ML19346A244

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-341/81-05 on 810401-30.No Noncompliance Noted
ML19346A244
Person / Time
Site: Fermi 
Issue date: 05/22/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wells D
DETROIT EDISON CO.
Shared Package
ML19346A245 List:
References
NUDOCS 8106050465
Download: ML19346A244 (2)


See also: IR 05000341/1981005

Text

.

/

"

'

nee

.

UNITED STATES

,,

'o

NUCLEAR REGULATORY COMMISSION

8

o

L

'E

I

REGION 111

~

.

"

8

795 ROOSEVELT ROAD

OLEN ELLYN. ILtlNOl$ 80137

j

e

.....

,

May 22, 1981

QN

Docket No. 50-341

-

11

d

NgQ

-

'

The Detroit Edison Company

\\

9.S-

'

ATTN:

Mr. Donald A. Wells

9

l

Manager Quality Assurance

2000 Second Avenue

gj/ El

'

Detroit, MI 48226

l

!

Gentlemen:

1

This refers to the routine safety inspection conducted by Messrs. B. F. Little

and P. M. Byron of this office on April 1 - 30, 1981, of activities at Enrico *

Fermi, Unit 2 authorized by NRC Construction Permit No. CPPR-87 and to the

discussion of our findings with Mr. W. Fahrner at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

r

l

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

,

l

interviews with personnel.

No items of noncompliance with NRC requiremer.ts were identified during the

j

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

f

!

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

J

I

it is necessary that you (a) notify this office by telephone within seven (7)

'

days from the date of this letter of your intention to file a request for

l

withholding; and (b) submit within twenty-five (25) days from the date of

-

'

this letter a written application to this office to withhold such infor-

nation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

j

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

l

placed in the Public Document Room.

\\

\\gO 9h

'

.

i

k

,

[

.81 06050 %5

GL

-

--

--

..

.

.

.

.-

.

-

.

.

'

t

.

The Detroit Edison Company

-2-

May 22, 1981

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

-

i

!

1

!

!

R. F. Beishman, Acting Director

Division of Resident and

l

,

l

Project Inspection

I

Enclosure: IE Inspection

Report No. 50-341/81-05

cc w/ encl:

,

l

Central Files

Reproduction Unit NRC 20b

AE0D

Resident Inspector, RIII

PDR

Local PDR

-

NSIC

TIC

Ronald Callen, Michigan

Public Service Cossnission

Eugene B. Thomas, Jr.,

,

Attorney

1

l

l

RII

RIIL

RIII

RIII

RIII

Fporelli0V

Heiyan

(in

t e b

M

a

5/20/81

f/gfg.

<

-,

~

- ..,-,.. ,-

..

, _ - . - .

-

, . . - .

. ~ - . . .

-