ML19345H449
| ML19345H449 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/03/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19345H447 | List: |
| References | |
| NUDOCS 8105200316 | |
| Download: ML19345H449 (2) | |
See also: IR 05000327/1981010
Text
'#
o
UNITED STsTES
- 8'
NUCLEAR REEULATGRY COMMISSION
n
~
3
E
REZION 11
k
101 MARIETTA ST
N.W.. SUITE 3100
ATLANTA, GEORGI A 30303
APR - 31981
b, Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
_
Chattanooga, TN 37401
Gentlemem
Subject: Report No. 50-327/81-10
This refers to the speciat safety inspection conducted by G. L. Troup of this
office on March 3-5, 1981, of activities authorized by NRC Operating License No.
OPR-77 for the Sequoyah facility. Our preliminary findings were discussed with
J. M. Ballentine at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-
tion report will be placed in the NRC Public Document Room.
If this report
contains any information that you believe to be proprietary, it is necessary that
you make a written application within 20 days to this office to withheld such
information from public disclosure. Any such application must include the basis
for claiming that the information is proprietary and the proprietary information
should be contained in a separate part of the document. If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerel ,
f[
R. C.
, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosures: See Page 2
r.8 1 0 5 2 0 0 3 / b
J
.,
,
.
..
.
.
.
Tennesses Valley Authority
2.
APR - 31!B1
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 5-327/81-10
cc w/ encl;
H. J. Green, Division- Director
G. G. Stack, Project Manager
J. M' Ballentine, Plant
.
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
,
e
^%=~
d
-
._ _
_ - _ .
--. ,_._...___. _ _ __1
.
. .. . .
.
.
. ._. _