED 5/13/92]
M.
Leach (708) 06/30/92 III UNPLANNF.D RETURN TO CRITICALITY 790-5559 DURING REACTOR SHUTDOWN IN NMSS IMNS [IN 92-37, ISS7ED 5/8/92]
Susan L.
(301) 06/30/92 IM'.B IMPLEMENTATION OF THE Greene 504-2686 PELIBl. RATE MISCONDUCT KULE IN REGION IV FAILURE OF SR EQUIPMENT FROM Thomas (817) 06/30/92 PROBLEMS NOT DETECTABLE DURING Westerman 860-8145 Sih EILLANCE TESTING IN NRR DOE 7 Di' GRADED 1 RID ISSUES AT DRESDEN Nick Fields (301) 06/30/92 EAB 504-1173 IN REGIO 1; II RES~.")UAL HEAT REMOVAL SYSTEM William (B03) 06/30/92 DRP OVERPRESSURIZATION EVENTS Orders 831-2963 GL NRR DST SHUTDOWN AND LOW POWER Mark Caruso (301) 06/30/92 SPLB OPERATIONS (NUREG 1449) 504-3235 IN NRR DRIS INADEQUATE VENDOR INTERFACE FOR Kamal Naidu (302) 06/30/92 RVIB SAFETY-RELATED COMPONENTS 504-2980
\\
Page.No.
4 05/18/92 PROPOSED GENERIC COMMUNICATIONS IM PREPARATION WITHIN THE NRC TP SOURCE SUBJECT CONTACT PHONE EST QRTR IN AEOD DOA DEGRADATION OF SW SYSTEMS Vern Hodge (301) 06/30/92
)
DEIIB CAUSED BY CLOGGING OF INTAKES 504-1861 IN NRR DET EFFECT OF STEM EJECTION LOAD IN Tom
'301) 06/30/92 EMEB MOV THRUST REQMT CALCS Scarbrough 504-2794 IN REGION II EFFECT OF CLEANING AGENTS ON Frank Jape (404) 06/30/92 LUBRICATED EDG FUEL RACKS 331-4182 IN NRR DOEA
[IN 92-16 SUP 1, ISSUED 5/7/92] Robert (301) 06/30/92 EAB LOSS OF FLOW FROM THE RESIDUAL Schaaf 504-1170 HEAT REMOVAL PUMP DURING i
REFUELING CAVITY DRAINDOWN GL RES RPSIB INTERFACING SYSTEMS LOCA IN Gary (301) 09/30/92 LIGHT WATEP. REACTORS Burdick 492-3812 i
IN NRR DLPQ RESULTS OF EMERGENCY OPERATING Greg (301) 06/30/92 r
LHFB PROCEDURES PHASE 3 INSPECTIONS Galletti 504-1831 IN NRR DRIS. POTENTIAL STRESS CRACKS IN THE Randy Moist (301) 06/:0/92 RVID ARMATURE CARRIER BLOCK OF 5J4-2945 ELMWOOP-FASCO RELAYS IN REGION I DEGRADATION OF EDGs DUE TO Roy Mathew (301) 06/30/92 OUT-OF-SEQUENCE LOADING 337-5194 GL NRR DREP EMERGENCY CLASSIFICATION DURING Scott (301) 12/31/92 PEPB CONTAINMENT VENTING Boynton 504-2919 IN NRR DOEA
[IN 92-35, ISSUED 5/6/92]
David (301) 06/30/92 OEAB HIGHER... EROSION / CORROSION IN Gamberoni 504-1171 UNISOLABLE REACTOR COOLANT PRESSURE BOUNDARY INSIDE CONTAINMENT AT A BWR IN NRR DST NONCONSERVATIVE BORON DILUTION Larry Kopp (301) 06/30/92 ]
SRXB ANALYSIS INPUT ASSUMPTIONS 504-2879 IN NRR DRIS POTENTIAL DEFICIENCIES IN Randolph (331) 06/30/92 RVIB BATTERIES SUPPLIED BY EXIDE Moist 504-2945
)
IN NMSS IMNS [IN 92-34, ISSUED 5/6/92] NEW Edward Shum (301) 06/30/92 FCSB EXPOSURE LIMITS FOR AIRBORNE 504-2607 UGl!IUM AND THORIUM IN NMSS IMNS LOCKING OF RADIOGRAPHY EXPOSURE Scott W.
(301) 06/30/92 IMOB DEVICES Moore 504-2514
.---~..
A Page.No.
5 o
' 05/18,/92 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP SOURCE SUBJECT CONTACT PHONE EST ORTk I
IN NRR DOEA WESTINGHOUSE DS 206 REACTOR Thomas (301) 06/30/92 OEAB TRIP BREAKER FAILURE Koshy 504-1176 IN NRR DOEA
[NEW] CONTAINMENT ISOLATION Jerry (301) 06/30/92 6
OEAB CAPABILITY FOR MINI-FLOW VALVES Carter 504-1153 IN CORE SPRAY SYSTEM
[
IN NRR DOEA
[NEW) FRAUDULENT BOLTS IN Roger (301) 06/30/92 OEAB SEISMIC WALLS AT BRUNSWICK Woodruff 504-1152 IN NMSS IMOB [IN 92-38, ISSUED 5/12/92]
Kevin M (301)
- 06/30/92 IMPLEMENTATION DA"'E FOR THE Ramsey 504-2534 REVISION TO 'iHE E.. MANUAL OF PAGs AND PROTECTIVE ACTIONS FOR NUCLEAR INCIDENTS
?
i de e me g,q+
7 y
we
-y syw-
-f
.<eg..9p----.-
s-%#e y-esg yyv'y y gw.-,--.y g.y4y--
t-9 q y
9yre---,7-y 9,u y-g y
.y
- m. a m p vry,