._ ..
. ..
-
-
-
-
-
,
1
-
.
.
/y arcq"'o
s
l
UNITED STATES
.
O i A)4.,q f,7,
!\\
NUCLEAR REGULATORY COMMISSION
.S
nec>o~ "
o,
101 MARIETTA ST., N.W.. SulTE 3100
ATLANTA, GEORGIA 30303
- %/
j
- * " '
- N
21981
,
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
l
Chattanooga, TN 37401
Gentlemen:
)
Subject:
Report No. 50-328/80-22
i
This refers to the routine inspection conducted by L. D. Zajac of this office on
November 17-20, 1980, of activities authorized by NRC Construction Permit No.
CPPR-73 for the Sequoyah facility. Our preliminary findings were discussed with
G. G. Stack at the conclusion of the inspection.
1
!
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
t
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
'
appear to violate NRC requirements.
This item and references to pertinent
i
requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your response are delineated in Appendix A.
j
We have examined actions you have taken with regard to previously identified
!
enforcement matters and unresolved items. The status of these items is discussed
I
in the enclosed report.
!
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
j
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC Public Document Room. If this report contains
r
!
any information that you believe to be proprieta ry, it is necessary that you
l
make a written application within 20 days to this office to withhold such infor-
mation from public disclosure. Any such application must include the basis for
claiming that the information is 1.roprietary and the proprietary information
should be contained in a separate part of the document. If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
M
l
C. E. Murphy, Chief
Reactor Construction and Engineering
l
Support Branch
.
O
t
.
2 ;3af
Tennessee Valley Authority
_2
Enclosures:
1.
Appetlix A, Notice of Violation
2.
Inspection Report No. 50-328/80-22
cc w/ encl:
G. G. Stack, Project Manager
J. M.
Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
l
!
l
l
l
l
l
l