ML19345G569

From kanterella
Jump to navigation Jump to search
Requests IE Reviews of Salem I Alert,Beaver Valley Incident & Rancho Seco 810317 Incident.Events Are More Valid Predictors of Control Room Personnel Performance than Planned Drills
ML19345G569
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/18/1981
From: Aamodt M
AFFILIATION NOT ASSIGNED
To: Gray J
NRC
Shared Package
ML19345G563 List:
References
NUDOCS 8104070540
Download: ML19345G569 (1)


Text

.

DG C;CT :40,.::53 O

PROD. & UTIL F/," $b 'a rereue %

E. D. 5, 3cx 428 Coatesville, 1-ennsylvania 19320

f. arch 18, 19El N

Av kr. Joseph Gray, Isquire 9,

(7,

1:uclear Regulatory Conmission to:ETE k y

'*ashington, D. C. 20555 g.

w:n s

7 ;gst

  • E 7

c.r.. :f ?.s ten.M k 9

Lear hr. Gray, dE:d;*.,$J."" p-CS A ' I "#s s Request is hereby =ade to obtain I &I Reviews of the Salem.I " Alert" as per newspaper clipping, 3/15/31, the leaver Valley incident referred to ty Er. Lornsife during the hearing 3/17/61 and the incident at Rancho Seco, 3/17/51 where, according to UlI, 60 people were evacuated fran the reactor building.

I hope you will realize that as a scientist I.am not trying to stack the evidence, but as interested in all i.hree events -- and any ot.mrs not known to :::e -- as more valid

^

predictors 'of the perforsance of control roca personnel than is afforded'by' planned drills.-

Sincerely,

[

e&

's 810 4 07 0 5 4'O ~

.-