Similar Documents at Hatch |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
. . - - . . .. ~. -~ . . . . . . . -. .~ .
I L
t J
l i
i OPEPATING DATA REP 0pi J l L - - -
DOCKET 110. 50-366 l DHTE j l
COMPLETED BY ' " '
O TELEPHONE (912) 367-7781 x 203 y
-Y .......................................................
C OPERAiriac STAlus
. Notes .
g@ * . j y 1. Unit tie n e n E.I. Hatch Nuclear Plant Unit 2 .
g 2. Repor t 6 ng Per 6 ods 01-61 .
- ~ -
l 3. L6 censed thernal Pouer (Mut ): 2436 .
! O 4. Haheptate fat 6ng (Cross MWe): 817.0 . .
O
- 5. Des 6gn Electrical Rat,ng (Het MWe): 784.0 - - -
l .
- 6. Maximun Dependable Capac6ty (Cros s MWe ): 2W5.7 .
...***.............+..................................,
- 7. Maxinun Dependable Capac6tg (Het MWe)t 770.9 If Changes occur in Capacity Rat ings (Items Hunber 3 Through 7) Since Lart Report, Give Reasonst l
- 8. .
J L 9. Power Level To Which Restrfcted, if Ang (Het MWe ll --
- 10. Reasons For Restr6ctions, if Anyt l
)
%. ~~
This Month Yr.-to-Date Cunulateve it. Hours In Reporting Per6cd 744 744 11953 '
0.0 0.0 8233.8
- 12. Hunber of Hours Reactor Was Cr6tical 4.0 0.0 0.0 y y 13. Reacter Reserve Shutdown Hours 0.0 0.0 7688.3
- 14. Hours Generator On-Line ~ * ~~ ~ " ~ ~
0.0
~
0.0 0.0
'15.'Un6L Res er ve Shutdown Hours 17097890 y ' 16 . Cross Thernal Energy Generated (MWH) . 0 0 J
- 17. Cross Electr6 cal Energy Generated ( MWH ) ~
' -3045 0 ~ '^ -3045 0 5667280
" '"5400454
~ ~ ~
- 18. Het Electr6 cal Energy Generated (MWH) '
y 19. Unit Service. Factor 0.0 0.0 64.3 J
- 20. Unit Availab616tg Factor 0.0 ^~
0.0 ~'
64.3 ^ '
- 21. Unit Capacity' Factor ( U s 6 ng MDC N et )" 10.5 -0.5 58.6 y 22. Unit Capacity Factor (Us6 ng DER Het) -0.5 -0.5 57.6 J
- 23. Unit Forced Outage Pate _0.0 0.0 11.8 '~
- 24. Shutdowns Scheduled Over Hext 6 Months ( Type. . Date, and Duration of . Each ):
t 3 L M 25. If Shut Doun At End Of Report Period. Estinated Date of Startupt
- 26. Units in Test Status (Pr6or to Connercial Operation >s Forecast Achieved j
' ' ~ ~ ' ' ~ ~ ~ ' ' ~ ~ ~ ~ ~ ~ ~ ~ ~
INITIAL CR!i!CALITY~ ~ '~ ..u...__.... ..
IHITIAL ELECTRICITY _ ~[' _ ............... ___............ J COMNERCIAL OPERATION , . _ ,. ( , ,
(9/77) p . ._. ..
~. . . .
J
. . . . . ,...~ ..._..-.- -
j
-e. . ,
-. J gs'.u..h.
, t .M6a" .y .
s v*
( ,
e.v tli A G E D AI L Y UNIT POWEQ LEVEL g DOCKET HD. 5 0 - 3 4. t. I
,* On1E '
COMPLTit.D BY T EL E PHONE ( 912 ) 367-7701 x 203 g H 0 t4 T tt 01-91 OsY F'fRAGE DnILY FOUER LEVEL D(. Y AVERACE DRILY F0uER LEVEL (nue-Het) (HWe-Het>
I 1 -3 17 -5 ~
2 -3 18 -5 3 -3 19 -4 I g'
4 -4 20 -3 ,
~~
5 -3 21 -3 4 -4 22 -3 g g l 7 -3 - 23 -4 -'
8 -4 24 -4 l
, 9 -5 25 -5 I
~
to -5 26 -5 ' - ~
11 -5 27 -4 12 -4 28 -4 g g,
13 -4 29 -5 - ' - -
14 -4 ' 30 -4
-5 31 -4 g 15 16 -5 - - - . . - ~ -
@ i cc=s) . . . . . _ ___
I "dec?)
a R p' . _
v tr - .- . . . . _ . .
e * *
. WN 4*9'...
--Mhme..
s ,50-36f;
, DOCKEINO, ll!111' SilUIDOWNS AND POWER ltEI)UC110NS UNil N AME Ilat' h 7 DATE P-10-HI COMPLETED fly .l . M . Kamishlian
' REPORT MON 111.lanua ry 'IELEril0NE _21P-36 /-7781 q
c ci 4 L3 h%, 5 ), Cause & Corredhe
.E _t2 g g5y
,gm llCCH3CC u3 {1 Actionso No. Date ~{
P 7; g
$5 c2 jig Event Report # Au ju Prevent Recurrence ZZZZZZ Shutdown for refueling outage.
80-01 810101 S 744 C 1 NA ZZ:
I l
' (w) - , , ,
'6 3 iEE'$?)
6 0 .
b cd v .
4 I ' 3
~
Exhibit G -Inst utiiun M F: Forcnl Reason:
A Lituipment Failure (Explain)
. Method-
! . Manual for Picparation of Data
& S: Sch:.luled linary Sheets for I.icensce II. Maintenance of Test 2 Manual Scram.
3 Automatic Scram. Event Repunt (LERI File (NUREG-b C Refueling .
D. Regulatory Restriction '4 -Continut.bions 0161)
E-Operator Training & Ucenio Examinstion 5-Ioad Ibcluction 3 F-Administrative 9-Oller (Explain) Exhibil1 Same Source G Or< rational Es rur(Explain) ~
llOlher(Explain)
(9/77)
L1RRATIVE REPORT UN'IT 2 4
. Jan. 1st Unit shutdown for refueling t
l 6
s t
G wm I
l i
s
\
I i
.1
. . , . . . _ _ - . . , . - . . . _ , _ . , . - . . . , ,, . . _ _ , _ _ _ . _ . . , . . . . . . _ , , . . . , . m,..,, .. . - . . ~ . . . _ _. . . . _
HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTS ,
TO BE REPORTED FOR JANUARY 1980 l
NUMBER DATE COMPLETED DESCRIPTION TvTT4 Replaced s f2-Ju-so ano calibrated SDLC disch. press. guage 2C41-R003 80-5020 12-28-80 Placed tube back in swagloc fitting and tightened on plant service water pump D 2P41-C001D 80-4996 12-29-80 Reprogrammed logic controller
- 2 memory on radwaste control pael 2G11-P001, also repaired both spare controllers that were inop 30-5192 12-29-80 Replaced point card and veri-
- fied proper operation on "Rx/Rw b1dg. cooling tower basin Hi level" alarm 2H11-P700 80-5196 12-29-80 Replaced point card on reac/ rad
'3 b1dg chiller B001B malfunction ,
alarm 2H11-P700 80-5193 12-29-80 Replaced point card on reac/ rad b1dg chiller B001B malfunction alarm 2H11-P700
- 80-3112 1-6-81 Replaced RPIS . probe on CRD module 46-43 2C11-46-43.
80-5289 1-6-81 Adjusted trips on APRMC 2C451-K605-ARH1 per HNP-2-5010, 4 cleaned. and lubricated drive motor on recorder .2C51-R603C, calibrated recorder per HNP 5228 80-5042 1-10-81 Installed size 19, . ITT. Grinnel load guages to. side .of spring
! can 2B21-H-1 on support in Unit 2 drywell i ,
80-3623 1-7-81 Replaced SRM detector " A" . 2 C 51 -
K600A, performed- HNP-2-5026 prior-to installing'new detector-80-4857 1-7 Replaced reed . switch _ and adjusted . limits .on offgas holdup line seal valve 2N62-F085
4 1
80-3366 12-13-30 Replaced pilot gasket solenoid base sub assy. coil and housing [
< assembly gaskets on scram pilot- !
j solenoid 2C11-HCU (26-15)-F113 i 30-5229 1-11-81 Isolated Unit 2 posttreatment sample system and drained water .
- out of sample chamber, flow meter 2011J013 now reading i
- steady i
81-18 1-9-81 On 2E21-F019B cut out hole on conduit and replaced cutout section with 1 1/2" Erickson coupling j 31-19 1-9-81 Retightened existing flex con- I i duit 2E51-F003 on RCIC torus' i suction, also retightened coup- 1 ling and fitting
- 80-5294 1-9-51 Machined down collector rings
- of motor -generator set "B"
- 2B31-S001B on excitor end j 80-5295 1-9-81 Machined down collector rings on the excitor end of motor generation set "A" 2B31-S001A
)
80-5238 1-7-81 Added 110 gallons of Gul fere st -
oil to recire MG set- lube oil reservoir 2B31-S001B i
!. 80-4787 1-3-81 Replaced insulation. ,on 16" butterfly _ valve 2P42-F001B at RBCCW heat exchanger
! 80-5233 1-6-81 Replaced 2 resistors and 1 out-
, put transistor in MV/I (2T47-
- J K303) on drywell- ' cooler 8B i discharge temperature: indicator-l 2T47-R603 l
l 81-63 1-14-81 Removed and cleaned body and-i seat of CRD HCU 30-03 sestem _
{ valve 2C11-30-03 i
31-93 1-14-81 Replaced - bulk head. adaptor and ~
[ 0-ring seal ~ to stop 1eak in CRD i accumulator 2C-11 30-47 j 81-201 1-14-81 - G r o ur.d out and jeathered: out-l surface carbon arc strike area and -performed- mag particle exam per HNP-7938 on X-205 penetra-tion assy. cam.#15-A2-310
S0-109 1-16-30 Removed, functionally tested, disassembled, replaced soit-ware, reassembled, filled, purged, and re FT hydraulic snubber 30-kit. IN11 ->f SR 5 5 31-137 1-17-81 Removed and cleaned strainer on suction strainer for 2G41-C001 and replaced 81-33 1-11-81 Replaced eted and lamps on main steam 3rd stage SJAE3 flow low alarm 2H11-P650 81-135 1-11-81 Shortened and repaired damaged conduit going to torus water RTD 2T48-N075 31-210 1-15-31 Replaced point card to window
- 52 on CR annunciator panel 2H11-P650 31-149 1 14-31 Replaced broken guage glass to
>!G set "2B" outlet temp guage 2331-S0013 on oil cooler 81-139 1-14-81 Cleaned lube cil prelube strainer s 2R43-S001C and inspected bolts on inter oil header to diesel generator 80-4352 1-15-81 Corrected sticking level switch actuator for turbine b1dg.
floor drain sumps high level alarm 2G11-C004ASB 81 2403 1-17-81 Straightened shutter and guide l pins to CRD pump 2C11-C001B
( 80-3902 1-17-81 Repaired as needed leak on I
accumulator for nitrogen purge l system to alleviate problen l
with unit aux.
l l 80-4631 $_-17-81 Tightened packing on RHR loop A l
injection valve 2E11-F017 30-5292 1-20-81 Replaced 0-rings and gaskets on l torus vent purge outlet valve l 2T4 8 F318 - F3 26 80-4733 1-20-81 Lapped seats to RHR pump min.
l flow valves along with removing gates and blueing
1 &
i S0-2631 1-9-81 Dismantled 2G11-C016 pump and
,' installed new shaft, bearings, j shaft sleeve, 0-rings, and oil seals
! S0-4344 1-13-81 Lapped seat ring to C spary "A"
- pump disch check valve 2E21-
- F003A 81-55 1-20-81 Cleaned and blued seats to i torus drywell P system valve l 2748-F209 i 80-4429 1-19-81 Polished out small scars on HPCI turbine exhaust check valve 2E41-F049 sea t ring 30-5259 1-9-81 Disassembled V-13 and -V-12, cleaned and reinsta11ed; removed S V- 4 from line remachined ' seat and lapped, reset lifting pressure to 170 lb and reinstalled 80-4923 12-29-80 Removed seat and blued twice due to first blucing being l unsatisfactory en drywell l pneumatic check valve- 2P70-F020 1 150' elev l 80-5000 1-20-81 Replaced oil CRD 30-47 pressure ;
guage 2C11-HC0-H7 calibrator '
per HNP-2-5504 i 80-4781 1-22-81 Replaced old stem and ' pressure seal with new ones for reheat :
source steam valve 2N11-F004B I to CSD. MSR 2nd stage !
80-3531 1-21-81 Removed and FT hydraulic snub- !
bers 2L31 per HNP-2-3915 80-5266 1-24-81 Installed blade Zuide in ' core on refueling platform 80-2220 1-22-81 Removed discharge valve for "A" RBCCW pump ' 2P42-F005A, removed.
old - s' eater -l iner , packing and. 1 0-rings; cicaned all parts and replaced old lines, packing,.
and oil rings with new ones 81-54 1-21-81' Repaired .as necessary HPCI turbine exhaust manual valve 2E11-F021 in order to pass LLRT
.z. _ _ _ _ _ _ . _ _ _ - _
80-5183 1-15-31 Aligned forward brackets on 1/4 kip snubbers with clevis on snubbers as per Pacific Scien-tific notice 79-2479 1-22-81 Inzpected Limitorque MOVs an main steam isolatien valve leakage control system 2E32 for
- loose locking nuts i n compli-
~
ance with IEC 79-04 79-2478 1-22-81 Inspected the Limitorque MOVs on RCIC system 2E51 for loose locking nuts in compliance with IEC 79-04 79-2477 1-22-81 Inspected the Limitorque MO,Vs on HPCI system 2E41 for loose locking nuts in compliance with IEC 79-04 i