Forwards Bechtel, Rept on Re-evaluation of Concrete Masonry Walls in Response to NRC IE Bulletin 80-11 for Peach Bottom Atomic Power Station,Units 2 & 3. Four Walls Found Not Meeting re-evaluation Criteria.Mods in Progress
Date released: 12/26/2019 Download: ML19346A088


Rept on Re-evaluation of Concrete Masonry Walls in Response to NRC IE Bulletin 80-11 for Peach Bottom Atomic Power Station,Units 2 & 3.
ML19346A089
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 04/17/1981
From: Chaudhary M, Hafeez A, Mathur L
BECHTEL GROUP, INC.
To:
References
Download: ML19346A089 (60)
Forwards Bechtel, Rept on Re-evaluation of Concrete Masonry Walls in Response to NRC IE Bulletin 80-11 for Peach Bottom Atomic Power Station,Units 2 & 3. Four Walls Found Not Meeting re-evaluation Criteria.Mods in Progress
ML19346A087
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 05/04/1981
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References