Responds to NRC 800821 Ltr Re Violations Noted in IE Insp Rept 50-354/79-04.Corrective Actions:Exam of Accessible Diameter Buildups in Progress W/Completion Date Scheduled for 810131
ML19346A192
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/05/1981
From: Martin T
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19346A191 List:
References
NUDOCS 8106050358
Download: ML19346A192 (2)


Text

A A" (2)

Thomas J. Martin Public Service Electric and Gas Cucpany 80 Park Plaza Newark, N.J. 07101 201/4304316 Vics President Engineering and Construction January 5, 1981 Mr. Boyce H. Grier, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region 1 G31 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

NRC INSPLi:" ION REPORT NO. 50-354/79-04 NO. 1 UNIT HOPE CREEK GENERATING STATION The following is a supplemental response to NRC Inspection Report No. 79-04. It is in reply to NRC letter of August 21, 1980 concerning the subject of I.D. weld buildups. PSE&G has submitted previous correspondence concerning this subject on October 14, 1980.

The following interim report provides current status and projected completion dLte for corrective actions necessary to resolve the NRC infraction concerning NDE of weld buildups for Drave supplied piping.

Corrective measures. committed to reexamine six pipes by con-ventional methods cannot be done due to inaccessibility. Two are embedded in concrete (JE 12-inch diesel fuel tank vent lines) and four buried and backfilled outside Unit No. 1 I

(EA 36-inch service water lines).

8106 050 jh!3ijf

.. 3 .

Boyce H. Grier 1/5/81 The examination of all accessible outside diameter buildups has been completed. Exa-:ination of accessible inside diameter buildups is in progress with a projected completion date of January 31, 1981. Upon completion of the NDE, the Bechtel Power Corporation, our Architect Engineer, will provide a final disposition of the results, including disposition of the weld buildups determined inaccessible.

Completion date for this activity is projected for February 27, 1981, at which time a report will be made to the NRC of the results.

Very truly yours, l ORTG. SIGNED gy T. J. gggny CC Office of Inspection & Enforcement Div. of Reactor Construction Inspection Washington, DC H. E. Morris

.Bechtel Power Corp.

San Francisco, CA J