ML19345H194

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 58 to License NPF-1
ML19345H194
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/16/1981
From: Clark R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19345H187 List:
References
NUDOCS 8105010196
Download: ML19345H194 (5)


Text

{{#Wiki_filter:- 7590-01 g UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-344 PORTLAND GENERAL ELECTRIC COMPANY, ET AL. NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Reculatory Commission (the Commission) has issued Amendment No. 58 to Facility Operating License No. NPF-1, issued to Portland General Electric Company, the City of Eugene, Oregon, and Pacific Power and Light Company (the licensees), which revised Technical Specifications for operation of Trojan Nuclear Plant (the The amendment is effective facility) located in Columbia Lwnty, Oregon. as of tne date of issuance. The amendment corrects the testing requirement of the diesel fuel transfer pumps and revises the amount of borated water required i to be available in the cold shutdown and refueling modes. The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the The Commission has Act), and the Commission's rules and regulations. made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in l l the license amendment. Prior public notice of this amendment was not required since this amendment does not involve a significant hazard's l l consideration. 8105010190 l - ~ ~ -

7500-01 The Commission has determined tnat the issuance of this amendment will not result in any significant enviromnental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be nrepared in connection with issuance of this amendment. For further details with respect to this action, see (1) the application for amendment dated December 28, 1979, as supplemented June 19, 1980 and March 23, 1981, (2) Amendment No. 58 to License No. NPF-1 and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N.W., Washington, D.C. and at the local public document room located at the Multnomah County Library, Social Science 97205. and Science Department, 801 S.W.10th Avenue, Portland, Oregon A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D.C.

20555, l

Attention: Director, Division of Licensing. 1 Dated at Bethesda, Maryland, this 16th day of April,1981. I FOR THE NUCLEAR REGULATORY COMMISSION ') l f, f %~. s. - I / }.@ { --{ L t. L 6 ( Ro ert A. Clark, Chief Operating Reactors Branch #3 l Division of Licensing i

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-344 PORTLAND GENERAL ELECTRIC COMPANY, ET AL. NOTICE OF 13SUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 58 to Facility Operating License No. NPF-1, issued to Portland General Electric Company, the City of Eugene, Oregon, and Pacific Power and Light Company (the if censees), which revised Technical Specifications for operation of Trojan Nuclear Plant (the facility) located in Columbia County, Oregon. The amendment is effective as of the date of issuance. The amendment corrects the testing requirement of the diesel fuel transfer pumps and revises the amount of borated water required to be available in the cold shutdown and refueling modes. The application for the snendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since this amendment does not involve a significant hazards I consideration. I

7590-01 The Commission has detennined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR $51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment. For further details with respect to this action, see (1) the application for amendment dated December 28, 1979, as supplemented June 19,1980 and March 23,1981,(2) Amendment No. 58 to License No. NPF-1 and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N.W., Washington, D.C. and at the local public document room located at the Multnomah County Library, Social Science and Science Department, 801 S.W.10th Avenue, Portland, Oregon 97205. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D.C.

20555, Attention: Director, Division of Licensing.

Dated at Bethesda, Maryland, this 16th day of April,1981. FOR THE NUCLEAR REGULATORY COMMISSION 0C;L/ $dbc Ro ert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing e -,~s

.p* "% . r w w -c c g j i g UNITED STATES QN, N o, f NUCLEAR REGULATORY COMMISS!ON / N.' p WASHINGTON. D.C. 20555 ff g Docket No. 50-344 Docketing and Service Section b 7 Office of the Secretary of the Commission m

SUBJECT:

PORTLAND GENERAL ELECTRIC COMPANY, ET AL., TROJAN NUCLEAR PLANT Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 12 )of the Notice are enclosed for your use. O Notice of Receipt of Application for Construction Permit (s) and Operating Ucense(s). O Notice of Receipt of Partial Application for Construction Permit (s) and Facility Ucense(s): Time for Submission of Views on Antitrust Matters. O Notice of Availability of Applicant's Environmental Report. O Notice of Proposed issuance of Amendment to Facility Operating Ucense. O Notice of Receipt of Application for Facility Ucense(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of issuance of Facility Ucense(s) and Notice of Opportunity for Hearing. O Notice of Availability of NRC Draft / Final Environmental Statement. O:Jotice of Umited Work Authorization. O Notice of Availability of Safety Evaluation Report. O Notice of Issuance of Construction Permit (s). l 0 Notice of Issuance of Facility Operating License (s) or Amendment (s). i G Other: Amandmant Mn-40 Referenced dc.;uments have been provided PDR. i l Division of Licensino ORB #3 l Office of Nuclear Reactor R~eg,ulation

Enclosure:

As Stated l ynaz .}}