ML19345G565

From kanterella
Jump to navigation Jump to search
Forwards LER 81-017/03L-0.Detailed Event Analysis Encl
Date released: 12/25/2019 Download: ML19345G565


LER 81-017/03L-0:on 810304,during Testing,Discovered That Containment Isolation Valve CFV-16 Would Not Move from mid-position.Caused by Valve Binding on Bushing Due to Insufficient Lubrication
ML19345G568
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/02/1981
From:
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19345G568 (1)
Forwards LER 81-017/03L-0.Detailed Event Analysis Encl
ML19345G564
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/02/1981
From: Baynard P
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19345G564 (2)