ML19345F567
| ML19345F567 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/10/1981 |
| From: | Kamishlian J GEORGIA POWER CO. |
| To: | |
| Shared Package | |
| ML19345F565 | List: |
| References | |
| NUDOCS 8102180425 | |
| Download: ML19345F567 (9) | |
Text
.. - -
~. -~
.~
I L
J l
t i
i OPEPATING DATA REP 0pi J
l L
DOCKET 110. 50-366 l
DHTE j
l COMPLETED BY O
TELEPHONE (912) 367-7781 x 203
-Y y
C OPERAiriac STAlus
. Notes g@
j 1.
Unit tie n e n E.I. Hatch Nuclear Plant Unit 2 y
2.
Repor t 6 ng Per 6 ods 01-61 l
- 3. L6 censed thernal Pouer (Mut ): 2436
- ~ -
g O
O
- 4. Haheptate fat 6ng (Cross MWe): 817.0 l
5.
Des 6gn Electrical Rat,ng (Het MWe): 784.0
- 6. Maximun Dependable Capac6ty (Cros s MWe ): 2W5.7
- 7. Maxinun Dependable Capac6tg (Het MWe)t 770.9
...***.............+..................................,
l
- 8. If Changes occur in Capacity Rat ings (Items Hunber 3 Through 7) Since Lart Report, Give Reasonst J
L
- 9. Power Level To Which Restrfcted, if Ang (Het MWe ll
- 10. Reasons For Restr6ctions, if Anyt l
)
~~
This Month Yr.-to-Date Cunulateve it. Hours In Reporting Per6cd 744 744 11953
- 12. Hunber of Hours Reactor Was Cr6tical 0.0 0.0 8233.8
- 13. Reacter Reserve Shutdown Hours 4.0 0.0 0.0 y
y 0.0
- ~~ ~
0.0
" ~ ~
7688.3
~
- 14. Hours Generator On-Line
~
0.0
'15.'Un6L Res er ve Shutdown Hours 0.0 0.0 0
0 17097890 J
' 16. Cross Thernal Energy Generated (MWH).
0 ~ '^
-3045
" '"5400454
~ ~ ~
y 0
5667280
- 17. Cross Electr6 cal Energy Generated ( MWH ) ~
' -3045
- 18. Het Electr6 cal Energy Generated (MWH)
- 19. Unit Service. Factor 0.0 0.0 64.3 J
y 0.0
^~
-0.5
~'
64.3
- 20. Unit Availab616tg Factor 0.0
^
10.5 58.6
- 21. Unit Capacity' Factor ( U s 6 ng MDC N et )"
- 22. Unit Capacity Factor (Us6 ng DER Het)
-0.5
-0.5 57.6 J
_0.0 0.0 11.8 y
- 23. Unit Forced Outage Pate
. Date, and Duration of. Each ):
'~
t
- 24. Shutdowns Scheduled Over Hext 6 Months ( Type.
3 L
M
- 25. If Shut Doun At End Of Report Period. Estinated Date of Startupt
- 26. Units in Test Status (Pr6or to Connercial Operation >s Forecast Achieved j
' ' ~ ~ ' ' ~ ~ ~ ' ' ~ ~ ~ ~ ~ ~ ~ ~ ~
..u...__....
INITIAL CR!i!CALITY~ ~ '~
~['
IHITIAL ELECTRICITY J
COMNERCIAL OPERATION,. _,.
(
(9/77) p
~....
J
....,...~..._..-.- -
j
-e.
J gs'.u..h.
t
.M6a"
.y v*
s
(
e.v tli A G E D AI L Y UNIT POWEQ LEVEL g
DOCKET HD. 5 0 - 3 4. t.
I On1E COMPLTit.D BY T EL E PHONE ( 912 ) 367-7701 x 203 g
H 0 t4 T tt 01-91 OsY F'fRAGE DnILY FOUER LEVEL D(. Y AVERACE DRILY F0uER LEVEL (nue-Het)
(HWe-Het>
I 1
-3 17
-5
~
2
-3 18
-5 3
-3 19
-4 I
g' 4
-4 20
-3 5
-3 21
-3
~~
4
-4 22
-3 g
g l
23
-4 7
-3 l
8
-4 24
-4 9
-5 25
-5 I
to
-5 26
-5
' - ~
~
11
-5 27
-4 12
-4 28
-4 g
g, 13
-4 29
-5 14
-4
' 30
-4 15
-5 31
-4 g
16
-5
.. - ~ -
i cc=s)
I "dec?)
a R
p' v tr -
e WN 4*9'...
--Mhme..
s50-36f;
- DOCKEINO, ll!111' SilUIDOWNS AND POWER ltEI)UC110NS UNil N AME Ilat' h 7 DATE P-10-HI COMPLETED fly
.l. M. Kamishlian REPORT MON 111.lanua ry
'IELEril0NE _21P-36 /-7781 q
llCCH3CC h%,
5 ),
Cause & Corredhe 4 L3 c
ci
{1
.E _t2 g
g5y
~{
7; g
,gm Event u3 Actionso No.
Date
$5 c2 jig Report #
Au ju Prevent Recurrence P
80-01 810101 S
744 C
1 NA ZZ:
ZZZZZZ Shutdown for refueling outage.
I l
' (w)
'6 3
iEE'$?)
6 0
b cd 4
v 3
I Method-Exhibit G -Inst utiiun
~
M F: Forcnl Reason:
S: Sch:.luled A Lituipment Failure (Explain)
!. Manual for Picparation of Data II. Maintenance of Test 2 Manual Scram.
linary Sheets for I.icensce 3 Automatic Scram.
Event Repunt (LERI File (NUREG-b C Refueling D. Regulatory Restriction
'4 -Continut.bions 0161)
E-Operator Training & Ucenio Examinstion 5-Ioad Ibcluction 3
F-Administrative 9-Oller (Explain)
Exhibil1 Same Source G Or< rational Es rur(Explain)
~
(9/77) llOlher(Explain)
1 1
L1RRATIVE REPORT UN'IT 2 4
Jan. 1st Unit shutdown for refueling t
l 6
s t
G wm I
l i
s
\\
I i
.1 m,..,,
. -.. ~... _ _...
HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR JANUARY 1980 l
NUMBER DATE COMPLETED DESCRIPTION TvTT4 f2-Ju-so Replaced ano calibrated SDLC s
disch. press. guage 2C41-R003 80-5020 12-28-80 Placed tube back in swagloc fitting and tightened on plant service water pump D 2P41-C001D 80-4996 12-29-80 Reprogrammed logic controller
- 2 memory on radwaste control pael 2G11-P001, also repaired both spare controllers that were inop 30-5192 12-29-80 Replaced point card and veri-fied proper operation on "Rx/Rw b1dg.
cooling tower basin Hi level" alarm 2H11-P700 80-5196 12-29-80 Replaced point card on reac/ rad b1dg chiller B001B malfunction
'3 alarm 2H11-P700 80-5193 12-29-80 Replaced point card on reac/ rad b1dg chiller B001B malfunction alarm 2H11-P700 80-3112 1-6-81 Replaced RPIS. probe on CRD module 46-43 2C11-46-43.
80-5289 1-6-81 Adjusted trips on APRMC 2C451-K605-ARH1 per HNP-2-5010, cleaned. and lubricated drive 4
motor on recorder.2C51-R603C, calibrated recorder per HNP 5228 80-5042 1-10-81 Installed size 19,. ITT. Grinnel load guages to. side.of spring can 2B21-H-1 on support in Unit 2 drywell i
80-3623 1-7-81 Replaced SRM detector " A". 2 C 51 -
- K600A, performed-HNP-2-5026 prior-to installing'new detector-80-4857 1-7 Replaced reed
. switch _
and adjusted
. limits
.on offgas holdup line seal valve 2N62-F085
4 1
80-3366 12-13-30 Replaced pilot gasket solenoid base sub assy. coil and housing
[
assembly gaskets on scram pilot-j solenoid 2C11-HCU (26-15)-F113 i
30-5229 1-11-81 Isolated Unit 2
posttreatment sample system and drained water out of sample
- chamber, flow meter 2011J013 now reading i
steady i
81-18 1-9-81 On 2E21-F019B cut out hole on conduit and replaced cutout section with 1
1/2" Erickson coupling I
j 31-19 1-9-81 Retightened existing flex con-i duit 2E51-F003 on RCIC torus' i
suction, also retightened coup-1 ling and fitting 80-5294 1-9-51 Machined down collector rings of motor
-generator set "B"
2B31-S001B on excitor end j
80-5295 1-9-81 Machined down collector rings on the excitor end of motor generation set "A" 2B31-S001A
)
80-5238 1-7-81 Added 110 gallons of Gul fere st oil to recire MG set-lube oil reservoir 2B31-S001B i
80-4787 1-3-81 Replaced insulation.,on 16" butterfly _ valve 2P42-F001B at RBCCW heat exchanger 80-5233 1-6-81 Replaced 2 resistors and 1 out-put transistor in MV/I (2T47-J K303) on drywell- ' cooler 8B i
discharge temperature: indicator-l 2T47-R603 l
l 81-63 1-14-81 Removed and cleaned body and-i seat of CRD HCU 30-03 sestem
{
valve 2C11-30-03 31-93 1-14-81 Replaced - bulk head. adaptor and i
[
0-ring seal ~ to stop 1eak in CRD
~
i accumulator 2C-11 30-47 81-201 1-14-81
- G r o ur.d out and jeathered: out-j l
surface carbon arc strike area and -performed-mag particle exam per HNP-7938 on X-205 penetra-tion assy. cam.#15-A2-310
S0-109 1-16-30
- Removed, functionally
- tested, disassembled, replaced soit-
- ware, reassembled,
- filled, purged, and re FT hydraulic snubber 30-kit. IN11 ->f SR 5 5 31-137 1-17-81 Removed and cleaned strainer on suction strainer for 2G41-C001 and replaced 81-33 1-11-81 Replaced eted and lamps on main steam 3rd stage SJAE3 flow low alarm 2H11-P650 81-135 1-11-81 Shortened and repaired damaged conduit going to torus water RTD 2T48-N075 31-210 1-15-31 Replaced point card to window
- 52 on CR annunciator panel 2H11-P650 31-149 1 14-31 Replaced broken guage glass to
>!G set "2B" outlet temp guage 2331-S0013 on oil cooler 81-139 1-14-81 Cleaned lube cil prelube strainer s 2R43-S001C and inspected bolts on inter oil header to diesel generator 80-4352 1-15-81 Corrected sticking level switch actuator for turbine b1dg.
floor drain sumps high level alarm 2G11-C004ASB 81 2403 1-17-81 Straightened shutter and guide l
pins to CRD pump 2C11-C001B
(
80-3902 1-17-81 Repaired as needed leak on I
accumulator for nitrogen purge l
system to alleviate problen l
with unit aux.
l l
80-4631
$_-17-81 Tightened packing on RHR loop A l
injection valve 2E11-F017 30-5292 1-20-81 Replaced 0-rings and gaskets on l
torus vent purge outlet valve l
2T4 8 F318 - F3 26 80-4733 1-20-81 Lapped seats to RHR pump min.
l flow valves along with removing gates and blueing
1 i
S0-2631 1-9-81 Dismantled 2G11-C016 pump and installed new shaft,
- bearings, j
shaft sleeve, 0-rings, and oil seals S0-4344 1-13-81 Lapped seat ring to C spary "A" pump disch check valve 2E21-F003A 81-55 1-20-81 Cleaned and blued seats to i
torus drywell P
system valve 2748-F209 i
80-4429 1-19-81 Polished out small scars on HPCI turbine exhaust check valve 2E41-F049 sea t ring 30-5259 1-9-81 Disassembled V-13 and
-V-12, cleaned and reinsta11ed; removed S V-4 from line remachined
' seat and
- lapped, reset lifting pressure to 170 lb and reinstalled 80-4923 12-29-80 Removed seat and blued twice due to first blucing being unsatisfactory en drywell pneumatic check valve-2P70-F020 150' elev 80-5000 1-20-81 Replaced oil CRD 30-47 pressure guage 2C11-HC0-H7 calibrator per HNP-2-5504 i
80-4781 1-22-81 Replaced old stem and ' pressure seal with new ones for reheat source steam valve 2N11-F004B to CSD. MSR 2nd stage 80-3531 1-21-81 Removed and FT hydraulic snub-bers 2L31 per HNP-2-3915 80-5266 1-24-81 Installed blade Zuide in ' core on refueling platform 80-2220 1-22-81 Removed discharge valve for "A"
RBCCW pump ' 2P42-F005A, removed.
old - s' eater -l iner,
packing and.
0-rings; cicaned all parts and replaced old
- lines, packing,.
and oil rings with new ones 81-54 1-21-81' Repaired
.as necessary HPCI turbine exhaust manual valve 2E11-F021 in order to pass LLRT
.z.
80-5183 1-15-31 Aligned forward brackets on 1/4 kip snubbers with clevis on snubbers as per Pacific Scien-tific notice 79-2479 1-22-81 Inzpected Limitorque MOVs an main steam isolatien valve leakage control system 2E32 for loose locking nuts i n compli-
~
ance with IEC 79-04 79-2478 1-22-81 Inspected the Limitorque MOVs on RCIC system 2E51 for loose locking nuts in compliance with IEC 79-04 79-2477 1-22-81 Inspected the Limitorque MO,Vs on HPCI system 2E41 for loose locking nuts in compliance with IEC 79-04 i
i 9
9