ML19345F930

From kanterella
Jump to navigation Jump to search
Forwards LER 81-002/03L-0
Date released: 12/25/2019 Download: ML19345F930


LER 81-002/03L-0:on 810114 & 0212,reactor Protection Sys Logic relays,C71-K3D & K3E,did Not de-energize When MSIV 1-B21-F028B Was Closed.Caused by Sticking Valve Position Limit Switch Actuator Arm Cam.Switch Replaced
ML19345F934
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/12/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19345F934 (1)
Forwards LER 81-002/03L-0
ML19345F929
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/12/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19345F929 (1)