ML19345G385

From kanterella
Jump to navigation Jump to search
Lists Anticipated Items for Consideration During ACRS 249th Meeting on 810108-10
ML19345G385
Person / Time
Issue date: 11/26/1980
From: Fraley R
Advisory Committee on Reactor Safeguards
To:
Advisory Committee on Reactor Safeguards
Shared Package
ML19345G379 List:
References
ACRS-1804, NUDOCS 8104070134
Download: ML19345G385 (2)


Text

/b D'o, UNITED STATES NUCLEAR REGULATORY COMMISSION

,P,"

g ADVISORY '.,OMMITTEE ON REACTOR SAFEGUARDS f

wAssmnon. o. c. 2osss YYDEC DISC VI: B1-2 4

.'+,*****/

November 26, 1980

~

PEMORANDUM FOR: ACRS Members ACRS Staff ACRS Fellows FROM:

R. F. Fraley cu ive Di ector, ACRS ACRS FUTURE SCHEDULE - ANTICIPATED ITEMS FOR ACRS

SUBJECT:

8-10,198l

. CONSIDERATION, 249TH ACRS MEETING, JANUARY 1he following have been identified as items for ACRS consideration during the 249th fuli Comittee meeting.

1.

ACRS Action ACRS Annual Report to Conoress on the NRC Safety Research Pro-gram for F Y 19d2 (CPS /SD et al. ) - initial reading of proposed Committee report.

Clarification of ACRS Recort on ATWS (WK/PAB) - Tentative - if rio~t completed during 248th ACRS meeting.

Seoucyah Nuclear Plant - Proposed hydrogen control system (JCM/RS) including report cf Class 9 Accidents Subcommittee (WK/GRQ) on hydrogen control methods in nuclear plants.

. ACRS comments on proposed NRC rulemaking re acclication of TMI-2 Lessons Learned to Near Term Construction Permits and Manufac-turing Licenses (D0/RS) - (tentative - depending on ava11aDility of related documents) - see Attachment 1.

ACRS comments on definition of and criteria regarding " Plant Fea-tures Important to Safety" - (not

'gned) - ACRS comments re-

  • Attachment 2.

u quested by DSI/NRR (L. Rabenstein, vstem failures which ACRS coceents re NRC Position on con.

i anticipated request from affect plant safety (not assigned) - y NRC/ Chairman, House Committee on Interiur and Insular Affairs

" (tentative) - see Attachment 3.

2.

Reports of ACRS Subcommittees Report by B&W Subcommittee regarding Crystal River Nuclear Plant incident of 2/26/80 (JJR/JCM/GY)

Regulatory Activities - Report regarding proposed changes in Regu-i latory Guides and other NRC activities (CPS /SD)

.. p i

8164070l%

3.

Miscellaneous _

Meeting with NRC Chairman and other Commissioners regarding issues i'uch as:

status / rate of recovery of TMI-2 Report from DOE regarding application of TMI-2 Lessons Learned to DOE facilities (J. Crawford Task Force)

Status report hy MRC Staff regarding review of NRC~ regu-lations and operating nuclear plants per Section 110 of the 1980 NRC Authorization Bill (Bingham Amendment) (tenta-tive. depending on staff progress) - see W. J. Dircks memo to R. Fraley dtd.11/7/80 - Attachment 4 Briefing by NRC Staff regarding proposed NRC Enforcement Policy (tentative) - see R. F. Fraley memo to ACRS members dtd 11/24/80 - Attachment 5 Briefing by NRC Staff regarding detailed study of seismic capability of auxiliary feedwater systems - see memo from H. R. Denton to Chairman Ahearne dtd. 8/27/80 - Attach-ment 6 Attachments:

NRC Notice of Proposed Rulemaking on TMI-1.

related requirements for nuclear power plant construction permits 2.

Fraley memo 11/20/80 to Members "Defini-tion of Plant Features 'Important to Safety'"

l 3.

Libarkin memo 11/25/80 " Safety Implica-tions of Control System Failures" l

Dircks memo 11/7/80 " Staff's Preliminary 4.

Plans for Addressing the Requirements in Section 110 of the FY-80 NRC Authorization l

Bill" 5.

Fraley memo 11/24/80 NRC Proposed Enforce-memt Policy l

6.

Denton memo 8/27/80 " Responses To Three-ACRS Letters" l

l l

t Y

__