- .d 4
s.a.: ome.. 2im w.. u en.e.n A.au.. secm.on. u.cneg.n.e2oi. 4,.. coa. ei,7...o3,3 December b, 1975 Mr. James G. Keppler US Nuclear Regulatory Cocsission T99 Roosevelt Road Glen Ellyn, IL 60137 DOCKER 50-155 AND DOCKET 50-255 BIG ROCK POINT AND PALISADES PLANTS By letter dated Nove=ber 3, 1975, you transmitted IE Bulletin No 75-Ok8 which requested information regarding fire protection inspections made at our licensed operating plants. This letter is written to provide the re-quested infor=ation.
Consumers Power Cc=pany has received reports for one inspection perfors;d at each facility since March 22, 1975 Copies of these reports for the Big Rock Point and Palisades Plants are attached. In addition, ve have annotated in the " status" colu=n of the portion of the report titled " Log of Current Recocsendations" a description of actions taken or planned with respect to the individual reco==endations. A separate copy of each of the
" Log of Current Reco==endations," c.nnotated as described above, is attached for each plant.
Ralph B. Sewell Nuclear Licensir.g Administrator CC:
File 4/03060M
(
u a w pro euon con hani.
l l.
NUCLEAR MUTUAL LIMITED PROPERTY LOSS PREVENTION REPORT PERIODIC REPORT MAY 6-7, 1975 CONSUMERS POWER COMPANY BIG ROCK POINT NUCLEAR TOWER PLANT ON LAKE MICHICAN NEAR CHARLEVOIX, MICHICAN CONFERRED WITH:
R.E. Berry, General Property Protection Consultant C. Hartmann, Plant Superintendent INSPECTED BY:
J. A. Robinson DATE INSPECTED: May 6-7, 1975 This report utilizes the Original Report of November 11, 1972 (revised July 8, 1974) as the basic reference report.
This report contains only those items peratining to changes in conditions such as housekeeping. The areas concerning administrative control and areas concerning design and' construction of the permanent plant are contained in the Original Report (as. revised).
CENERAL:
The new Guard House Buil' ding, located at the fence line, east of the Office Building has been provided and is essentially a 12'x.20' metal clad combustible trailer.
l The former Information Center has been remodeled and is now occupied with l
Offices.
\\
~
l FIRE PROTECTION:
The 1,000 GPM @ 110 PSIC electric motor driven and diesel engine driven fire pumps were satisfactorily capacity tested at this inspection.
Two inch drain and alarm tests were conducted at this inspection with satisfact-ory results.
A
[
Several heat actuating devices, controlling the open head deluge systens, l
protecting the Transformers were automatic 11y actuated with satisfactory results.
F
(
M & M Prosecuan Coneuhanie CONSUMERS P0i/ER COMPANY BIG ROCK POINT NUCLEAR POWER PLANT
~(
ON LAKE MICHICAN NEAR CllARLEVOIX, MICHICAN Loop underground fire main flow tests were also conducted at this inspection with satisfactory results.
An exit interview was held with Mr. C. Hartmann, Plant Superintendent and all recommendations were reviewed at this time.
Recommendation Numbers 1, 2, and 3 have been complied with and have been removed from this report.
RECOMMENDATIONS The following recommendations are listed in accordance with NML Standards.
Noncompliance may result in insurance rating penalties.
4.
Periodically flush and itzbricate all fire hydrants.
(NML Standard V. A.6., Page 15.)
5 '. Annually test all heat sensors provided for the automatic actuation of the transformer deluge systems and maintain records _for review.
(NML Standard V.A.6., Page 15.)
6.
Remove all combustibles from Room 441 which' expose the vertical cable runs.
(NML Standard V. A.5.,
Page 15.)
I.
M & M hecuan Coneuhonu 4
s CONSUMERS POWER COMPANY
(
BIG ROCK POINT NUCLEAR POWER PLANT ON LAKE MICHICAN NEAR CHARLEVOIX, MICllICAN LOC OF COMPLETED AND/OR WITHDRAWN RECOMMENDATIONS The following recom=endations are listed for consideration in accordance with NML Standards. Noncompliance may result in insurance rating penalties:
RECOMMENDATION BRIEF STATUS R-2, Page D2.
Remove all combustible waste Completed.
from the Reactor Building.
0-1, Page D4.
Provide a 1-hour barrier between Completed.
the Control Room and the hallway by protecting the windows and doors with fire doors.
w e
e P
9 e
9
-3 ~
- )*
k M & M Protection Coneuhonu 4
CONSUMERS POWER COMPANY BIC ROCK POINT NUCLEAR POWEB PLANT Oh LAKE MICHICAN
(
NEAR CHARLEVOIX, MICHICAN LOC OF CURRENT RECOFMENDATIONS The following recommendations are listed for consideration in accordance with NML Standards.
Noncompliance may result in insurance rating penalties:
RECOMMENDATION BRIEF-STATUS F-1, Page B2.
Raise the static pressure on the underground mains to enable higher starting pressures for the electical motor and diesel driven fire pumps.
F-2, Page B2.
Periodically flush and lubricate all fire hydrants.
T-1, Page C3.
Provide Class A self-closing fire doors for the openings in the wall between the Turbine Building and the Office Control Building.
T-2, Page C4.
Provide bearing protection for the turbo-generator.
T-3, Page C4.
Provide a two hour rated fire barrier between the Turbine Building and the oil filled electrical equipment.
T-4, Page C4.
Move the ' combustible house trailer a minimum of 30 feet from the Turbine Building.
E-1. Page D2.
- -a**da
=a
- "*a--**-
fire detection system with alarms for the cable areas.
0-2, Page D5.
Seal cable penetration in the walls and floors of the Control Areas.
0-3, Page DS.
Protect all openings in the wall between the Turbine Building and Office Control Building with self-closing Class A fire
~
1 doors.
0-4, Page DS.
Provide an automatic fire detection system with alarms to the Control Room for cable penetration areas.
e 0-5, Page DS.
Provide approved smoke and heat venting.
e
_i_
i M $ M Protection Coneuhante CONSUMERS POWER COMPANY BIG ROCK POINT NUCLEAR POWER PLANT g
NEAR CilARLEVOIX, MICHICAN LOG OF CURRENT RECOMMENDATIO_NS RECO!O'.ENDATIONS BRIEF STATUS e
W-1, Page D7.
Provide automatic fixed water
' extinguishing systems for the two Warehouses.
5-1, Page D9.
Provide an automatic, fixed water, gas or chemical extinguishing system for the emergency diesel generators.
TS-2, Page D10.
Install one hour rated fire barriers between major groups of oil filled electrical equipment in the Switch-yard.
TS-3, Page D10.
Annually test all heat actuating devices provided in conjunction with the transformer auto =atic deluge systems..
l i
(
-2.
t
+
M & M Proe.cson Coneuhanie a
-(
NUCLEAR HUTUAL LIMITED PROPERTY LOSS PREVENTION REPORT PERIODIC REPORT MAY 7-8, 1975
^
~
CONSUMERS POWER COMPANY PALISADES NUCLEAR POWER STATION FIVE MILES SOUTH OF SOUTH HAVEN NEW COVERT TOWNSHIP, MICHIGAN CONFERRED WITH:
J. Lewis, Plant Superintendent R. Berry, General Property Protection Consultant INSPECTED BY:
J. A. Robinson DATE INSPECTED: May 7-8, 1975 This report utilizes the Original Report of Nove=ber 14th and November 16th 1972 (revised December 17, 1973), June 17-18, 1974 and May 7-8, 1975 as the basic reference report. This report contains only those items pertaining to changes in conditions such as housekeeping. The areas concerning administra-tive control and areas concerning design and construction of the permanent plant are contained in the Original Report (as revised).
CENERAL:
This plant is now on line with the present output being 500 MW.
The temporary building, housing the Electric and Pipe Warehouse, located at the northwest portion of the plant has been razed.
The Turbine Building structural framing is being reinforced to a 185 ton loading capacity.
The plant security system is being up-graded; the addition of fence vibration alarms and magentic door entry cards.
An exit interview was held with Mr. J. Lewis, Plant Superintendent with all recommendations discussed.
FIRE PROTECTION:
Two inch drain and water flow alarm tests were performed satisfactorily at this inspection.
(
, Satisfactory water flow tests were conducted at Cooling Tower No. 2 with the following results:
Loop Test - Static 154 psig, Residual 122 psig, Flowing 1445 gpm.
t M & M Proe.ction Coneuhonu M
I CONSUMERS POWER COMPANY PALISADES NUCLEAR POWER STATION FIVE MILES SOUTH OF SOUTH HAVEN NEW COVERT TOWNSHIP, MICHICAN South leg of loop in service - Static 154 psig, Residual 120 psig.
Flowing 1434 gpa.
Fire protection equipment inspection and testing records were reviewed and found to be complete.
A copy of the written Fire Brigade Training Procedures was not available for review at this inspection.
REMARKS Shall Reco=cendation No. 2, referring to the implementation of the Welding and Cutting Procedures, has been complied with and has been removed from this report.
Maintenance and housekeeping Recommendations Nos.1, 2, 3, and 4 have been complied with and have been removed from this report.
RECOMMENDATIONS The following recoc=endations are listed for consideration in accordance with NML standards.
Noncompliance may result in insurahce rating penalties.
l.
(Revised May 7, 1975). The new diesel driven fire pump (presently rated at 1500 gpm at 140 psig, based on the existing pump performance curve) should be provided with a name plate from the pump manufacturer as to its rated I
capacity and head with adequate substantiation, so that the pump may be rejected or possibly accepted in light of new conclusive evidence.
(The pump has been tested on several occasions and is presently not acceptable to NN1.)
6.
Provide the inspector's test connection and water flow alarm for the Storeroom automatic sprinkler system.
(NHL standard V.A.6., Page 15.)
7.
Remove the 110 gallons of acetone and all combustibles from the Resin Building.
l (
l
~
M & M Preecean C
)
(
CONSUMERS POWER COMPANY PALISADES NUCLEAR POWER STATION FIVE NILES SOUTH OF SOtTIll HAVEN NEW COVERT TOWNSHIP, MICHICAN 8.
Remove all combustibles from the. main steam line, Hezzanine.
(NML Standard V.A.5., Page 15.)
9 Seal all openings in the Diesel Generator RoorIn to full wall thickness with noncombustible material. (NML Standard V.C.
4.b., Page 16) 10.
Remove the styrofoam spacer block's used at the ceiling in Room 500.
(NHL Standard V.C.l(a)., Page 15.)
11.
Remove all combustibles from the second floor Telephone Equip-ment Room and post "NO SMOKING" signs.
(NML Standard V.A.S.,
Page 15.)
12.
Provide a maintenance and testing procedure for the testing of the pneueatic detection system, controlling the Cooling Tower deluge system.
(NHL Standard V. A.6., Page 15.)
- 13. Provide a maintenance and testing program for the valve ta:per switches at Cooling Tower Deluge Houses.
(A tamper s' witch was tested at this inspection, but failed to respond.)
(NFL Standard V.A.6., Page 15.)
14.
Provide a copy of the written Fire Brigade Training Procedure which may be reviewed by the NML Inspector at the next inspection.
(NML Standard V.A. (1). (b)., Page 14.)
e t
3
r l
e M & M Prosecuan Coneuhones o
(
CONSUllERS POWER COMPANY PAT ISADES !!UCLENt POWER PLANT (REVISED HAY 7-U, 1975)
LOG OF COMPLETED AND/OR 5?ITHDRAMJ RECOMMEND!sTIONS The following recommendations are listed for consideration in accordance with Intl Standarda. Noncompliance may eccult in incurance rating pennities.
RECOMMENDATIONS BRIEF ST/.TUS C-1, Page A2.
Expedite the removal of ec:chuctible Completed.
construction material throughout the site.
T-5, Page D4.
Remove the lucher stored next to the Completed.
hydrogen seal oil unit.
e a
e e
e 1
.~
(
M & M Prosecuan Coneuhonts i
CONSUMERS PO'.T.R C01!PA:n*
PALISADCS NUCLEAR P0h'ER PLANT (REVISED MAY 7-8, 1975)
LOG OF CU.*tRENT RECO!!!ENDATIONS Tiic following recommendations are listed for consideration in accordaccc with N!iL Standards. Noncompliance taay resul.t in incurance rating penaltics:
RECOMMENDATIO"S BRIEF STATUS F-1, Page C2.
Provide adequate documentation as to the capacity and head of the new diesel driven fire pump.
T-1, Page D4.
Provide bearing protection for the turbo-generator.
T-2, Page D4.
Provide an approved fire stop for the 10'x 10' opening through the fire barrier between the auxiliary Building and the Turbine lding.
~
T-3, Page D4.
Improve the drainage and oil confine-ment arrangement to prevent the flow of oil and water to unprotected areas or provide automatic water spray pro-tection for the Condenscr Pit.
T-4, Page D4.
Locate and remove the flow device from the sprinkler piping for the Main Turbine Oil Room.
T-6, Page D4.
Install a fire step for the pipe opening between Boiler Room #124 and Machine Shop Room #127.
T-7, Page D4.
Provide a 3-hour rated barrier for the feed water pumps.
R-1, Page D6.
Provide automatic protection to protect the main coolant pump lubricating sys-tem.
~
A-1, Page D8.
Provide U.L. listed smoke detection in the equipment located in the Control Room area'.
A-2, Page DS.
Provide automatic protection for com-g bustible storage in area ST1.
A-3, Page D9.
Provide notomatic protection or remove combustibic storage from Resin Warehouse. -
~
(,
M & M Preecten Comeuhante r
CONSUt!ERS PO'JER C0;:PANY PALISADES NUCI. EAR POUER PLANT (REVISED MAY 7-8, 1975)
I LOG OF CURRENT PICO>CiENDATIONS RECOM5!INDATION ERIEF STATUS A-4, Page D9.
Provide cicar space,betueen com-bustible house trailcr structure and Auxiliary Building.
A-5, Page D9.
Provide automatic protection for trach lay down arca in Auxiliary Building or remove combustible waste storage.
A-6, Page D9.
Provide, cut off protection for openings in the fire valls in the Auxiliary Building which are not properly cut off.
A-7, Page D10.
Seal all cable penetrations in the walls and floors of the contr.l areas.
A-8, Page D10.
Provide an automatic fixed extinguishing system for the charcoal filters.
W-1, Page D14.
Provide plans and specifications for the automatic sprinkler system installed in the Storeroom Building.
^
C-1, Page D16.
Provide automatic protection for the plywood fan deck.
C-2, Page D16.
Provide fire separation or draf t curtains between each two cells to protect the enclosed distribution basis areas next to the Cooling Tower.
l C-3, Page D16.
Provide a second feed line from the main fire loop to the Cooling Tower loop..
CT-1, Page D17.
Provide Class B fire doors or shutters for openings in the Turbine Building.
i CT-2, Page D17.
Provide 1-hour rated fire barriers to separate transformers less than 30 feet spart.
I l.
3-
o
\\,
CONSUMERS POWER COMPMN BIG ROCK POINT NUCLEAR POWER PLANT ON LAKE MICHIGAN
(
NEAR CHARLEVOIX, MICHICAN IAC OF CURRENT RECOMMENDATIONS The following recommendations are listed for consideration in accordance with NHL Standards. Noncompliance may result in insurance rating penalties:
RECOMMENDATION BRIEF STATUS F-1. Page B2.
Raise the static pressure on the Completed underground mains to enable higher starting pressures for the electical motor and diesel driven fire pumps.
Maintenance Schedule F-2, Page B2.
Periodically flush and lubricate has been established all fire hydrants.
T-1, Page C3.
Provide Class A self-closing fire Not to be done doors for the openings in the wall between the Turbine Building and the Office Control Building.
T-2, Page C4.
Provide bearing protection for the Not to be done turbo-generator.
T-3, Page C4.
Provide a two hour rated fire barrier Not to be done between the Turbine Building and the oil filled electrical equipment.
Move the 'ombustible house trailer Completed T-4, Page C4.
c a minimum of 30 feet from the Turbine Building.
R-li Page D2.
- "id-
- a
- "*a--+4a
'4-c detcetion Completion by l
system with ' alarms for the cable 1/1/76 areas.
0-2, Page DS.
Seal cable penetration in the walls Completion planned and floors of the Control Areas.
during next plant l
outage 0-3, Page DS.
Protect all openings in the wall between Not to be done the Turbine Building and Office Control Building with self-closing Class A fire 1
doors.
t 0-4, Page DS.
Provide an automatic fire detection Completion by system with alarms to the Control Room 1/4/76 for cable penetration areas.
'I 0-5, Page DS.
Provide approved smoke and heat venting. Engineering study being made l
l *
\\.
l i
CONSUMERS POWER COMPANY BIG ROCK POINT NUCLEAR POWER PLANT NEAR CHARLEVOIX, MICHIGAN LOG OF CURRENT RECOMMENDATIONS RECOMMENDATIONS BRIEF STATUS W-1 Page D7.
Provide automatic fixed water Not to te done
' extinguishing systems for the two Warehouses.
5-1, Page D9.
Provide an automatic, fixed water, Not to be done gas or chemical extinguishing system for the emergency diesel generators.
TS-2, Page D10.
Install one hour rated fire barriers
. Not to be done between major groups of oil filled
~
electrical equipment in the Switch-yard.
TS-3, Page DlO.
Annually test all heat actuating Maintenance schet.:le devices provided in conjunction has been established with the transformer auto =atic deluge systems.
e l
t l
-2.
l l
4 1
6 CONSUMERS POWER COMPANY
(
BIC ROCK POINT NUCLEAR POWER PLANT ON LAKE MICllICAN NEAR CHARLEVOIX, MICHICAN LOC OF COMPLETED AND/OR WITHDRAWN RECOMMENDATIONS The following recommendations are listed for consideration in accord.ance with NHL Standards. Noncompliance may result in insurance rating penalties:
RECOMENDATION BRIEF STATUS l
R-2, Page D2.
Remove all combustible waste Completed.
from the Reactor Building.
0-1, Page D4.
Provide a 1-hour barrier between Completed.
the control Room and the hallway by protecting the windows and
. doors with fire doors.
t l
I
{
O F
t i
3.-
_ _ _ ~
1, i
CONSirMERS POWER COMPANY
(
PALISADES NUCLEAR POWER Pl.Al3T (I6 VISED MAY 7-8, 1975)
LOG OF CURRENT RELO WENDATIONS The fol?Mwing recommendations are lirted for consideration in accordance with NMs. Standards.
Noncoapliance may result in insurance rating penalties:
17,tXMt.ftND/,TIONS BRIEF STATUS F-1, Page C2.
Provid6 adequate documentation as Completion by to the capacity and head of the new 12/1/75 diesel driven fire pump.
T-3, Page D4.
Provide bearing protection for the Not to be done turbo-generator.
T-2, Page D4.
Provide an approved fire stop for Completed the 10'x 10' opening through the fire barrier between the Auxiliary Euilding and the Turbine Building.
T-3, Page D4.
I= prove the drainage and oil confine-Engineering study ment arrangement to prevent the flow being made of oil and water to unprotected areas or provide automatic water spray pro-tection for the Condensor Pit.
T-4, Page D4.
Locate and remove the flow device from Completion by the sprinkler piping for the Main 12/1/75 Turbine Oil Room.
T-6, Page D4.
Install a fire stop for the pipe Completion by opening between Boiler Room #124 and 12[l/75 Machine Shop Room #127.
T-7 Page D4.
Provide a 3-hour rated barrier for Not to be done the feed water pumps.
R-1, Page D6.
Provide nutematic protection to protect Not to be done the main coolant pump lubricating sys-tem.
A-3, Page D8.
Provide U.L. listed smoke detection in Not to be done the equipment located in the Control Room area.
A-2, Pene Db.
Provide automatic protection for com-Engineering study bustible storage in area CTi.
being made A-3, Page D9.
Provid t-.iuroustic protection or remove Completed combustible storage from Kesin Warehoase. *
..e,.
i
)
i 1
CONSU!ERS POWER COMTANY PALISADES NUCLEA!! POWl:R PLANT (REVISED HAY 7-8, 1975)
LOC OF CURRENT RECOMMENDATIONS RECOMMENDATION BRIEF STATUS A-4, Page D9.
Provide clear space between com-Completed bustible house trailer structure and Auxiliary Building.
A-5, Page D9.
Provide automatic protection for track Completed lay down area in Auxiliary Building or remove combustible waste storage.
A-6, Pcge D9.
Provide cut off protection for openingo Completion by in the fire walls in the Auxiliary 12/1/75 Building which are not properly cut off.
A-7, Page D10.
Seal all cable penetrations in the walls Campletion by and floors of the control areas.
12/1/75 A-8, Page D10.
Provide an automatic fixed extinguishing Engineering Study system for the charcoal filters, being made W-1, Page D14.
Provide plans and specifications for the Completion by automatic sprinkler system installed in 12/1/75 the Storeroom Building.
C-1, Page D16.
Provide automatic protection for the Not to be done plywood fan deck.
C-2, Page D16.
Provide fire separation or draft curtains Engineering Study between each two cells to protect the being made enclosed distribution basis areas next to the Cooling Tower.
C-3, Page D16.
Provide a second feed line from the main Not to be done fire loop to the Cooling Tower loop.
CT-1, Page D17.
Provide Class B fire doors or shutters for Not to be done openings in the Turbine Building.
CT-2, Page D17.
Provide 1-hour rated fire barriers to Not to be done separate transformers less than 30 feet apart.
i
~
.\\_
i CONSUMERS POWER COMPANY
{
PALISADES NUCLEAR POWER PLANT (REVISFD MAY 7-8, 1975)
LOC OF CO?Pl.ETED AND/OR WITilDRAWN RECO}NE:IDATIONS The following recom:nendations are listed for considerction in accordance with NE Standa ds.
Noncocipliance may result in insurance rating penalties.
RECTMNDATIONS RKII'F STATUS G-1. Page A2.
Expedite the renoval of combustible Completed.
construction material throughout the site.
T-5, Page D4.
Remove the lumber stored next to the Completed.
hydrogen seal oil unit.
4
+
9
I l
Form F R D4 9)18 71s F RD4W E:80
' - =w-CEMO ROUTE SLIP 5** ~ a w ""*-
'*---*a**
nei saa rewa Fw ve-oven Fw sa*.,-c%
1 70 (N.m..no v ats mana6s man.eas a
IE Chief, FSOB Constr crs Power Cor pany IE Chief, FC6EB IE:HQ(4)
Big Pack Point and Palisades Plant Licensing (4) o et a--t rstc necke r *:m. sn_155 r,4 Sn 7ss g
To (u.
e.am annas asm.no J. Rizzo, OMIPC A/D for Info. Processing Region I l
Region 11 I
pm, to (w......am sanna
---=
Local PDR R. Callen M. Cherry i;
rno u cm...
4.a.o G. Fiorelli Attached is a copy of licensee's repiv dated Dece=ber 4, e
IE:III I
1975. to IE Eulle tin 75-0!.3.
was so, can 12/09/75
. e
.a,o.
no
-o o,..,.,..
I I
i e
i i
s A
7
., /-
/
o
,s' W 9
_