Requests That Thorough Investigation Be Conducted Into Facility Const
ML19346A183
Person / Time
Site: Zimmer
Issue date: 04/27/1981
From: Brelje C
DAYTON, UNIV. OF, DAYTON, OH
To: Metzenbaum H
SENATE
References
NUDOCS 8106050340
Download: ML19346A183 (1)


Text

.

~

$ DO::KET NUMEEf!

, A. PROD. & UTIL FAC.h.). . . ... e

,$,h

, U N I V E R S I T Y C .- D A Y T O N

DAYTON, OHIO 45469 capaavucur c s *wn.oso*Hy p t2 49

^ #LOoKeTEo

. Uctm >.

April 27,1981 N 21E
  • l Senator Howard Metzenbaum g PyP".c': e sq [52 l United States Senate b' l a temce l 347 Russell Senate Office Building Washirgton, D.C. 20510

3, , @ /

w

Dear Senator Metzenbaum:

I am shocked to learn of the possibility that the Zimmer nuclear facility under construction in southwestern Ohio contains serious construction flaws.

I According to Tom Applegate, an undercover iny(tigator who worked in the plant, l and Tom Devine of the Government Accounting Project in Wahington, D.C.. there

are many problems with the facility

l l . crucial welds were shoddily performed

."non-critical" components were substituted for " critical" components

. valves rated at low pressure tolerances were placed in piping which

contains much higher pressure loads

.there have already been a number of accidents regarding piping and valve defects Senator Metzenbaum, all Ohioans, whether they be for or against the use of nuclear power, should be gravely concerned with allegations that the Zimmer plant is seriously flawed.

Please push for a tho'rouah investigation of the Zimmer facility. The potential cost in hum'an lives demands an imediate and thorough investigation.

-Sincerely, -

' l, . . i t -- '

s , /_ _ I' *

  • l Christopher J. B elje s

! Department of Philosophy g ,  :

University of Dayton .e 1 Dayton, OH 45469 9 j@ 0 $ gggie q -

,b i

N . u.s.gss Q. gYy Y' 6 ll0 8106050 Mo N -