Forwards IE Insp Rept 50-213/80-23 on 801108-1215.No Noncompliance Noted
ML19345G617
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/09/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19345G618 List:
References
NUDOCS 8104070623
Download: ML19345G617 (2)


See also: IR 05000213/1980023

Text

f;s,

..

s

tg

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

o

$

E

REGION I

9

U[

g

631 PARK AVENUE

%

o

KING oF PRUSSIA. PENNSYLVANIA 19406

++***

0

1981

Docket No. 50-213

'

, \\ ,e '

-

.i

(pol

D

8LQU)[jr} $

Connecticut Yankee Atomic Power Company

p

-

'9

ATTN: Mr. W. G. Counsil

-

Vice President - Nuclear

O APR 011981

-

_

Engineering and Operations

E

E8 g *u m en j

P. O. Box 270

A

Hartford, Connecticut 06101

g

p

Gentlemen.

4

%

Subject:

Inspection 50-213/80-23

This refers to the routine inspection conducted by T. H. Smith of this office on

. November 8 - December 15, 1980 of activities authorized by NRC License No. OPR-

61 at the Haddam Neck Plant, Haddam, Connecticut and to the discussions of our

findings held by Mr. Smith with Mr. R. H. Graves of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is er. closed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncomplianca were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincer.ly,

'

.

- - - - - - -

Edn

. Brunner, Chief

Redctor Operations and Nuclear

Support Branch

k

8104070623

.

..

. --. .-

.

-

. .._ -

-_. - -.- . ._.

.

.

.

- .-

FEB 9

1981

.

Connecticut Yankee Atomic Power Company 2

,

Enclosure: Office of Inspection and Enforcement Inspection

,

Report Number 50-213/80-23

cc w/ enc 1:

'

R.~ Graves,-Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

i.

i -

4:

.

f

j'.

,

4

4

e

'

,

+

'

1

e

  • E, e,y--,

..e,

- ,

.,me,

p,'

e

=~

s,

, , -

- - -

=-%e-c,--,=-.,.,w

e

-#.gy,e-,

,.

m.,

y..,-s,e

, , , , ,

2g,-cy.+p

T

T

Tw"~#P-**'****