,(pa nua
. 'EM ATE lCTIC'i LETTER-7/C
_o, UNITED STATES GI2-81-03 y gg j NUCt. EAR REGULATORY COMMISSION nEcton v 8
- g[p y ~ [c UM N, CALIFORNIA DOULEVARD E,
[
OUITE 2^2. WALNUT CREEK PLAZA
.qP g
4
,h
- e,e*
WALNUT CNEEK. CALIFORNIA 54599 J
IL. h U
FEB02 M 1 +1 4Np t.. wa ~ M F )
Jw 2
~
m Washincton Public Pcuer Su:aly System 47
./
la d, ' shincten 99352
.9 Ch
-. - g :::;9g-
- ...n uy %, cg; d Attention:
R. G. Mitlock OI M @$ ~\\;1 5 %
p Fregrca Director, WNP-2 Froject.
Gentlemen:
5
o I
hA b. '
Subj ect: Washincton Nuclear Proiect No. 2. Sacrificial Shield 'kW '
Girth wela Joint Installatien by tne Mechanical Contractor We have comoleted our review of tte infcmation you proviced pursuant to cur letters of hovec::er 21, 1979 and July 18, 1950, concerning tne Sacrificial Shield Wall (SSW) girth weid joint to be installed by the WNP-2 mechanical centracter. The structurai, metailurgical, and weieing aspects of the proposed ccrrective welo have oeen founo to be acceptacle to the NRC as described in Mr. Tedesco's ietter to you of Novencer 20, 1950.
Moreover, the information you proviced in your response of Decemoer i,1920, ccncerning the flamability resistance of the shielding materiai, has oeen reviewed and founc to be acceptable.
On the matter concerning the perfomance of your work by the techanical centractor, our :.cservation at the site ano evaluation of the final-round infomatica you provided cur Resident Inspector on January 14, 1981, concerning the results cf your reevaitaticn of this contractor's work control, quality assurance systems, and associated ccrrective action plan for installation of girth weid joint, indicate that there is reasonable assurance the work will be cccpleted satisfactorily. Therefore,.your ccmitment described in our lettars of Scvember 21, 1979 and July 18, 1930, have been met with respect to the SSW girth weld joint.
As understood during the meeting between you and Mr. G. S. Spencer of this office cn January 20, 1981, except' for installation of the SSW girth weld joint, your stop work directive en the cechanical contractor will remain in effect until the NRC has further examined the results of your reevaluation of this centracter's work methods for subsequent installation activities.
This continuing cemitment results frem cur concern about this contractor's ability to provide suitable work methods as discussed in the documents referenced in the attached enclosure.
We note that the reviews by WPPSS of the centractor's work cethods preposed for the aforementioned girth weld, identified substantive weaknesses in these methods which required attention before the work could IF"EDI"TE ACTIO*4 LETTER A
8102190 731
R. G. t'atic:k
_g.
preceed.
These included weaknet:cs in the contractor qualifications of the welding precedure and centrol of sub-contractor activity.
Consequently, it is understocd that, until further notice frc9 the fiRC, WPPSS will continue the reevaluation b; the ir.decendent review te3m of this contractor's proposed work methods and asscciatad cerractive actions for all subsequent installation acti vi ti es.
If our underst3rding of your planned actinn is not as described as above, please contact this office immediately.
--,-m% c_C.
- - v R. H. E'naelken Direc+cr Enclosure a/
)
Ltr frca R. H. Engelken, NRC, to M. O. Strand of Nov. 21, 1979, Subj :
Stoo Work, Repair ar.d Attachments to the SSW, WNP-2 Ltr frcm D. L. Renhercer, NPPSS, to R. H. Engelken dtd Dec. 10, 1979.
Ltr frca D. L. Renberger, WPPSS, to R. H. Engelken, dtd February 1,1980.
Ltr from R. H. Engelken to N. Strand, dtd February 8,1980.
Ltr from V. Stello, NRC. to N. Strand, dtd June 17, 1980, Subj:
10CFR50.5af fi Raccest Regarding Quality Assurance Ltr from N. Strar.d, WPPSS, to V. Stello, dtd July 17, 1980.
Ltr frem V. Stello to R. L. Ferguson, dtd September 17, 1980.
Ltr. frcm R. H. Engelken to N. Strand, dtd July 18, 1980.
Ltr frca D. L. Renbercer to B. J. Youncblood, dtd Aug. 19, 1980, Subj:
Engineering Evaluation of tne Sacrificial Shield Wall Ltr from R. L. Ferguson, to R. H. Engeiken, dtd October 16, 1980.
Ltr from R. G. Maticck to R. H. Engelken, otd Nov. 12, 1980.
Ltr frca G. D. Boucney to R. L. Tedesco, and December 1,1980, Suoj:
Fiammaoiiity Resistance of SSW Snield Material.
Memcrancun iro;a R. G. "atiock to G. S. Spencer, dtd Nov. 21, 1980, enclosing WBG organizational chart datec Nov. 17, 1980 and WNP-2 Project preliminary ceganiza tion chart ca ted Hov. 5,1980.
Ltr from R. G. F.aticcx co a. H. Engeiken, dtd December 30, 1980.
OIE Inspection neport nos.:
50-397, 80-04 Res:aent Insp;ctor's reports frca July,1980.
.,.... - - - + -,, - -
- - -. - - -