UNITEJ STATES
!
1,
NUCLEAR REGULATORY COMMISSION
L
REGION 111
.r
- Y
799 ROOSEVELT ROAD
8
k . . . . . ,o
GLEN ELLYN. ILLINOIS 60137
APR 2 31981
.
.
Docket No. 50-315
@
A
Docket No. 50-316
- (
American Electric Power Service
A
Corporation
q*
Indiana and Michigan Power Company
h
[.9
~._,,
h
ATTN:
Mr. John E. Dolan
-
Vice Chairman
d
4 8
Engineering
g
\\@, s
2 Broadway
New York, NY 10004
ps
%
Gentlemen:
This refers to the routine, unannounced safeguards inspection conducted by
Ms. G. M. Christoffer and Messrs. T. J. Madeda and B. Stapleton of this
office on February 23-27, 1981, of activities at Donald C. Cook Nuclear
Power Plant, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-58
and No. DPR-74 and to the discussion of our findings with Mr. Shaller at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
With respect to items two and three the inspection showed that action had
been taken to correct the identified noncompliances and to prevent
recurrence.
Consequently, no reply to these items of noncompliance is
required and we have no further questions regarding this matter at this
time.
Regarding the remaining item, a written response is required.
810503o#03
ATTACHMENT CONTAINS
PART 2.790(d) INFORMATION
.
.
.
8
4
American Electric Power
-2-
APR 2 319Bf
Service Corporation
Areas examined during this inspection concern a subject matter which is
exempt from disclosure according to Section 2.790 of the NRC's "Rul:s of
, Practice," Part 2, Title 10, Code of Federal Regulations. Consequently,
the enclosure to this letter, our report of this inspection, and your
response to the noncompliance identified in the enclosure to this letter
will not be placed in the Public Document Room. Therefore, your state-
ment of corrective .. Lion regarding the noncompliance identified in the
enclosure should be submitted as a separate enclosure to your transmittal
letter.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
f. $.'hu9, . . .
C. E. Norelius, Acting Director
Division of Engineering and
Technical Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
No. 50-315/81-04
and No. 50-316/81-04
(Part 2.790(d) Information)
cc w/encls:
D. V. Shaller, Plant
Manager
Central Files
Reproduction Unit NRC 20b
AE0D
Resident Inspector, RIII
cc w/encls, w/o Part 2.790(d)
Information:
Local PDR
Ronald Callen, Michigan
Public Service Commission
ATTACHMENT CONTAINS
PART 2.790(d) INFORMATION