Monthly Operating Rept for Jan 1981
ML19345F567
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/10/1981
From: Kamishlian J
GEORGIA POWER CO.
To:
Shared Package
ML19345F565 List:
References
NUDOCS 8102180425
Download: ML19345F567 (9)


Text

.. - -

~. -~

.~

I L

J l

t i

i OPEPATING DATA REP 0pi J

l L

DOCKET 110. 50-366 l

DHTE j

l COMPLETED BY O

TELEPHONE (912) 367-7781 x 203

-Y y

C OPERAiriac STAlus

. Notes g@

j 1.

Unit tie n e n E.I. Hatch Nuclear Plant Unit 2 y

2.

Repor t 6 ng Per 6 ods 01-61 l

3. L6 censed thernal Pouer (Mut ): 2436

- ~ -

g O

O

4. Haheptate fat 6ng (Cross MWe): 817.0 l

5.

Des 6gn Electrical Rat,ng (Het MWe): 784.0

6. Maximun Dependable Capac6ty (Cros s MWe ): 2W5.7
7. Maxinun Dependable Capac6tg (Het MWe)t 770.9

...***.............+..................................,

l

8. If Changes occur in Capacity Rat ings (Items Hunber 3 Through 7) Since Lart Report, Give Reasonst J

L

9. Power Level To Which Restrfcted, if Ang (Het MWe ll
10. Reasons For Restr6ctions, if Anyt l

)

~~

This Month Yr.-to-Date Cunulateve it. Hours In Reporting Per6cd 744 744 11953

12. Hunber of Hours Reactor Was Cr6tical 0.0 0.0 8233.8
13. Reacter Reserve Shutdown Hours 4.0 0.0 0.0 y

y 0.0

  • ~~ ~

0.0

" ~ ~

7688.3

~

14. Hours Generator On-Line

~

0.0

'15.'Un6L Res er ve Shutdown Hours 0.0 0.0 0

0 17097890 J

' 16. Cross Thernal Energy Generated (MWH).

0 ~ '^

-3045

" '"5400454

~ ~ ~

y 0

5667280

17. Cross Electr6 cal Energy Generated ( MWH ) ~

' -3045

18. Het Electr6 cal Energy Generated (MWH)
19. Unit Service. Factor 0.0 0.0 64.3 J

y 0.0

^~

-0.5

~'

64.3

20. Unit Availab616tg Factor 0.0

^

10.5 58.6

21. Unit Capacity' Factor ( U s 6 ng MDC N et )"
22. Unit Capacity Factor (Us6 ng DER Het)

-0.5

-0.5 57.6 J

_0.0 0.0 11.8 y

23. Unit Forced Outage Pate

. Date, and Duration of. Each ):

'~

t

24. Shutdowns Scheduled Over Hext 6 Months ( Type.

3 L

M

25. If Shut Doun At End Of Report Period. Estinated Date of Startupt
26. Units in Test Status (Pr6or to Connercial Operation >s Forecast Achieved j

' ' ~ ~ ' ' ~ ~ ~ ' ' ~ ~ ~ ~ ~ ~ ~ ~ ~

..u...__....

INITIAL CR!i!CALITY~ ~ '~

~['

IHITIAL ELECTRICITY J

COMNERCIAL OPERATION,. _,.

(

(9/77) p

~....

J

....,...~..._..-.- -

j

-e.

J gs'.u..h.

t

.M6a"

.y v*

s

(

e.v tli A G E D AI L Y UNIT POWEQ LEVEL g

DOCKET HD. 5 0 - 3 4. t.

I On1E COMPLTit.D BY T EL E PHONE ( 912 ) 367-7701 x 203 g

H 0 t4 T tt 01-91 OsY F'fRAGE DnILY FOUER LEVEL D(. Y AVERACE DRILY F0uER LEVEL (nue-Het)

(HWe-Het>

I 1

-3 17

-5

~

2

-3 18

-5 3

-3 19

-4 I

g' 4

-4 20

-3 5

-3 21

-3

~~

4

-4 22

-3 g

g l

23

-4 7

-3 l

8

-4 24

-4 9

-5 25

-5 I

to

-5 26

-5

' - ~

~

11

-5 27

-4 12

-4 28

-4 g

g, 13

-4 29

-5 14

-4

' 30

-4 15

-5 31

-4 g

16

-5

.. - ~ -

i cc=s)

I "dec?)

a R

p' v tr -

e WN 4*9'...

--Mhme..

s50-36f;

DOCKEINO, ll!111' SilUIDOWNS AND POWER ltEI)UC110NS UNil N AME Ilat' h 7 DATE P-10-HI COMPLETED fly

.l. M. Kamishlian REPORT MON 111.lanua ry

'IELEril0NE _21P-36 /-7781 q

llCCH3CC h%,

5 ),

Cause & Corredhe 4 L3 c

ci

{1

.E _t2 g

g5y

~{

7; g

,gm Event u3 Actionso No.

Date

$5 c2 jig Report #

Au ju Prevent Recurrence P

80-01 810101 S

744 C

1 NA ZZ:

ZZZZZZ Shutdown for refueling outage.

I l

' (w)

'6 3

iEE'$?)

6 0

b cd 4

v 3

I Method-Exhibit G -Inst utiiun

~

M F: Forcnl Reason:

S: Sch:.luled A Lituipment Failure (Explain)

!. Manual for Picparation of Data II. Maintenance of Test 2 Manual Scram.

linary Sheets for I.icensce 3 Automatic Scram.

Event Repunt (LERI File (NUREG-b C Refueling D. Regulatory Restriction

'4 -Continut.bions 0161)

E-Operator Training & Ucenio Examinstion 5-Ioad Ibcluction 3

F-Administrative 9-Oller (Explain)

Exhibil1 Same Source G Or< rational Es rur(Explain)

~

(9/77) llOlher(Explain)

1 1

L1RRATIVE REPORT UN'IT 2 4

Jan. 1st Unit shutdown for refueling t

l 6

s t

G wm I

l i

s

\\

I i

.1 m,..,,

. -.. ~... _ _...

HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR JANUARY 1980 l

NUMBER DATE COMPLETED DESCRIPTION TvTT4 f2-Ju-so Replaced ano calibrated SDLC s

disch. press. guage 2C41-R003 80-5020 12-28-80 Placed tube back in swagloc fitting and tightened on plant service water pump D 2P41-C001D 80-4996 12-29-80 Reprogrammed logic controller

  1. 2 memory on radwaste control pael 2G11-P001, also repaired both spare controllers that were inop 30-5192 12-29-80 Replaced point card and veri-fied proper operation on "Rx/Rw b1dg.

cooling tower basin Hi level" alarm 2H11-P700 80-5196 12-29-80 Replaced point card on reac/ rad b1dg chiller B001B malfunction

'3 alarm 2H11-P700 80-5193 12-29-80 Replaced point card on reac/ rad b1dg chiller B001B malfunction alarm 2H11-P700 80-3112 1-6-81 Replaced RPIS. probe on CRD module 46-43 2C11-46-43.

80-5289 1-6-81 Adjusted trips on APRMC 2C451-K605-ARH1 per HNP-2-5010, cleaned. and lubricated drive 4

motor on recorder.2C51-R603C, calibrated recorder per HNP 5228 80-5042 1-10-81 Installed size 19,. ITT. Grinnel load guages to. side.of spring can 2B21-H-1 on support in Unit 2 drywell i

80-3623 1-7-81 Replaced SRM detector " A". 2 C 51 -

K600A, performed-HNP-2-5026 prior-to installing'new detector-80-4857 1-7 Replaced reed

. switch _

and adjusted

. limits

.on offgas holdup line seal valve 2N62-F085

4 1

80-3366 12-13-30 Replaced pilot gasket solenoid base sub assy. coil and housing

[

assembly gaskets on scram pilot-j solenoid 2C11-HCU (26-15)-F113 i

30-5229 1-11-81 Isolated Unit 2

posttreatment sample system and drained water out of sample

chamber, flow meter 2011J013 now reading i

steady i

81-18 1-9-81 On 2E21-F019B cut out hole on conduit and replaced cutout section with 1

1/2" Erickson coupling I

j 31-19 1-9-81 Retightened existing flex con-i duit 2E51-F003 on RCIC torus' i

suction, also retightened coup-1 ling and fitting 80-5294 1-9-51 Machined down collector rings of motor

-generator set "B"

2B31-S001B on excitor end j

80-5295 1-9-81 Machined down collector rings on the excitor end of motor generation set "A" 2B31-S001A

)

80-5238 1-7-81 Added 110 gallons of Gul fere st oil to recire MG set-lube oil reservoir 2B31-S001B i

80-4787 1-3-81 Replaced insulation.,on 16" butterfly _ valve 2P42-F001B at RBCCW heat exchanger 80-5233 1-6-81 Replaced 2 resistors and 1 out-put transistor in MV/I (2T47-J K303) on drywell- ' cooler 8B i

discharge temperature: indicator-l 2T47-R603 l

l 81-63 1-14-81 Removed and cleaned body and-i seat of CRD HCU 30-03 sestem

{

valve 2C11-30-03 31-93 1-14-81 Replaced - bulk head. adaptor and i

[

0-ring seal ~ to stop 1eak in CRD

~

i accumulator 2C-11 30-47 81-201 1-14-81

- G r o ur.d out and jeathered: out-j l

surface carbon arc strike area and -performed-mag particle exam per HNP-7938 on X-205 penetra-tion assy. cam.#15-A2-310

S0-109 1-16-30

Removed, functionally
tested, disassembled, replaced soit-
ware, reassembled,
filled, purged, and re FT hydraulic snubber 30-kit. IN11 ->f SR 5 5 31-137 1-17-81 Removed and cleaned strainer on suction strainer for 2G41-C001 and replaced 81-33 1-11-81 Replaced eted and lamps on main steam 3rd stage SJAE3 flow low alarm 2H11-P650 81-135 1-11-81 Shortened and repaired damaged conduit going to torus water RTD 2T48-N075 31-210 1-15-31 Replaced point card to window
  1. 52 on CR annunciator panel 2H11-P650 31-149 1 14-31 Replaced broken guage glass to

>!G set "2B" outlet temp guage 2331-S0013 on oil cooler 81-139 1-14-81 Cleaned lube cil prelube strainer s 2R43-S001C and inspected bolts on inter oil header to diesel generator 80-4352 1-15-81 Corrected sticking level switch actuator for turbine b1dg.

floor drain sumps high level alarm 2G11-C004ASB 81 2403 1-17-81 Straightened shutter and guide l

pins to CRD pump 2C11-C001B

(

80-3902 1-17-81 Repaired as needed leak on I

accumulator for nitrogen purge l

system to alleviate problen l

with unit aux.

l l

80-4631

$_-17-81 Tightened packing on RHR loop A l

injection valve 2E11-F017 30-5292 1-20-81 Replaced 0-rings and gaskets on l

torus vent purge outlet valve l

2T4 8 F318 - F3 26 80-4733 1-20-81 Lapped seats to RHR pump min.

l flow valves along with removing gates and blueing

1 i

S0-2631 1-9-81 Dismantled 2G11-C016 pump and installed new shaft,

bearings, j

shaft sleeve, 0-rings, and oil seals S0-4344 1-13-81 Lapped seat ring to C spary "A" pump disch check valve 2E21-F003A 81-55 1-20-81 Cleaned and blued seats to i

torus drywell P

system valve 2748-F209 i

80-4429 1-19-81 Polished out small scars on HPCI turbine exhaust check valve 2E41-F049 sea t ring 30-5259 1-9-81 Disassembled V-13 and

-V-12, cleaned and reinsta11ed; removed S V-4 from line remachined

' seat and

lapped, reset lifting pressure to 170 lb and reinstalled 80-4923 12-29-80 Removed seat and blued twice due to first blucing being unsatisfactory en drywell pneumatic check valve-2P70-F020 150' elev 80-5000 1-20-81 Replaced oil CRD 30-47 pressure guage 2C11-HC0-H7 calibrator per HNP-2-5504 i

80-4781 1-22-81 Replaced old stem and ' pressure seal with new ones for reheat source steam valve 2N11-F004B to CSD. MSR 2nd stage 80-3531 1-21-81 Removed and FT hydraulic snub-bers 2L31 per HNP-2-3915 80-5266 1-24-81 Installed blade Zuide in ' core on refueling platform 80-2220 1-22-81 Removed discharge valve for "A"

RBCCW pump ' 2P42-F005A, removed.

old - s' eater -l iner,

packing and.

0-rings; cicaned all parts and replaced old

lines, packing,.

and oil rings with new ones 81-54 1-21-81' Repaired

.as necessary HPCI turbine exhaust manual valve 2E11-F021 in order to pass LLRT

.z.

80-5183 1-15-31 Aligned forward brackets on 1/4 kip snubbers with clevis on snubbers as per Pacific Scien-tific notice 79-2479 1-22-81 Inzpected Limitorque MOVs an main steam isolatien valve leakage control system 2E32 for loose locking nuts i n compli-

~

ance with IEC 79-04 79-2478 1-22-81 Inspected the Limitorque MOVs on RCIC system 2E51 for loose locking nuts in compliance with IEC 79-04 79-2477 1-22-81 Inspected the Limitorque MO,Vs on HPCI system 2E41 for loose locking nuts in compliance with IEC 79-04 i

i 9

9