ML19345G911
| ML19345G911 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/10/1981 |
| From: | Novak T Office of Nuclear Reactor Regulation |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19345G912 | List: |
| References | |
| NUDOCS 8104220717 | |
| Download: ML19345G911 (3) | |
Text
v
~
s gf f-l' UNITED STATES NUCLEAR REGULATORY COMMISSION 3,I g
WASWNGTON, D. C. 20555 e
\\vf.....,/
APR 1 4 1981 Docket No. 50-336 Mr. W. G. Counsil, Vice President Nuclear Engineering & Operations Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06101
Dear Mr. Counsil:
SUBJECT:
ENVIRONMENTAL OUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT RE: MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2
Reference:
Order for Modification of License Concerning the Environmental Qualification of Safety-Related Electrical Equipment, October 24, 1980.
This letter transmits the preliminary results of our review of environmental qualifications of safety-related electrical equipment at your facility.
This evaluation was based on your submittals received over the past months.
The facility license was modified by the referenced Order of October 24, 1980, to require that all safety-related electrical equipment be cualified to specified requirements not later than June 30, 1982. In addition, the Order noted that a licensee is obligated to modify or replace inadequate equipment
- prcmptly, e
The staff's review of your submittals has resulted in our identifying a i
l number of potential equipment deficiencies involving a lack of proper documentation, inadequate justification of assumed environmental conditions following an accident, and/or inadequate environmental testing of equipment, such that conformance to the 00R guidelines, as required by the Order, cannot be demonstrated. You are requested to review our identified deff-ciencies, and their ramifications, and provide us your overall finding regarding continued safe operation of your facility. Accordingly, in order l
to determine whether your license should be modified or suspended, you are required pursuant to 10 CFR 50.54(f), to provide within 10 days of receipt of this letter, a written statement, signed under oath or affirmation sup-porting the safe operation of your facility, that takes into account the NRC staff's preliminary list of deficiencies.
l l
?
710 yQ20'7 / 7
'4
. The purpose of this statement is to provide the NRC with needed assurance, by the licensee, regarding the continued safety of the facility until you can provide an item-by-item reevaluation in a detailed documented manner at a later date. A negative finding on your part concerning the safety of continued operation would result in a unit shutdown, and should be reported as a Licensee Event Report (LER) within twenty-four (24) hours of the deter-mination to the appropriate NRC Regional Office.
Include in the LER the actions you have taken for the immediate resolution of the matter. A ccpy l
of any such LER should be sent to the Director, Division of Licensing, Office of Nuclear Reactor Regulation.
Please submit a copy of your reply to us via telecopy.
Sincerely, Thomas M. Novak, Assistant Director for Caerating Reactors Division of Licensing
Enclosure:
Evaluation Report cc w/ enclosure:
See next page l
i
~~~
l
~
Northeast Nuclear Energy Company cc:
William H. Cuddy, Esquire Mr. John Shedlosky Day, Berry & Howard Resident Inspector / Millstone Counselors at Law c/o U.S.N.R.C.
One Constitution Plaza P. O. Drawer KK Hartford, Connecticut 06103 Niantic, CT 06357 Anthony Z. Roisman Mr. Charles Brinkman Natural Rescurces Defense Ccuncil Manager - Washington Nuclear 91715th Street, N.W.
Operations Washington, D. C.
20005 C-E Pcwer Systems Combustien Engineering, Inc.
Mr. Lawrence Bettencourt, First Selectman 4853 Cordell Aven., Suite A-1 Tcwn of Waterferd Bethesda, MD 20014 Hall of Records - 200 Besten Post Road Waterford, Connecticut 06385
~
Northeast Nuclear Energy Cccpany ATTN: Superi ntendent Millstone Plant Ccnnecticut Energy Agency Pes Office Sox 128 ATTN: Assistant Director, Research Waterfcrd, Connecticut 06385 and ?olicy Develcpment Department of Planning and Energ/
Waterfcrd Pubite Library Policy Rope Ferry Road, Route 156 20 Grand Street Waterford, Connecticut 06385 Hartford, CT 06106 Director, Criteria and Standards Division Office of Radiatien Programs (ANR-460)
U.S. Envircnmental Protection Agency Washington, D. C.
20460 U. S. Envi ronmental F ratection Agnecy Regien I Office ATTN: EIS COORDINATOR John F. Kennedy Federal Building 3esten, Massachusetts 02203 Northeast Utilities Service Corpany ATTN:
Mr. James R. Himmelwright
- Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 l
_