ML19346A428

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-282/81-10 & 50-306/81-11 on 810511-15.No Noncompliance Noted
ML19346A428
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/04/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gilberts D
NORTHERN STATES POWER CO.
Shared Package
ML19346A429 List:
References
NUDOCS 8106190354
Download: ML19346A428 (2)


See also: IR 05000282/1981010

Text

'*

.

.

7

hNb

/p. ~yo

UNITED STATES

l'

NUCLEAR RECULATORY COMMISSION

~

o

.E

REGION lli

L

~

Y

799 ROOSEVELT ROAD

\\ ..,* /

otsu attvu. ittisois sois7

JUN 0 41981

f 7.-2,

,,O, '

%

Docket No. 50-282

g'( g(,.',' .3 D

Docket No. 50-306

' 4. uf,j ,_ , 'g

Northern States Power Company

b " ~ i d jggI

C

Ip% 6'g' k%%f

ATTN:

Mr. Dennis E. Gilberts

Senior Vice President

\\

%

Power Supply

\\' 4* , .

414 Nicollet Mall

Minneapolis, MN 55401

'Al! Q

Gentlemen:

This refers to the reutine safety inspection conducted by Mr. J. M. Peschel

of this office on May 11-15, 1981, of activities at Prairie Island Nuclear

Generating Plant authorized by NRC Operating Licenses No. DPR-42 and

No. DPR-60 and to the diacussion of our findings with Mr. F. P. Tierney

and his staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

No items of noncompliance with 57C requirements were identified during

the course of this inspection.

During this inspection a concern was raised regarding your permanent

records center. As a result of a telephone conversation between your

Mr. F. P. Tierney and our Mr. J. M. Perchel, on May 29, 1981, it is

our understanding that your original completion date for the permanent

records center will not be met due to a labor union strike, and that

you will provide us wit t a date for the completion of the permanent

records center when the current construction problems have been resolved.

An additional concern was raised regarding the protection of your records.

This unresolved item is being forwarded to IE Headquarters for review

,

l

and resolution. No action by you is presently required in this area.

1

-

89

4 'll

8.1062so351

Q

.?

.

JUN 0 4 G@

Northern States Power

-2-

Company

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room. If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in tb- Public Document Room.

We will glaa , discuss any questions you have concerning this

inspection.

Sincerely,

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosures:

IE Inspection

Reports No. 50-282/81-10

and No. 50-306/81-11

cc w/ encl:

F. P. Tierney, Jr. ,

Plant Manager

DNB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John W. Ferman, Ph.D.,

Nuclear Engineer, MPCA

.

!

-

,

RI I

RII

RIII.

RI I

RII

W k

'

el/db

er

Little

rd

N

ius

sy?'

/27/81

6

-E l

fj

9

,

t